Bolthole Index

Wetzel County, West Virginia

Zoning, building permits and septic rules in New Martinsville, West Virginia

New Martinsville, West Virginia has no zoning ordinance, so the city sets no land-use districts1. The city's Building Department still requires building permits for structural, electrical, plumbing and mechanical work inside city limits2. Septic permits for Wetzel County come from the Wetzel-Tyler Health Department, not the city3.

At a glance

Zoning
None. The city code states New Martinsville has no zoning ordinance1
Building permit
Required from the city for structural, electrical, plumbing and mechanical work; small jobs up to $500 need a permit but no fee24
Setbacks
City guidance lists 25 feet frontal and 5 feet side for new structures5
Septic
Wetzel-Tyler Health Department issues sewage-system permits for Wetzel County36
Septic permit fee
$252 for a conventional single-family system, including a $30 state DEP fee7
Water well
State permit required; the health department's fee for a new or repaired well is $15089
Subdivision
Regulated by the city code's subdivision chapter10

Who to call

Building permits

City of New Martinsville Building Department

City building permits, including permit applications for standard and floodplain projects, turned in at City Hall

304-455-9130

191 Main Street, New Martinsville, WV 26155

Septic permits

Wetzel-Tyler Health Department

On-site sewage (septic) permits and water-well permits for Wetzel and Tyler Counties

(304) 337-2001

10 Howard Jeffers Drive, New Martinsville, WV 26155

Floodplain permits

Wetzel County OEM/E-911 (911 Addressing & Floodplain)

Floodplain Manager duties for Wetzel County: floodplain development permits and elevation-data site plans

304-455-6960

[email protected]

PO Box 156, New Martinsville, WV 26155

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in New Martinsville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does New Martinsville, WV have zoning?

No. The City of New Martinsville's code states that the city currently has no zoning ordinance, and its zoning chapter is reserved for any future legislation1. Because no zoning districts exist, New Martinsville publishes no district schedule of permitted uses or minimum lot sizes11. The code is clear that other municipal, state, building, subdivision, floodplain, utility, health and nuisance rules may still apply1.

The Building Department does publish setback guidance for new structures: 25 feet frontal, 5 feet on the side, and 10 feet between permanent structures at the roof line5. Fences and retaining walls should stay off the property line but may go up to it5. We could not confirm rules inside New Martinsville for RVs or tiny homes as housing; ask the Building Department before you buy or park one.

Do you need a building permit in New Martinsville, and who issues it?

Yes, for most real construction work. The City of New Martinsville Building Department requires a permit for all electrical, plumbing and mechanical (structural) work inside city limits2. Maintenance such as painting, replacing a deck board or repairing a roof leak, and interior jobs under $2,000 with no electrical, plumbing or structural work, may not need a permit; slab-concrete driveways and sidewalks are listed as no permit necessary2.

Permit applications come in a standard version and a floodplain version. Forms can be printed, filled in and turned in at City Hall1213. The Building Department is at 191 Main Street, phone 304-455-913013.

How much does a building permit cost in New Martinsville?

The city publishes a short fee schedule. A permit for county or state work, or for jobs up to $500, carries no fee4. Residential projects from $501 to $1,000 cost $25.00 plus $3.00 per $1,000 or fraction thereof, and commercial projects in that range cost $50.00 plus $4.00 per $1,000 or fraction thereof4. A demolition permit costs $10.004. We could not confirm the fee for projects above $1,000, so ask the Building Department for a quote on a full house13.

How do septic permits work in New Martinsville?

Septic permits are a health-department matter, not a city one. The Wetzel-Tyler Health Department serves Wetzel and Tyler Counties and issues sewage-system permits3. New septic systems and changes to existing ones must be permitted before installation6. The published fee is $222.00 for a conventional single-family dwelling plus a $30.00 DEP fee, $252.00 in total7.

