Pepin County, Wisconsin
Village of Pepin is a village in Pepin County, Wisconsin. Village of Pepin adopts its own zoning, so inside its limits Village of Pepin’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Pepin County page.
Residential alterations/additions over $1,000 in 12 months and new buildings inside Pepin village; also a separate LUCR zoning permit
alteration/addition threshold: > 1000 USD per 12 months (exempt items listed)
“if a person alters a building in excess of $1,000 value in any 12-month period, adds onto a building in excess of $1,000 in any 12-month period, or builds or installs a new building, within the scope of this chapter, they shall first obtain a building permit for such work from the building inspector.”
One- and two-family dwellings built since June 1, 1980 and all commercial buildings inside Pepin village
“the wisconsin uniform dwelling code, wis. admin. code ch. sps 320 to 325, and ch. 327, and all amendments thereto, is adopted and incorporated by reference and shall apply to all buildings within the scope of this chapter.”
Buildings within scope of Chapter 153 inside Pepin village
“an occupancy permit will be issued only after all inspections have been satisfactorily completed”
Single-family, multiple-family and commercial structures inside Pepin village
“no single-family dwelling or multiple family dwelling or commercial structure may be occupied by any person or party until an occupancy permit has been issued.”
All land and water within the corporate limits of Pepin village
“five zoning areas are provided as follows: (a) residential area (r) (b) commercial area (c) (c) light industrial area (li) (d) agricultural area (a) (e) low impact commercial (lic)”
Residential area (R) district, inside Pepin village
minimum lot size (unsurveyed property): >= 6050 square feet · minimum lot width: >= 55 feet
“(5) minimum lot size on all properties not yet surveyed into lots/building sites shall have a minimum square footage of 6,050 feet per lot. (6) minimum lot width (measured at rear of front yard): 55 feet.”
“(5) minimum lot area per family (residential): as required by the state administrative rule for operation of septic fields.”
Residential area (R) district, inside Pepin village
side yard, principal: >= 6 feet · side yard, accessory: >= 3 feet · front yard: average of buildings on either side or 20 feet, whichever is less · rear yard, principal: >= 20 feet
“(2) minimum side yard: (a) principal building: six feet; and (b) accessory building: three feet on each side. (3) minimum front yard setback: average of building on either side or 20 feet, whichever is less. (4) minimum rear yard setback: (a) principal building: 20 feet; and (b) accessory building: six feet.”
“(2) minimum side yard: (a) principal buildings: 20 feet on each side. (b) accessory buildings: 5 feet on each side. (3) minimum front yard setback: 30 feet. (4) minimum rear yard setback: 50 feet.”
Residential area (R) district, inside Pepin village
maximum lot coverage, all structures: <= 50 percent
“(7) maximum lot coverage (for all structures): 50%.”
Agricultural area (A) district, inside Pepin village
maximum height, residential structures: <= 35 feet (other structures: none)
“(1) maximum building height: (a) residential structures: 35 feet. (b) other structures: none”
“(c) minimum standards. (1) maximum building height: 35 feet.”
LUCR (land use construction or remodeling) permit fees inside Pepin village
LUCR fee, project up to $1,000: 25 USD · LUCR fee, $1,001-$5,000: 50 USD · LUCR fee, $5,001-$10,000: 100 USD · LUCR fee, $10,001-$100,000: 300 USD · LUCR fee, over $100,001: 500 USD
“(a) projects with costs of up to $1,000: $25; (b) projects from $1,001 - $5,000: $50; (c) projects from $5,001 - $10,000: $100; (d) projects from $10,001 - $100,000: $300; and (e) projects over $100,001: $500.”
LUCR zoning permit process inside Pepin village
decision deadline: <= 30 days
“a lucr permit shall be granted or denied in writing by the zoning administrator within 30 days. the permit shall expire within three months for demolition and 12 months for construction.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Pepin or Pepin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Pepin publishes no rule on the point, not that none exists. Pepin County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Pepin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.