Alpine County, California requires permits for new homes and most construction, and the county enforces zoning through Title 18.12 Building Safety reviews plans and performs inspections, while Environmental Health permits residential septic systems.34
At a glance
- Building permit
- Required for a new home and most construction1
- Zoning
- County zoning applies; standards vary by district25
- Septic
- Environmental Health approval is required before building permits6
- RV living
- Temporary private-site occupancy is limited to 16 days per calendar year without an occupancy permit extension7
- Owner-builder
- Allowed subject to residence, work and resale conditions8
- Water well
- A county permit is required for construction, deepening, repair or destruction9
Who to call
Building permits
Alpine County Building Safety Division
Building permits, plan checks, inspections and county building requirements
50 Diamond Valley Rd, Markleeville, CA 96120
Planning & zoning
Alpine County Planning Division
Zoning, development review, maps, special-event permits and code enforcement
50 Diamond Valley Rd, Markleeville, CA 96120
Septic permits
Alpine County Health Department, Environmental Health
Residential septic-system permitting and installation inspections
Health and Human Services, 75 A Diamond Valley Rd, Markleeville, CA 96120
Roads & driveways
Alpine County Engineering Department
County-road encroachment permits, including driveway access
50 Diamond Valley Rd, Markleeville, CA 96120
Contact details are copied from each office’s official page and were checked against it on September 27, 2026.
Do you need a building permit in Alpine County, California?
Yes. Alpine County requires a separate permit for new homes and generally requires permits for construction, alteration, repair, movement, improvement, removal, conversion or demolition.1 A one-story detached tool shed, storage shed, playhouse or similar accessory structure may be exempt when its floor area does not exceed 120 square feet, but exempt work still must comply with applicable codes and ordinances.1
The county uses plan check and jobsite inspections to enforce building standards.3 Alpine County also allows an owner-builder permit pathway, but the owner assumes responsibility for the work and worker safety; the county places conditions on who performs the work, principal-residence occupancy and later sales.8 Owner-builder status is not a waiver of the building permit itself.8
Who issues Alpine County building permits, and how do you apply?
The Alpine County Building Safety Division issues building permits, performs plan checks and conducts building inspections.3 The office is at 50 Diamond Valley Rd in Markleeville and can be reached at 530-694-2140.3 Applications must be submitted through the county's online portal with complete, scaled PDF plans signed by the responsible preparer or design professional.10
The applicant must route plans to applicable agencies, obtain their approvals and pay their fees before Building Safety will issue the permit.10 Alpine County publishes valuation-based permit fees and a plan-review deposit estimated at $1.00 per square foot up to $2,500.00, subject to the Building Official's determination; other inspection, utility, fire, school and location-specific charges may apply.11
Does Alpine County have zoning?
Alpine County has countywide zoning under Title 18, with allowed uses, setbacks, parking requirements and height limits varying by zoning district.2 For the creation of new residential lots, published minimum lot sizes range from 1,500 square feet to 5.0 acres, while Planned Development standards may be modified through site-specific review.5
A parcel's zoning matters more than a countywide shorthand. In the AG Agriculture Zone, the standard front, side and rear yards are each 30 feet unless changed for a conditional use.12 The Planning Division handles the General Plan, zoning ordinance, maps, development review and code enforcement.13 Alpine County's minimum dwelling-size rule and a specific local occupancy rule for tiny homes could not be confirmed; ask Planning and Building Safety about the parcel and proposed unit before purchase.
How do septic permits work in Alpine County?
Alpine County Health Department Environmental Health permits residential septic systems and inspects their installation.4 For construction needing a new or replacement onsite wastewater treatment system, submit a permit application and scaled plot plan to Environmental Health; that approval must come before Building Safety can issue its permit.6
Site feasibility deserves early attention: only 0.4% of mapped county soils are rated without severe limitations for a conventional septic drain field.14 That soil statistic does not decide an individual parcel, but it makes a parcel-specific evaluation especially important. Alternative or supplemental systems require annual inspection, and service inspections trigger written reporting requirements.15 Cesspools, surface effluent discharge and systems dedicated to substantial RV holding-tank waste are not authorized.16
Can you live in an RV or tiny home in Alpine County?
