Menominee County, Wisconsin requires a building permit before covered construction begins on fee land12. County zoning also applies to fee land, but land owned by the Menominee Indian Tribe of Wisconsin or held in federal trust for the Menominee Indian Nation is excluded3. On fee land, the county Zoning Department handles septic permits and maintenance oversight4.
At a glance
- Building permit
- Required before covered construction begins on fee land12
- Zoning
- County zoning covers fee land but excludes tribal-owned and federal trust land3
- Septic permits
- Required for new, altered, replacement and reconnected POWTS on fee land45
- Owner-builder
- An owner who occupies or will occupy the home may take out construction and erosion-control permits6
- RV habitation
- Allowed only where the zoning district permits it outright or conditionally7
- Tiny homes
- No distinct countywide tiny-home occupancy rule was confirmed; ask the Zoning Department before buying8
- Private wells
- Ordinary new private wells generally require advance Wisconsin DNR notification9
- R-1 setbacks
- Homes need 10-foot side yards and 25-foot rear yards; other districts differ10
Who to call
Building permits
Menominee County Building & Zoning Office
Building and zoning permit applications and zoning questions for land within county jurisdiction
3270 Courthouse Lane, Keshena, WI 54135-0279
Septic permits
Menominee County Zoning Department — Septic Systems (POWTS)
POWTS installation, permitting and maintenance on fee land
3270 Courthouse Lane, Keshena, WI 54135-0279
Contact details are copied from each office’s official page and were checked against it on September 29, 2026.
Do you need a building permit in Menominee County, Wisconsin?
Yes, for covered work on fee land. Town of Menominee Ordinance No. 63 requires the permit before construction begins and doubles the permit fee when work starts first2. Wisconsin's Uniform Dwelling Code governs new one- and two-family homes built since 1980, along with covered additions and alterations11. The local application requires two copies of the plans2. The permit question changes if the parcel is owned by the Menominee Indian Tribe of Wisconsin or held in federal trust for the Menominee Indian Nation, because the county zoning ordinance excludes those lands3. Confirm the parcel's legal status before treating the county process as controlling.
Who issues permits in Menominee County, and how do you reach the office?
The Menominee County Building & Zoning Office publishes building and zoning applications and directs zoning questions to the department12. The office is at 3270 Courthouse Lane, Keshena, WI 54135-0279, and its main number is 715-799-571012. The county page directs Uniform Dwelling Code inspection questions to the town building inspector, while Town of Menominee Ordinance No. 63 authorizes the Building Inspector to issue permits to an owner or authorized agent122. Permit fees vary by local ordinance, and a state permit-seal fee applies to each new dwelling13. Ask the office for the current application packet, fee total and inspection contact for the exact project.
Does Menominee County have zoning?
Menominee County has zoning for land within county jurisdiction, but the ordinance excludes land owned by the Menominee Indian Tribe of Wisconsin and land held in federal trust for the Menominee Indian Nation3. On covered land, the county publishes residential, business, industrial, forestry, agricultural and overlay districts, so permitted uses and dimensions depend on the parcel's district14. In the R-1 district, a residential structure needs a 10-foot side-yard setback and a 25-foot rear-yard setback; accessory structures generally need 5 feet at the side and rear10. Near navigable water, Wisconsin's shoreland standard generally requires a 75-foot setback from the ordinary high-water mark, subject to listed exceptions and setback averaging15. Ask the Zoning Department to identify the parcel's district and overlays before choosing a house site12.
How do septic permits work in Menominee County?
The Menominee County Zoning Department oversees private onsite wastewater treatment systems on fee land164. Permits are required for new systems, alterations, replacements and reconnections; the application also requires review and approval of a soil and site evaluation5. A newly constructed building cannot be occupied until its POWTS is approved, installed and inspected17. Only 8.8% of county soils are rated without severe limitations for a conventional drain field, so establish septic feasibility before committing to a building site18. Treatment tanks must be serviced within three years after installation and at least every three years afterward, or sooner at the ordinance's sludge-and-scum threshold17. Contact the septic program at 715-799-5710 x2 before design work begins16.
