Unincorporated Mohave County, Arizona requires building permits for construction unless a specific exemption applies1. County zoning controls allowable uses, setbacks and building height2,3. Mohave County Development Services handles conventional and some alternative septic systems under ADEQ delegation, with construction authorization and inspection required before discharge4,5.
Do you need a building permit in Mohave County, Arizona?
Unincorporated Mohave County requires a building permit for construction unless a specific code or ordinance exemption applies.
Unincorporated Mohave County requires a building permit for construction unless a specific code or ordinance exemption applies1. Mohave County uses the 2018 International building-code family and 2017 National Electrical Code, with local amendments10. A detached, one-story storage shed or similar accessory structure is exempt only up to 300 square feet and without utilities; fences and block walls may be exempt up to 7 feet measured from the lowest adjacent property grade6. Shipping containers are exempt only for residential storage without utilities, and all other rules and ordinances still apply6. Every manufactured-home installation separately requires a building permit7. Mohave County allows owner-builders without a licensed contractor, subject to Registrar of Contractors limits; the state exemption requires owner occupancy rather than a project intended for sale, rent, employees or business visitors8,12. Inside Lake Havasu City, Bullhead City and Kingman, city offices handle building permits13,14,15. Mohave County Development Services retains delegated septic permitting for conventional and some alternative systems; Bullhead City also controls construction/install permits, with ADEQ or applicable county approval required for private systems serving multifamily, commercial or industrial property4,16.
Who handles building, zoning and septic permits in Mohave County, and how do you reach them?
The Mohave County Building Division issues building permits and inspections; call 928-757-0903 or visit the county offices at 700 W. Beale Street, Kingman, AZ 86401.
The Mohave County Building Division issues building permits and inspections; call 928-757-0903 or visit the county offices at 700 W. Beale Street, Kingman, AZ 8640117. The Planning & Zoning Division handles zoning classification, zoning permits and code enforcement; email codeenforcement@mohave.gov or call 928-757-090318. County Development Services processes permits for conventional and some alternative septic systems under authority delegated by ADEQ; email eqpermits@mohave.gov or call 928-757-09034. For a Floodplain Use Permit, contact the Flood Control District at 928-757-0925, based at 3250 E. Kino Ave., Kingman, AZ 8640919.
Does Mohave County have zoning?
Mohave County zoning governs unincorporated land under the Board of Supervisors’ jurisdiction; ask Planning & Zoning for the parcel’s mapped district, allowable uses and setbacks.
Mohave County zoning governs unincorporated land under the Board of Supervisors’ jurisdiction; ask Planning & Zoning for the parcel’s mapped district, allowable uses and setbacks2,7. Lake Havasu City, Bullhead City and the Town of Colorado City set their own zoning20,21,22. County Development Services retains delegated septic permitting for conventional and some alternative systems4. Minimum lot sizes include 5 acres in A and 6,000 square feet in R-1; specific ordinance provisions take precedence3. Single-family residential lot coverage, including accessory buildings and storage, cannot exceed 60% except as Section 35 provides; open swimming pools are excluded3.
Unincorporated Mohave County allows an attached and a detached accessory residence where single-family dwellings are permitted, plus another detached residence on lots of at least 1 acre23. Allowed accessory residences have no size limit on residential lots of at least 5 gross acres; smaller lots require an administrative Accessory Residence Permit up to 75% of the primary home’s size, or a Special Use Permit above that, subject to section requirements23. A second septic/leach system and water supply require at least 26,500 square feet of lot area, potentially more at Environmental Quality or ADEQ’s direction23.
How do septic permits and wells work in Mohave County?
A septic project in Mohave County starts with a Notice of Intent to Discharge; construction cannot begin until the county issues a Construction Authorization, and discharge cannot begin until it issues a separate Discharge Authorization.
A septic project in Mohave County starts with a Notice of Intent to Discharge; construction cannot begin until the county issues a Construction Authorization, and discharge cannot begin until it issues a separate Discharge Authorization5. Construction and the request for discharge authorization must be completed within 2 years, and the request must document a passed tank watertightness test; the county then inspects the installation before authorizing discharge5. County Development Services processes conventional and some alternative systems under authority delegated by ADEQ4. Composting toilets and vault-and-haul systems are listed alternatives, but limiting site conditions can trigger county processing, site investigation, authorization and inspection rather than creating an exemption from sanitation review4. Before the site investigation, the sewer provider must complete the Sewer Availability Information Sheet5. For a well, file an ADWR Notice of Intent before drilling, deepening or modifying it; domestic wells on 5 acres or less also need local environmental-health review first11. Only 18.7% of Mohave County soils are rated “not very limited” for a conventional drain field; a site evaluation may identify the need for an engineered system, rather than rule out septic24.
Can you live in an RV or tiny home on your land in Mohave County?
An RV is not an unrestricted full-time residence on ordinary residential land: occupancy is capped at 30 cumulative days a year and 14 consecutive days unless a special permit and approved wastewater system apply.
