Unincorporated Union Parish, Louisiana requires a building permit for new construction through the Union Parish Police Jury1. Unincorporated Union Parish has no parish zoning2. Inside Farmerville, the general manager of public services issues town building permits3. Septic permits for Union Parish addresses remain with the state health officer through the parish health unit4.
Do you need a building permit in Union Parish, Louisiana?
Unincorporated Union Parish requires a building permit for new construction and enforces the Louisiana State Uniform Construction Code.
Unincorporated Union Parish requires a building permit for new construction and enforces the Louisiana State Uniform Construction Code1,5. Inside Farmerville, town building permits come from the general manager of public services for construction, extensions and alterations3. Septic permits remain with the state health officer through the parish health unit4. A new-construction plan review must be completed before the permit is issued, and the application must carry both E-911 and sanitation signatures1. The Union Parish Police Jury fee is $100, and Lagniappe Inspection Services collects $150 for applicable permits other than mobile homes7. The Police Jury accepts checks, money orders and credit cards, adds a 4% card charge, and does not accept cash7. A qualifying farm structure such as a barn, shed or poultry house is exempt from construction-code enforcement, but the parish may still require a building permit; residences and structures attached to them do not qualify8. A qualifying owner may supervise work on a personal residence with the required affidavit while licensed subcontractors must remain licensed6; the exemption generally limits the owner to 1 residence per year, with a qualifying marital-status or employment-relocation exception, and concerns contractor licensing rather than building permits6.
Who issues building permits and inspections in Union Parish?
For unincorporated Union Parish building permits, begin with the Union Parish E-911 Administration Office at 100 E Bayou St., Suite 102 in Farmerville or call 318-368-0911.
For unincorporated Union Parish building permits, begin with the Union Parish E-911 Administration Office at 100 E Bayou St., Suite 102 in Farmerville or call 318-368-09117. The office handles building-permit applications on weekdays from 8:00 AM to 4:00 PM, including lunch, and asks for the road name and approximate distance to the nearest 911 neighbor7. After E-911 and sanitation sign the application, take it, any required flood-elevation documents and the new-construction plan review to the Union Parish Police Jury, which issues the building permit once the qualifications are met1. Permit-covered work requires inspections, and the applicant must contact the building inspector; a third-party inspector must send inspection records to the Police Jury and Building Official1.
Does Union Parish have zoning?
Unincorporated Union Parish has no parish zoning rule setting zoning districts, minimum dwelling size, ordinary minimum lot size, setbacks, lot coverage or building height, or restricting accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping.
Unincorporated Union Parish has no parish zoning rule setting zoning districts, minimum dwelling size, ordinary minimum lot size, setbacks, lot coverage or building height, or restricting accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping2. Certain qualifying single-family subdivisions outside incorporated areas remain subject to a state rule requiring 22,500 square feet of lot area and 125 feet of frontage, along with suitable sewage disposal and water systems9. A division into 5 or more lots, any under 3 acres, falls within the parish subdivision definition, subject to its exclusions, and needs Police Jury plat approval before lot sales10.
How do septic permits work in Union Parish?
Louisiana's state health officer issues individual sewerage-system permits, while the local parish health unit must be notified before installation and its sanitarian handles final approval.
Louisiana's state health officer issues individual sewerage-system permits, while the local parish health unit must be notified before installation and its sanitarian handles final approval4. State approval is required before a system is installed, altered or operated, and the approved plans and specifications control the installation4. Final approval follows installation verification and receipt of the licensed installer's certification4. For a lot in a formal subdivision, the Office of Public Health must approve the recorded plat or property survey before issuing the permit4. In Union Parish subdivisions governed by the parish ordinance, sewage-disposal facilities must be approved by and built under the supervision of the parish health unit when no sanitary sewer is accessible; the plat must state that requirement10. Only about 1.4% of Union Parish soils are rated without severe limits for a conventional drain field, so make septic feasibility an early purchase contingency11.
Can you live in an RV or tiny home in Union Parish?
Unincorporated Union Parish does not restrict RV or tiny-home occupancy through parish zoning.
Unincorporated Union Parish does not restrict RV or tiny-home occupancy through parish zoning2. A tiny home that qualifies as new construction still enters the parish building-permit and inspection process, and a mobile-home application begins with the E-911 office1,7. Any individual sewerage system in Union Parish still needs state approval12. Off-grid wastewater options are limited: an individual system is allowed when community sewer is unavailable or infeasible, and alternative systems remain subject to state approval12. For construction inside Farmerville, ask the general manager of public services about the town building permit3.
Building a home in unincorporated Union Parish: the steps, in order
Contact the E-911 Administration Office with the road name and approximate distance to the nearest 911 neighbor, then obtain the address and building-permit application.
- Contact the E-911 Administration Office with the road name and approximate distance to the nearest 911 neighbor, then obtain the address and building-permit application7.
- Contact the parish health unit for the sewerage-system permit and sanitation signature before installation4.
- Complete the required new-construction plan review1.
- If the site is in a flood zone, obtain a Base Flood Elevation Certificate and document that a licensed surveyor will provide the final Elevation Certificate1.
- Take the signed application, plans and any flood documents to the Union Parish Police Jury and pay the applicable parish and inspection-service fees1,7.
- Contact the building inspector for required inspections and make sure any third-party records reach the Police Jury and Building Official1.
- For a state-highway driveway, obtain a signed and numbered LaDOTD Access Connection Permit before construction13.
What should you check before buying land in Union Parish?
Check flood status before committing: a flood-zone building site needs a Base Flood Elevation Certificate and a commitment for a licensed surveyor's final Elevation Certificate before the building permit can issue.
Check flood status before committing: a flood-zone building site needs a Base Flood Elevation Certificate and a commitment for a licensed surveyor's final Elevation Certificate before the building permit can issue1. Test septic feasibility early because only about 1.4% of Union Parish soils are rated without severe limits for a conventional drain field11. In a subdivision, accessible public sewer and public water must be extended to each lot; where sewer is inaccessible, the parish health unit must approve and supervise sewage-disposal facilities, and the plat must carry that requirement10. Confirm legal road access and determine whether a driveway connects to a state highway, where a LaDOTD permit is required before construction13. A new water well must be drilled by a licensed contractor and registered within 30 days; domestic wells follow post-installation notification rules14.
Watch-outs
- The E-911 office starts the application, but the Union Parish Police Jury issues the building permit after required signatures, plans and flood documents are assembled1,7.
- Flood-zone sites need a Base Flood Elevation Certificate and documentation for a licensed surveyor's final Elevation Certificate before permit issuance1.
- Only about 1.4% of Union Parish soils are rated without severe limits for a conventional septic drain field, so confirm system feasibility before buying11.
- We could not confirm Union Parish's certificate-of-occupancy practice; ask the Police Jury before planning move-in or utility timing15.
Sources
15 official pages, each quoted and re-checked · written October 11, 2026
- Steps for receiving a Building Permit in Union Parish
- Louisiana law on county zoning and building authority
- Town of Farmerville: Sec. 5-3. Building permits required; fees (Union Parish)
- Louisiana Administrative Code Title 51, Part XIII, Sewage Disposal
- State of Louisiana Uniform Construction Code Law and Rules and Regulations
- Louisiana Revised Statutes § 37:2157 — Exemptions (Louisiana statewide rule)
- Steps for receiving a Building Permit in Union Parish
- legis.la.gov
- RS 33:106.1 — Planning commissions; exempt subdivisions; septic tanks and field drains permitted (Louisiana statewide rule)
- Union Parish Police Jury Regular Meeting Minutes, February 4, 2025 — Ordinance No. UPPJ975
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule)
- LaDOTD Access Connections Policy (Louisiana statewide rule)
- Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule)
- Union Parish Police Jury (uppj.org)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Union Parish means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.