Alpine County permits temporary RV occupancy on a private site owned by the user, or used with the owner's written consent, for no more than 16 days in a calendar year unless the Planning Commission approves an occupancy-permit extension.7 Living or sleeping in an RV is also allowed in an approved public or private recreational trailer park or camping area equipped and operated for that use.7
Storage is different from occupancy: the county's storage exception covers one mobile home or RV only when it is never occupied, has no utility connections and avoids required yard and sight-distance areas.7 We could not confirm Alpine County's specific occupancy standard for a tiny home, so take the proposed design and parcel number to Planning and Building Safety before treating a small dwelling as legal housing. Manufactured homes have separate zoning, foundation, engineering and compatibility conditions.17
Building a home in Alpine County: what are the steps?
- Ask the Planning Division to confirm the parcel's zoning, allowed residential use, setbacks and any site-specific review.18
- Confirm legal access; a driveway or other work in a county road right-of-way requires an encroachment permit from Engineering.19
- Resolve water and wastewater early. A new or replacement septic system needs Environmental Health approval before a building permit, and well construction requires a county permit.69
- Submit the complete building application and scaled PDF plans through the online portal, then route them for required agency sign-offs.10
- Pay final permit fees after the drawings and supporting documents are approved, then schedule the required construction inspections with Building Safety.113
What should you check before buying land in Alpine County?
Start with buildability, not acreage alone. Only 8.2% of Alpine County land has a slope of 15% or less, and 0.4% of mapped soils avoid a severe conventional-drain-field limitation.2014 Ask Planning for the parcel's zoning and development standards, Environmental Health about septic and well feasibility, and Engineering about driveway access before making the purchase contingent-free.132122
Utility requirements depend on location. Projects in the Bear Valley, Kirkwood and Markleeville service areas need the applicable water or sewer provider's documented approval before building-permit issuance.23 Floodplain development requirements could not be confirmed, so ask Planning whether the parcel lies in a mapped hazard area and what current review applies. Budget beyond the land price: the typical home-insurance premium is $3,122 per year and the median property-tax bill is $3,190 per year.2425
Watch-outs
- A small accessory building may be permit-exempt, but Alpine County still requires applicable setbacks and other code standards.1
- Private-site RV occupancy is not open-ended; the county limit is 16 days per calendar year unless the Planning Commission approves an occupancy permit extension.7
- Environmental Health must approve a required new or replacement septic system before Building Safety can issue the building permit.6
- A driveway connection involving a county road right-of-way requires an Alpine County encroachment permit.19
Sources
- Building Safety Division | Alpine County, CA, quoted and re-checked
- General Plan Housing Element Update Draft, quoted and re-checked
- Alpine County Building Safety Division (alpinecountyca.gov)
- Liquid Waste, quoted and re-checked
- General Plan Housing Element Update Draft, quoted and re-checked
- Local Area Management Program (LAMP), quoted and re-checked
- Planning Commission Camping on Private Property Discussion, quoted and re-checked
- Building Safety Division | Alpine County, CA, quoted and re-checked
- Well Permits, quoted and re-checked
- Building Permit Information Guide, March 2022, quoted and re-checked
- Building Permit Information Guide, March 2022, quoted and re-checked
- Chapter 18.16 AG Agriculture Zone, quoted and re-checked
- Alpine County Planning Division (alpinecountyca.gov)
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Local Area Management Program (LAMP), quoted and re-checked
- Local Area Management Program (LAMP), quoted and re-checked
- Alpine County Housing Element, quoted and re-checked
- Alpine County 6th Cycle Housing Element, quoted and re-checked
- Building Permit Information Guide, March 2022, quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Alpine County Health Department, Environmental Health (alpinecountyca.gov)
- Alpine County Engineering Department (alpinecountyca.gov)
- Alpine County Building Permit Information Guide, quoted and re-checked
- Typical home insurance premium: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.