Bolthole Index

Marquette County, Wisconsin

Zoning, building permits and septic rules in Village of Neshkoro, Wisconsin

Village of Neshkoro is a village in Marquette County, Wisconsin. Village of Neshkoro adopts its own zoning, so inside its limits Village of Neshkoro’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Marquette County page.

Answers from the rulebook for Village of Neshkoro

Village of Neshkoro’s own rules

  • Local zoningPresent

    Land inside Neshkoro village limits (Marquette County)

    • Zoning map adopted by reference and kept at the village clerk-treasurer's office
    “for the purpose of this chapter, the village of neshkoro is hereby divided into the following 13 zoning districts:”
  • Zoning districtsPublished

    Neshkoro village zoning districts (A-1, B-1, B-2, C-1, M-1, I-1, R-1, R-1-A, R-2, R-2-A, R-3, R-3-A, WT)

    • Boundaries shown on the Zoning Map, Village of Neshkoro, Wisconsin, adopted by reference
    “a-1 agricultural district b-1 downtown business district b-2 general business district c-1 conservancy district m-1 manufacturing district i-1 institutional district r-1 single-family residential district r-1-a single-family residential district r-2 one- and two-family residential district r-2-a one- and two-family residential district r-3 multiple-family residential district r-3-a multiple-family residential district wt wastewater treatment district”
  • Minimum dwelling sizeSpecified

    R-1 single-family residential district, Neshkoro village

    • R-1-A district requires 1,200 square feet minimum floor area

    minimum floor area: >= 900 sq ft

    “(2) building. (a) maximum height: 25 feet. (b) minimum floor area: 900 square feet.”
  • Minimum lot sizeSpecified

    R-1 single-family residential district, Neshkoro village

    • R-1-A district requires 1/2 acre and 100 feet width
    • Other districts not examined

    minimum lot area: >= 8712 sq ft · minimum lot width: >= 66 feet

    “d. height and area restrictions. (1) lot size. (a) minimum width: 66 feet. (b) minimum area: 8,712 square feet.”
  • SetbacksSpecified

    R-1 single-family residential district, Neshkoro village

    • Garages and accessory structures may be placed in required rear or side yards, but not closer than seven feet to the lot line without village board permission
    • R-1-A: street 30, rear 25, side 20 feet

    minimum street yard: >= 20 feet · minimum rear yard: >= 25 feet · minimum side yard: >= 10 feet

    “(3) yards. (a) minimum street yard: 20 feet. (b) minimum rear yard: 25 feet. (c) minimum side yard: 10 feet.”
  • Building heightSpecified

    R-1 single-family residential district, Neshkoro village

    • R-1-A also 25 feet

    maximum height: <= 25 feet

    “(2) building. (a) maximum height: 25 feet. (b) minimum floor area: 900 square feet.”
  • Manufactured homesLimited

    R-1 single-family residential district, Neshkoro village

    • Mobile homes excluded; qualifying manufactured homes permitted
    • Must meet foundation, siding, roof pitch (3 in 12), eaves and Wisconsin Uniform Dwelling Code requirements
    • Home age limit stated in the text (not captured)

    minimum double-wide width: >= 24 feet · minimum length: >= 36 feet

    “(2) manufactured homes complying with all of the following requirements and limitations: (a) the home shall be a double-wide of at least 24 feet in width and 36 feet in length and no older than four years of age.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Neshkoro or Marquette County directly.

  • Building permit — Neshkoro village
  • Owner-builder exemption — Neshkoro village
  • Building code adopted — Neshkoro village
  • Inspections — Neshkoro village
  • Certificate of occupancy — Neshkoro village
18 more unanswered
  • Lot coverage
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Neshkoro publishes no rule on the point, not that none exists. Marquette County’s page lists the county offices to call.

← All of Marquette County: county rules, score and offices