Can you live in an RV or tiny home in Menominee County?
An RV, travel trailer, bus or similar recreational shelter may be used for habitation only where the applicable zoning district allows the use outright or by conditional approval7. RV storage also requires a principal structure in use on the property, and storage is restricted in front yards, road rights-of-way and water setbacks7. In the Legend Lake Residential District, guest camping is allowed on improved property with a permitted principal structure when the owner is on site or easily accessible and campers can use the principal dwelling19. Menominee County materials do not establish a distinct countywide tiny-home occupancy rule, so ask the Zoning Department how the proposed unit would be classified8. Manufactured homes are permitted principal structures in the R-1 district, subject to its other requirements20.
What are the steps to build a home in Menominee County?
- Confirm whether the parcel is fee land under county jurisdiction or tribal-owned or federal trust land outside the county ordinance3.
- Ask the Building & Zoning Office for the parcel's zoning district, overlays and the correct application packet1214.
- Complete the soil and site evaluation and obtain required POWTS approval before relying on a homesite5.
- Submit the building-permit application and two plan copies before work starts2.
- Call for each construction-phase inspection before covering the work21.
- Obtain the occupancy permit after health-and-safety issues are cleared; the home cannot be occupied before it is issued22.
What should you check before buying land in Menominee County?
Start with title and land status because county building and zoning rules exclude tribal-owned and federal trust land3. Confirm zoning, setbacks, shoreland and floodplain constraints before drawing a site plan; Wisconsin limits development in floodways and imposes elevation requirements in floodfringe areas1423. Test septic feasibility early because only 8.8% of county soils lack severe conventional drain-field limitations18. For an ordinary new private well, obtain the required advance Wisconsin DNR notification; wells on Native American property are among the stated exceptions9. A driveway connecting to a state highway requires a WisDOT connection permit24. Finally, budget around an effective property-tax rate near 3.6% and a median annual bill near $3,5272526.
Watch-outs
- Menominee County's land-use rules do not govern land owned by the Menominee Indian Tribe of Wisconsin or held in federal trust for the Menominee Indian Nation; identify the parcel's status before applying3.
- Menominee County does not publish a distinct countywide minimum dwelling size or tiny-home occupancy rule in the materials reviewed for this guide; ask the Zoning Department how a proposed small dwelling will be classified8.
Sources
- Menominee County Building & Zoning Department (2026 county census)
- Menominee County Building & Zoning, quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- Menominee County Septic Systems (POWTS), quoted and re-checked
- Menominee County Septic Systems (POWTS), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code – Who May Do the Work, quoted and re-checked
- Section 33. Modifications, Exceptions & Special Requirements, quoted and re-checked
- Menominee County Building & Zoning (2026 county census)
- Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
- Section 4. Single Family Residential District (R-1), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- Menominee County Building & Zoning Office (co.menominee.wi.us)
- Wisconsin Administrative Code SPS 302.34 (Wisconsin statewide rule), quoted and re-checked
- Menominee County Building & Zoning, quoted and re-checked
- Wisconsin’s Shoreland Management Program (Wisconsin statewide rule), quoted and re-checked
- Menominee County Zoning Department — Septic Systems (POWTS) (co.menominee.wi.us)
- Menominee County Ordinance #40, Private On-site Wastewater Treatment Systems, quoted and re-checked
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Section 8.5 Legend Lake Residential District, quoted and re-checked
- Section 4. Single Family Residential District, quoted and re-checked
- Wisconsin’s Uniform Dwelling Code, quoted and re-checked
- Town of Menominee Ordinance No. 63 – Occupancy Permit Provision, quoted and re-checked
- Floodplain Development Basics (Wisconsin statewide rule), quoted and re-checked
- State highway connection permits (driveways & more) (Wisconsin statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.