The city code index lists municipal provisions on septic tanks, private sewage disposal and public sewers, but we could not confirm whether a lot inside city limits must connect to city sewer or may use a septic system. Ask the Building Department and the health department at (304) 337-2001 before you plan either14. Wetzel County's soils are a caution: only about 0.2% rate as not limited for a conventional drain field15.

Building a home in New Martinsville: the steps, in order

  1. Call the Building Department at 304-455-9130 to confirm what your project needs, since the city has no zoning but does regulate building work113.
  2. Check the setbacks: 25 feet frontal, 5 feet side5.
  3. If the lot is platted or being divided, review the city's subdivision regulations10.
  4. Ask whether the lot is in a flood zone; the city offers a separate floodplain permit application12.
  5. Get the septic permit from the Wetzel-Tyler Health Department before installing a system6.
  6. Turn in the building permit application at City Hall and pay the fee12.

What stays with Wetzel County and the state (and what to check before you buy)

For land outside city limits, see the Wetzel County page. Wetzel County has no countywide building permit; its permit requirement is limited to floodplain development, which needs a permit from the Floodplain Manager16. Whether that county floodplain permit applies inside city limits we could not confirm; ask the Wetzel County OEM/E-911 office at 304-455-696017.

A new driveway onto a West Virginia state highway needs a free permit from the Division of Highways18. Drilling a private water well requires a state-required permit, issued locally through the health department89. Wetzel County is about 92.9% wooded and only 9.6% of its land is at 15% slope or less, so buildable flat ground is scarce1920. The county's effective property tax rate is 0.6%21.

Watch-outs

  • We could not confirm a certificate-of-occupancy or building-inspection requirement inside New Martinsville city limits; ask the Building Department what inspections apply to your project12.
  • We could not confirm which building code the city enforces or whether owner-builders have an exemption inside city limits; ask the Building Department before you hire or start work yourself13.
  • State law guarantees at least one accessory dwelling unit by right on a lot with a single-family dwelling inside a West Virginia municipality, subject to the municipality's fire, building and other requirements22.

Sources

  1. Chapter Three — Zoning Regulations (New Martinsville), quoted and re-checked
  2. Building Department (New Martinsville), quoted and re-checked
  3. Wetzel Tyler Board of Health Fees for Permits & Services, quoted and re-checked
  4. Building Department (New Martinsville), quoted and re-checked
  5. newmartinsville.com (New Martinsville), quoted and re-checked
  6. Inspection of a Standard Septic Tank System Installation, quoted and re-checked
  7. Permit & Service Fees, quoted and re-checked
  8. Water Wells (West Virginia statewide rule), quoted and re-checked
  9. Wetzel Tyler Board of Health Fees for Permits & Services, quoted and re-checked
  10. Chapter One — Subdivision Regulations (New Martinsville), quoted and re-checked
  11. Chapter Three — Zoning Regulations (New Martinsville), quoted and re-checked
  12. Building Department (New Martinsville), quoted and re-checked
  13. City of New Martinsville Building Department (newmartinsville.com)
  14. Wetzel-Tyler Health Department (wetzeltylerhealthdepartment.com)
  15. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  16. Ordinances | Wetzel County, WV, quoted and re-checked
  17. Wetzel County OEM/E-911 (911 Addressing & Floodplain) (wetzelcountywv.gov)
  18. Encroachment Permits (West Virginia statewide rule), quoted and re-checked
  19. Wooded share of land: Bolthole Index county data
  20. Share of land at 15% slope or less: Bolthole Index county data
  21. Effective property tax rate: Bolthole Index county data
  22. West Virginia Code §8-42-1. Definitions (West Virginia statewide rule), quoted and re-checked

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for New Martinsville

New Martinsville’s own rules

  • Building permitRequired

    Building work inside New Martinsville city limits, including electrical, plumbing, mechanical, and structural work.

