Zoning, building permits and septic rules in Town of Milton, West Virginia

Town of Milton is a town in Cabell County, West Virginia. 13 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Cabell County page.

Answers from the rulebook for Town of Milton

Town of Milton’s own rules

  • Building permitRequired

    Proposed construction inside Milton town limits.

    • Application materials include plans, site plans, floodway/floodplain determination, and other items specified on the City's form.
    • Construction must begin within six months after permit issuance unless the code official grants a written extension.
    “Any person who starts work on any project or job without first obtaining a building permit shall be subject to a fine”
  • Building code adoptedAdopted (with conditions)

    Construction regulated by Milton's Building Department inside Milton town limits.

    • The City's posted list identifies the code cycle as starting August 1, 2022 and ending August 1, 2027.
    • The listed International Building Code and International Residential Code are amended.
    “Current WV State Adopted Code Starting Aug 1,2022-Aug 1,2027 2018 International Building Code Amended”
  • InspectionsRequired

    Work under the City's construction permit process inside Milton town limits.

    • Work must follow the submitted plans and adopted State, ICC, City, floodplain, and stormwater requirements.
    • Changes not listed on the permit must be reported and approved in advance by the building official.
    “All work will be done in accordance with the plans submitted to the City of Milton. All work must follow the adopted WV State, ICC Codes, City of Milton Ordinance, Floodplain and Stormwater Ordinances. All required inspections must be made. Any changes made other than those listed on this permit must be reported and approved by building official in advance.”
  • Minimum lot sizeSpecified

    Lots on which a mobile home is located inside Milton town limits.

    • This standard is specific to mobile-home lots and does not establish a general residential-district minimum lot size.

    minimum lot area: >= 4500 square feet (Applies to a lot on which a mobile home is located.)

    “Any lot on which a mobile home is located shall be not less than 4,500 square feet in area.”
  • SetbacksSpecified

    Mobile homes inside Milton town limits.

    • Front setback can be greater than 25 feet when needed to comply with the parking-space requirement.
    • This standard is specific to mobile homes.

    front setback: >= 25 feet (May be greater if needed to conform to § 1721.02(H).) · side setback: >= 10 feet (Applies to mobile home and/or attachments.) · rear setback: >= 10 feet (Applies to mobile home and/or attachments.)

    “No mobile home and/or attachments shall sit closer than ten feet to the side or rear property lines of the lot on which it is located.”
  • Manufactured homesLimited

    Mobile/manufactured homes inside Milton town limits.

    • Only double-wide mobile homes are allowed; single-wide mobile homes are prohibited.
    • The unit must be a single-family dwelling on a separately owned lot with no other dwelling.
    • The home must be no more than 15 years old, except existing units are grandfathered; replacement units must meet the rules.
    • Additional flood-hazard-area installation rules apply.

    maximum mobile-home age: <= 15 years (Existing homes are grandfathered; replacement must comply.)

    “Double-wide mobile homes only. Single wide-mobile homes are not permitted within the city limits. [...] Any mobile home shall be no more than 15 years old, with the exception of the ones currently existing which will be grandfathered in, but when one is moved out and replaced, all mobile home rules apply.”
  • Off-grid sanitationLimited

    Mobile homes inside Milton town limits.

    • A mobile-home lot must have an approved tap to the municipality's main public sewer before placement.
    • The rule does not establish requirements for other housing types.
    “No mobile home shall be placed on any lot prior to the installation of an approved sewer tap serving such lot.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Mobile homes located inside Milton town limits.

    • The mobile home must have separate permanently installed water, electricity, and sanitary-sewage services.
    • An approved municipal main-sewer tap and sewer-tap permit are required; the tap remains open until inspected and approved by the Sanitary Board.
    “Each lot for a mobile home shall have an approved tap to the main public sewer of the municipality.”
  • Subdividing landLimited

    Subdivision of land in mapped floodplain areas inside Milton town limits.

    • A subdivided lot must include a buildable portion outside the identified flood hazard area.
    • Subdivision streets must have surfaces at least one foot below the floodplain-limit line elevation.
    • New structures must be located on the portion outside the identified flood hazard area.
    “Subdivision of land in the floodplain area must result in lots that include a buildable portion outside of the identified flood hazard area and be served by streets within the proposed subdivision having surfaces not lower than one foot below the elevation of the line defining the floodplain limits.”
  • Driveway accessRequired

    Mobile homes inside Milton town limits.

    • This rule is specific to mobile homes.
    “Each mobile home shall have direct ingress and egress to and from a street or streets within the municipality.”
  • Building in a floodplainRequired

    New construction or substantial improvements inside Milton town limits, including work subject to the municipal floodplain ordinance.

    • The process determines floodplain, floodway, or other flood-hazard location and requires County Health Department approval for water and sewer.
    • In mapped floodplain areas, site plans are required for development, new construction, substantial improvements, proposed subdivisions, and manufactured-home parks.
    “Site plans are required for all development, new construction, and substantial improvements determined to be located in a mapped floodplain area and all proposed subdivisions and manufactured home parks.”
  • Permit feesPublished (with conditions)

    Building-permit applications inside Milton town limits.

    • Fee is based on estimated construction cost.
    • Starting work without first obtaining a permit is subject to a $100 to $500 fine at the Code Official's discretion; each continuing day after due notice is a separate offense.

    first construction-cost tier: 20 USD (First $1,000 of construction costs.) · additional fee after initial $1,000: per 2 USD per $1,000 (As stated in the published schedule.)

    “First $1000.00 of construction costs $20.00 Every $1000.00 after the initial $1000.00 Plus $2.00 per $1000.00”
  • Permit processPublished (with conditions)

    New construction permit applications inside Milton town limits.

    • For site development of one acre or more, detailed stormwater-management plans are required.
    • Commercial plans over $50,000 require the signature and seal of a West Virginia registered architect or engineer.
    • All contractors and subcontractors must be licensed through West Virginia and the City.

    stormwater plan threshold: >= 1 acre (Development of site property.) · commercial plan professional-seal threshold: > 50000 USD (Commercial plans.)

    “Commercial plans over $50,000 must have the signature and seal of a WV registered architect or engineer.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Milton or Cabell County directly.

  • Owner-builder exemption — Owner-performed residential construction inside Milton town limits.
  • Certificate of occupancy — Occupancy of buildings inside Milton town limits.
  • Local zoning — Land inside Milton town limits.
  • Zoning districts — Land inside Milton town limits.
  • Minimum dwelling size — Dwellings inside Milton town limits.
11 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Milton publishes no rule on the point, not that none exists. Cabell County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Milton means bringing your own water and power. The kit we’d start with: