Long County, Georgia requires a building permit from Code Enforcement before anyone constructs, alters, repairs or removes a building, and the county's land development code sets the zoning1. Planning and Zoning manages county zoning and publishes a parcel zoning map2. Septic permits for every address in Long County come from Long County Environmental Health, part of the Coastal Health District3.
Do you need a building permit in Long County, Georgia?
Yes.
Yes. Long County's land development code makes it unlawful to construct, alter, repair, remove or demolish a building, swimming pool, manufactured home or structure without first applying to the Building Official and obtaining the required permit1. Code Enforcement publishes downloadable applications for a building permit, utility-building relocation, building relocation and an exit permit4. A new building cannot be occupied until the Building Official issues a Certificate of Occupancy, and the county's published instructions say a final inspection must be completed before one is issued1,10. Georgia's mandatory construction codes apply statewide, and counties may require permits and charge for them11,12. The county page does not list every exception, the current code edition or the full inspection sequence, so describe the work to Code Enforcement before ordering materials4. An owner building their own Georgia home can be exempt from state contractor licensing, but that exemption does not waive Long County permits, zoning, codes or inspections8.
Who is the Long County building department, and how do you reach it?
Long County Code Enforcement is the permit contact: the office publishes permit applications and takes questions about permits or inspections at (912) 545-3683 and codeenforcement@longcountyga.gov.
Long County Code Enforcement is the permit contact: the office publishes permit applications and takes questions about permits or inspections at (912) 545-3683 and codeenforcement@longcountyga.gov4. The office is at 468 S McDonald St, Ludowici, GA 313164. Long County's published process is only partial, so ask which form is required, what plans and supporting approvals must accompany it, how fees are calculated and which inspections must be scheduled4. Planning and Zoning is a separate county contact for parcel zoning and development questions at (912) 424-7880 and planningandzoning@longcountyga.gov2. For county-road access, the Road Department takes road-work and culvert inquiries at (912) 545-2334, while the culvert permit itself comes from Code Enforcement13.
Does Long County, Georgia have zoning, and who administers it?
Yes.
Yes. Long County Planning and Zoning manages the county's zoning and development needs and ordinances2. The land development code applies to all land and structures within the City of Ludowici and Long County, and the county is divided into the districts that code names on its zoning map1. Because the same code covers the city and unincorporated land, confirm with Planning and Zoning whether a parcel sits inside Ludowici city limits before deciding which office to approach2,4. Planning and Zoning tells applicants to use the zoning map and call the department for parcel-specific questions2. Dimensional standards depend on the district. In the Agriculture Forestry (AF) district, the minimum lot is 5 acres (217,800 square feet) with 200 feet of road frontage and width, setbacks are 50 feet front, 40 feet side and 50 feet rear, and a home needs at least 1,000 square feet of ground floor (900 if two or more stories)14. In the Rural Residential (RR) district, the minimum lot is one acre (43,560 square feet) with 150 feet of frontage and 100 feet of width, setbacks are 35 feet front, 10 feet side and 20 feet rear, and a home needs at least 900 square feet of ground floor15. Both districts add a wetlands setback of 200 feet or 36 inches above flood stage14,15. Sources we reviewed do not confirm lot coverage or building height, so get the parcel's district and the current dimensional table before designing1. A land division also deserves early review, because Long County Zoning and Planning considers subdivision approvals16.
How do septic permits work in Long County?
Long County Environmental Health, part of the Coastal Health District, handles onsite sewage permitting and inspection for the county.
Long County Environmental Health, part of the Coastal Health District, handles onsite sewage permitting and inspection for the county3. Reach the Environmental Health Office at (912) 545-2107 or visit 584 N. Macon Street, Ludowici, GA 3131617. No one may begin physical development of a lot where an onsite system will be used, or install one, without first obtaining a construction permit from the County Health Department, and repairs, replacements and additions also require permitting and inspection3,5. The County Board of Health must approve or disapprove a completed application within 20 days3. This applies to every address in Long County, city or unincorporated, because building permits and zoning do not move septic review away from Environmental Health3. The County Board of Health must find the site suitable before issuing the permit, and written approval after final inspection is required before the system is backfilled or used5,18. Only about 0.2% of Long County soils are rated without severe limits for a conventional septic drain field, so make the site evaluation an early purchase contingency and budget for a nonstandard design if the evaluation requires one19. Public or community sewer generally must be used when available within 200 feet of the property line or in an abutting public right-of-way5.
Can you live in an RV or tiny home on your land in Long County?