    • Maintenance work such as painting, replacing a board on a deck, and repairing a roof leak may not require a permit.
    • Interior jobs under $2,000 with no electrical, plumbing, or structural work may not require a permit.
    • Driveways and sidewalks made of slab concrete are listed under no permit necessary.
    • All electrical, plumbing, and mechanical structural work requires a permit.
    • The page also states that county, state, or jobs up to $500 require a permit with no fee.
    “All Electrical, Plumbing & Mechanical (structural).”
  • Local zoningAbsent (with conditions)

    Land inside New Martinsville city limits.

    • The code states that the City currently has no zoning ordinance; other municipal, state, building, subdivision, floodplain, utility, health, or nuisance rules may still apply.
    “EDITOR’S NOTE: The City currently has no Zoning Ordinance. This Chapter Three is reserved for any future legislation.”
  • Zoning districtsNot published (with conditions)

    Zoning districts inside New Martinsville city limits.

    • The code expressly states that the City currently has no zoning ordinance, so no municipal zoning-district schedule is published in the accessible code.
    “EDITOR’S NOTE: The City currently has no Zoning Ordinance. This Chapter Three is reserved for any future legislation.”
  • SetbacksSpecified

    New structures inside New Martinsville city limits.

    • The page separately states that retaining walls or fences should stay off the property line but may go up to the property line.

    side setback: 5 feet · distance between permanent/existing structures at roof line: 10 feet · frontal setback: 25 feet

    “5 feet from property line - side setback”
  • Subdividing landRegulated (with conditions)

    Subdivision activity inside New Martinsville city limits.

    • The codified planning and zoning part contains a Chapter One titled Subdivision Regulations with articles addressing general procedure, improvements, utility/fire/street requirements, design standards/minimum layout requirements, and modifications and exceptions.
    “CHAPTER ONE - Subdivision Regulations Art. 1301. General Procedure. Art. 1305. Improvements. Art. 1309. General Utility, Fire Prevention and Street Requirements. Art. 1313. Design Standards; Minimum Layout Requirements. Art. 1317. Modifications and Exceptions.”
  • Permit feesPublished (with conditions)

    City building permits inside New Martinsville city limits.

    • County, state, or jobs up to $500 have no fee.
    • Residential projects from $501 to $1,000 are charged $25.00 plus $3.00 per $1,000 or fraction thereof.
    • Commercial projects from $501 to $1,000 are charged $50.00 plus $4.00 per $1,000 or fraction thereof.
    • Demolition costs $10.00.

    residential permit fee base: 25 USD (projects $501-$1000) · residential incremental fee: per 3 USD per $1000 or fraction thereof (projects $501-$1000) · commercial permit fee base: 50 USD (projects $501-$1000) · commercial incremental fee: per 4 USD per $1000 or fraction thereof (projects $501-$1000) · demolition fee: 10 USD

    “Permit but NO FEE for County, State or jobs up to $500 Residential Projects ($501-$1000): $25.00 + $3.00 per $1000 or fraction thereof Commercial Projects ($501-$1000): $50.00 + $4.00 per $1000 or fraction thereof Demolition: $10.00”
  • Permit processPartial

    City building-permit applications inside New Martinsville city limits.

    • The city provides building permit applications for standard and floodplain projects.
    • Completed forms are turned in at City Hall.
    “Forms may be printed out, filled in and turned in at City Hall”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask New Martinsville or Wetzel County directly.

  • Owner-builder exemption — Owner-builders performing construction inside New Martinsville city limits.
  • Building code adopted — Building-code adoption inside New Martinsville city limits.
  • Inspections — Building inspections inside New Martinsville city limits.
  • Certificate of occupancy — Certificates of occupancy for buildings inside New Martinsville city limits.
  • Who permits septic — Septic regulation and administration inside New Martinsville city limits.
9 more unanswered
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that New Martinsville publishes no rule on the point, not that none exists. Wetzel County’s page lists the county offices to call.

← All of Wetzel County: county rules, score and offices