An RV is not an unrestricted full-time residence on ordinary residential land: occupancy is capped at 30 cumulative days a year and 14 consecutive days unless a special permit and approved wastewater system apply9. Permanent RV residence is limited to an R-RV zone, an RV park or an approved part of a manufactured-home park9. A temporary RV residence may be permitted while a permanent home is under construction, and separate renewable permits are available in A-R or R-E zones9. Do not assume every tiny home is a park model: Mohave County defines an Appendix Q tiny house as a dwelling of 600 square feet or less excluding lofts, with minimum room dimensions and ceiling heights, but we could not confirm the parcel-level zoning permission for a site-built tiny house; ask Planning & Zoning10. A park model follows the county's park-model and RV placement rules, including required septic facilities where applicable7.
What are the steps to build a home in Mohave County?
Confirm the parcel's zoning classification with the Planning & Zoning Division because it controls allowed uses, lot size and setbacks.
- Confirm the parcel's zoning classification with the Planning & Zoning Division because it controls allowed uses, lot size and setbacks2.
- Apply through the Building Division's online permitting system; fees vary by project, square footage and sometimes value, and every permit carries a $40 automation fee8,25.
- Start work within 180 days of issuance and avoid a suspension or abandonment lasting 180 days25.
- Have the sewer provider complete the availability form before a septic site investigation, then obtain construction and discharge authorizations as applicable5.
- File a Notice of Intent to Drill with ADWR before well work begins11.
- Obtain any required county right-of-way and Floodplain Use permits before disturbing the affected land19,26.
- Schedule building and septic inspections at the applicable phases5,27. A manufactured home needs an approved final inspection and Certificate of Occupancy before occupancy, and a structure brought through the Building Amnesty Permit process also needs a Certificate of Occupancy before use1,28. Ask the Building Division about final approval for other projects because we could not confirm a general countywide rule17.
What should you check before buying land in Mohave County, Arizona?
About 54.8% of Mohave County land is at a slope of 15% or less, and 71.8% is federal land; verify the parcel's ownership, legal access and usable building area.
About 54.8% of Mohave County land is at a slope of 15% or less, and 71.8% is federal land; verify the parcel's ownership, legal access and usable building area24. In unincorporated Mohave County, work within county-maintained rights-of-way requires a Right-of-Way permit, and changes to land in special flood hazard areas require a Floodplain Use Permit before work begins19,26. Severe drought occurs in about 29.1% of years, making well feasibility and water storage practical due-diligence items24. A minor land division creating 5 or fewer interests, at least one under 36 acres, without a zoning change requires a Public Works application; the County Surveyor has 30 calendar days for a written determination29. Mohave County's effective property-tax rate is 0.5%, and the median annual bill is $1,22924.
Watch-outs
- In unincorporated Mohave County, incidental RV occupancy requires an RV-allowing district, is limited to 30 days a year and 14 consecutive days, and requires an approved wastewater connection or regular trips to an approved dump station; longer stays require a special permit and approved wastewater disposal9.
- A manufactured home needs its own installation permit and is barred in R-O and R-O/A zones7.
- Mohave County's agricultural exemption requires at least 5 contiguous commercial acres, Assessor agricultural classification and a Development Services exemption certificate, with annual review; nonagricultural uses remain regulated7.
Sources
29 official pages, each quoted and re-checked · written October 12, 2026
- Building Ordinance 2021-03
- Planning & Zoning Division | Mohave County
- Section 35 Setbacks and Area Requirements
- Septic & Well Permitting
- Notice of Intent to Discharge On-Site Wastewater Treatment Facility
- Work Exempt from a Building Permit
- Planning & Zoning Division | Mohave County
- mohave.gov
- Section 37.K — Establishment of Recreational Vehicles and Park Model Units
- MOHAVE COUNTY ORDINANCE 2021-03 (Rev 02-02-2026)
- Well Drilling in Arizona
- A.R.S. § 32-1121; Persons not required to be licensed
- Lake Havasu City: Building Permits | Lake Havasu City (Mohave County)
- Bullhead City: Bullhead City Code § 15.04.030—Building permit required; fees (Mohave County)
- Kingman: Article II Building Code (Mohave County)
- Bullhead City: Bullhead City Code § 13.08.020—Private sewage systems (Mohave County)
- Mohave County Building Division (mohave.gov)
- Mohave County Planning & Zoning Division (mohave.gov)
- Mohave County Flood Control District (Floodplain Administration) (mohave.gov)
- Lake Havasu City: Lake Havasu City Development Code, § 14.01.05 (Mohave County)
- Bullhead City: Bullhead City Code § 17.06.270, Temporary buildings, structures and uses (Mohave County)
- Town of Colorado City: Chapter 152: Zoning Code (Mohave County)
- Mohave County Zoning Ordinance
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Permitting
- Mohave County Public Works Pre-Acknowledgment Right-of-Way Work Form
- Single Family Dwelling Inspection Checklist
- MH Inspection Requirements
- Minor Land Division Regulations - Parcel Plats
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Mohave County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.