The Town of Fountain in Juneau County requires a town land-use permit, while a new one- or two-family home also needs a Wisconsin Uniform Dwelling Code building permit.12 Juneau County handles sanitary permits for private sewage systems and requires a separate land-use permit for development in mapped floodplain districts.34
At a glance
- Building permit
- Required for a new one- or two-family dwelling2
- Town land-use permit
- Required; applications go to the monthly Town Board meeting1
- Floodplain development
- A Juneau County land-use permit is required in mapped floodplain districts4
- Septic permit
- Juneau County administers sanitary permits for private systems56
- RV living
- Long-term occupancy on a private lot was not confirmed; ask the Town Clerk1
- Owner-builder
- A qualifying owner-occupant may apply, but permits still apply7
- Driveway
- A Town permit is required; state-highway access has a separate WisDOT permit89
Who to call
Building permits
Town of Fountain Building Inspector
Town building-code questions and dwelling inspections
916 Silver Lake Drive, PO Box 340, Portage, WI 53901
Zoning
Town land-use and driveway applications and parcel-specific land-use questions
W9921 Jacobsen Rd., Camp Douglas, WI 54618
Septic permits
Juneau County Sanitation & Zoning Department
Sanitary permits and plan review, shoreland building permits and floodplain questions
650 Prairie Street Mauston, WI 53948
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Town of Fountain means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Town of Fountain, Wisconsin?
Yes. A new one- or two-family dwelling in the Town of Fountain requires a Wisconsin Uniform Dwelling Code building permit, including a stick-built, modular or manufactured-home installation.2 Fountain also requires a town land-use permit, with applications reviewed at the Town Board's monthly meeting.1
New covered dwellings require inspections during footings, foundation and reinforcement, rough work, insulation and final completion; notify the inspector identified on the UDC permit when each stage is ready.10 A qualifying property owner who will occupy the completed home may apply as an owner-occupant, but that allowance does not remove the permit requirements.7 The available Town material does not establish one blanket building-permit rule for every alteration or accessory structure, so ask the Town Clerk and Building Inspector about the exact project before work begins.1112
Who handles building permits in the Town of Fountain?
Start with the Town of Fountain Clerk at 608-547-5335 or [email protected] for the Town land-use application and its Board-review schedule.11 The Town says land-use applications are reviewed at its monthly Board meeting.1 For UDC questions and required dwelling inspections, the Town lists General Engineering Company as its Building Inspector, reachable at 608-697-7807 or [email protected].12
A new-dwelling application must include an application, contractor-license information and legible building plans with scale or dimensions.13 Fountain publishes a $100 town land-use fee for new homes and garages, while the UDC enforcing agency's building and inspection charges may be separate.14 Ask both offices for the current forms, total charges and the order in which approvals should be submitted before scheduling construction.
Does the Town of Fountain have zoning and land-use rules?
The Town of Fountain requires land-use permits, but we could not confirm the complete current Land Use Ordinance, zoning map, zoning districts or dimensional schedule.1 Ask the Town Clerk to confirm the parcel's allowed use, minimum lot size, setbacks, building height, lot coverage and any rule for an accessory dwelling before treating the property as buildable.11
Juneau County's floodplain ordinance applies in mapped floodplain districts throughout the county, including the Town, and requires a county land-use permit before covered development, repairs, additions or changes of use begin.154 Juneau County's published floodplain districts include Floodway, Floodfringe, General Floodplain and Flooded Agriculture-Cranberry Farms districts.16 County shoreland rules also set district-specific lot standards; these county rules do not establish that every Fountain parcel lies in a regulated shoreland or floodplain area.1718
How do septic permits work inside the Town of Fountain?
Juneau County, rather than the Town building office, administers sanitary permits for private sewage systems in the Town of Fountain.5 Wisconsin requires the sanitary permit before any local permit is issued for a building that will use a private sewage system, and the local permit depends on approved plan review.19 Contact the Juneau County Sanitation & Zoning Department at 608-847-9391 or [email protected].20
Juneau County's delegated review covers qualifying at-grade and mound systems with design flows up to 1,000 gallons per day; individual site designs and other work outside those delegated categories go to Wisconsin DSPS for review.321 Only 0.5% of Juneau County soils rate without severe limitations for a conventional septic drain field, so make the soil evaluation and system design an early purchase contingency.22 A non-plumbing system is limited to a structure without indoor plumbing that is not used as a full-time residence.23
Can you live in an RV or tiny home in the Town of Fountain?
We could not confirm a complete Town of Fountain rule allowing long-term RV occupancy or temporary camping on an ordinary private lot. Ask the Town Clerk for a written, parcel-specific answer before buying land, placing an RV or relying on one during construction.11 Juneau County's camping provisions concern permitted campgrounds in mapped floodplain districts and do not establish a right to live in an RV on a private residential parcel.24
We also could not confirm a separate Town tiny-home category, minimum dwelling size or full dimensional schedule. A tiny home proposed as a new one- or two-family dwelling still falls within Wisconsin's UDC permit rule, and a manufactured-home installation is expressly included.2 Fountain's land-use permit process also remains relevant to placement.1 Off-grid sanitation is not a workaround for a full-time residence: the confirmed non-plumbing option is limited to a structure without indoor plumbing that is not used full time.23
Building a home in the Town of Fountain: what are the steps?
- Ask the Town Clerk to confirm the parcel's allowed use, applicable land-use standards and the current Town application.11
- Determine whether Juneau County shoreland or floodplain rules affect the site; covered floodplain work needs county approval before development begins.4
- If the home will use private sewage, complete plan review and obtain the sanitary permit before the Town issues a local permit.19
- Submit the Town land-use application in time for the monthly Town Board review and pay the applicable Town fee.114
- File the UDC dwelling application with the required contractor information and scaled or dimensioned plans through the enforcing agency identified by the Town.25
- Obtain the driveway approval that fits the road jurisdiction; Fountain issues its own driveway permit, while a state-highway connection requires WisDOT approval.89
- Call the inspector shown on the UDC permit at each required inspection stage.26
What should you check before buying land in the Town of Fountain?
Confirm the parcel's land-use classification and current dimensional rules with the Town Clerk because the complete Town ordinance and zoning schedule were not confirmed.11 Check shoreland and floodplain jurisdiction separately with Juneau County before assuming the Town approval is the only land-use review.20
Order the septic soil and site evaluation early: only 0.5% of Juneau County soils rate without severe limitations for a conventional drain field.22 Ask the Wisconsin Department of Natural Resources about the construction notification and requirements for a new private well because Fountain's local well-permit authority was not confirmed.27 Confirm legal road access too: the Town publishes a driveway-permit process and a $25 fee, or $100 with a fire-number sign, while a connection to a state highway follows WisDOT's separate permit process.8
Watch-outs
- A Town land-use permit does not replace the UDC building permit required for a new one- or two-family dwelling.12
- A Town building approval does not replace the Juneau County sanitary permit required for a covered private sewage system.56
- Long-term RV occupancy, temporary camping and a separate tiny-home classification were not confirmed; ask the Town Clerk before purchasing or placing a unit.11
- Development in a mapped Juneau County floodplain district requires county approval in addition to Town land-use and state dwelling permits.154
Sources
- Town of Fountain, Juneau County - Ordinances (Town of Fountain), quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings) (Town of Fountain), quoted and re-checked
- Delegated Agents for Private On-Site Wastewater Treatment System (POWTS) Plan Review, quoted and re-checked
- Juneau County Floodplain Zoning Ordinance, quoted and re-checked
- Juneau County Private Onsite Wastewater Treatment Systems Ordinance (Town of Fountain), quoted and re-checked
- Private Onsite Wastewater Treatment Systems (POWTS) (Town of Fountain), quoted and re-checked
- Instructions for Submitting a UDC Permit Application (Town of Fountain), quoted and re-checked
- Town of Fountain, Juneau County - Ordinances (Town of Fountain), quoted and re-checked
- Background on state highway connection permits (Town of Fountain), quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings) (Town of Fountain), quoted and re-checked
- Town of Fountain Clerk (townoffountain.org)
- Town of Fountain Building Inspector (townoffountain.org)
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings) (Town of Fountain), quoted and re-checked
- Town of Fountain Ordinances (Town of Fountain), quoted and re-checked
- Juneau County Floodplain Zoning Ordinance, quoted and re-checked
- Juneau County Floodplain Zoning Ordinance, quoted and re-checked
- Juneau County Code, Appendix A, Sec. 3.1 — Lots not served by public sanitary sewer, quoted and re-checked
- Juneau County Code, Appendix A, Sec. 3.2 — Lots served by public sanitary sewer, quoted and re-checked
- Requirement for Plan Review Prior to Issuing Local Permits, quoted and re-checked
- Juneau County Sanitation & Zoning Department (co.juneau.wi.gov)
- Juneau County POWTS Plan Review Delegation Letter, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Juneau County Private Onsite Wastewater Treatment Systems Ordinance (Town of Fountain), quoted and re-checked
- Juneau County Floodplain Zoning Ordinance, quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings), quoted and re-checked
- Well and heat exchange notification (Wisconsin statewide rule), quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.