Long County's code allows travel trailers and motor homes only at a site specifically designed for them in a manufactured home park, an authorized recreation site, or a private lot designed and restricted to recreational or vacation use.
Long County's code allows travel trailers and motor homes only at a site specifically designed for them in a manufactured home park, an authorized recreation site, or a private lot designed and restricted to recreational or vacation use6. On a lot in a residential subdivision, a travel trailer may not be used as a residence, occupied permanently by household members or guests, or rented out6. We could not confirm the county's temporary-camping rules or what applies on a rural acreage outside a subdivision, so ask Planning and Zoning about the parcel and proposed duration2. A site-built or modular tiny home is a dwelling under Georgia's framework and must satisfy applicable building codes plus local approval for zoning, location, foundation type and size7. Long County's parcel district therefore matters before choosing a tiny-home plan2. A manufactured home follows a different path: a licensed installer must obtain a Georgia installation permit, and local zoning, siting and utility rules can still control the parcel20. Off-grid sanitation is not a way around health review because approved alternative systems and qualifying composting toilets remain subject to applicable onsite-sewage permits and inspections5.
What are the steps to build a home in Long County, Georgia?
Ask Planning and Zoning to confirm whether the parcel is in Ludowici or unincorporated Long County and identify its zoning district and development standards.
- Ask Planning and Zoning to confirm whether the parcel is in Ludowici or unincorporated Long County and identify its zoning district and development standards2,4.
- Call Long County Environmental Health for site review and the onsite sewage construction permit before finalizing the home and drain-field locations5,17.
- Download the applicable permit application and ask Code Enforcement what plans, fees and inspections apply to the project4. Expect a final inspection before a Certificate of Occupancy is issued1,10.
- If acting as your own contractor, use Georgia's owner-builder licensing exemption only after confirming the project still meets every county permit, code and zoning requirement8.
- For a county-road culvert, obtain the $50 permit through Code Enforcement; for work in a state-highway right-of-way, obtain the required GDOT permit before construction13,21.
- Do not backfill or use the septic system until the County Board of Health completes final inspection and gives written approval18.
What should you check before buying land in Long County?
Start with the zoning map, then have Planning and Zoning confirm the parcel's district, permitted use and dimensional standards rather than relying on a listing description.
Start with the zoning map, then have Planning and Zoning confirm the parcel's district, permitted use and dimensional standards rather than relying on a listing description2. Septic feasibility is the largest physical due-diligence issue: only about 0.2% of county soils are rated without severe limits for a conventional drain field19. Long County is flat and heavily wooded, with 100% of land at a slope of 15% or less and about 86% forest cover, so clearing, drainage and wet-site conditions may matter more than steep grading19. Check mapped flood risk with Planning and Zoning because Georgia communities administer their own floodplain ordinances2,22. Confirm legal road access and whether the entrance meets county culvert rules or needs a GDOT permit13,21. Long County's effective property-tax rate is about 1%, with a median annual bill near $1,95919.
Watch-outs
- Long County publishes building-permit applications but does not publish every construction exception, fee or inspection step on its permit page, so get a project-specific list from Code Enforcement before work begins4.
- Only about 0.2% of Long County soils are rated without severe limits for a conventional drain field, so make Environmental Health approval a purchase contingency rather than assuming standard septic will work17,19.
- Long County's code does not allow a travel trailer to be used as a residence or rented out on a lot in a residential subdivision; we could not confirm temporary-camping or county-specific tiny-home rules, so get a parcel-specific answer from Planning and Zoning2,6.
Sources
22 official pages, each quoted and re-checked · written October 10, 2026
- Code Enforcement
- Planning & Zoning
- Long County Health Department (2026 county census)
- Code Enforcement
- Manual for On-Site Sewage Management Systems (Georgia statewide rule)
- library.municode.com
- Georgia Tiny House Fact Sheet (Georgia statewide rule)
- Residential and Commercial General Contractors Frequently Asked Questions (2026 county census)
- Water Well Standards (Georgia statewide rule)
- Code Enforcement
- Mandatory and Permissive State Codes (Georgia statewide rule)
- Administration and Enforcement of State Minimum Codes (Georgia statewide rule)
- Long County Road Department (longcountyga.gov)
- Sec. 126-24. AF Agriculture Forestry District
- Sec. 126-25. RR Rural Residential District
- Public Notices
- Long County Environmental Health Office (coastalhealthdistrict.org)
- Manual for On-Site Sewage Management Systems (Georgia statewide rule)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Manufactured Housing (Georgia statewide rule)
- Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule)
- Floodplain Management (Georgia statewide rule)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Long County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.