The Town of Brooklyn in Green Lake County, Wisconsin requires a building permit from the town's Building Inspector before construction of a building starts1. Zoning follows the Green Lake County Zoning Ordinance, which the town adopted2. Septic permits come from the Green Lake County Land Use Planning & Zoning Department, not the town3.
At a glance
- Building permit
- Required from the Town's Building Inspector before construction1
- Zoning
- Green Lake County Zoning Ordinance, adopted by the town2
- Septic
- Green Lake County runs the private septic program where there is no public sewer3
- Minimum lot
- 100 feet average width and 20,000 square feet in general; district rules vary4
- Building height
- 35 feet general maximum5
- Mobile homes
- Allowed in the R-2 district on a permanent foundation, skirted6
- Owner-builder
- Wisconsin lets an owner-occupant take out the dwelling permits7
Who to call
Building permits
Town of Brooklyn Building Inspector
Building permits and inspections inside the Town of Brooklyn
W4691 County Road B, Markesan, WI 53946
Also useful
Town of Brooklyn Town Hall (Clerk)
Town forms, including driveway permits, and general questions
N5988 County Road A, Green Lake, WI 54941
Zoning
Green Lake County Land Use Planning & Zoning Department
County zoning administration, land use permits, shoreland and floodplain zoning, and septic (POWTS) permits
571 County Road A, Green Lake, WI 54941
Contact details are copied from each office’s official page and were checked against it on October 15, 2026.
Off-grid gear
Going off-grid in Town of Brooklyn means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does the Town of Brooklyn have zoning, and what does it mean for lot size and setbacks?
Yes. Green Lake County lists the Town of Brooklyn among the six towns that adopted the County Zoning Ordinance2. Parcel-specific districts come from the county zoning map, and the county ordinance names A-1, A-2, NRC, C-1, C-2, I, M-1, M-2, RC, R-1, R-2, R-3, R-4 and AO districts8.
In general, a building in the Town of Brooklyn must sit on a lot at least 100 feet in average width and 20,000 square feet in area, and a larger area applies where Wisconsin SPS 383 requires it4. The general height limit is 35 feet5. Look up your parcel's district before you rely on any of these numbers, because district rules differ and the county department is the office that confirms them9.
Do you need a building permit in the Town of Brooklyn, and who issues it?
Yes. No owner or contractor may start construction of a building or mechanical system before getting a permit from the Town's Building Inspector1. The town adopted the Wisconsin Uniform Dwelling Code chapters for one- and two-family dwellings and enforces them through its own Building Inspector10. Contact the Building Inspector through the town's contact page11.
Some work is exempt, such as re-roofing, re-siding, window replacement and minor repairs under $5,000 per year1. Applications for a new building or addition need two sets of plans and a scaled plot plan, and a permit is valid for two years12.
How do septic permits work in the Town of Brooklyn?
The town does not issue septic permits. Green Lake County administers the private onsite wastewater treatment (POWTS) program inside the Town of Brooklyn wherever public sewer is not available, under Chapter 334 of the county code and Wisconsin SPS 381-3873. The Land Use Planning & Zoning Department is the office to call9.
Once a septic system is running, state law requires inspection for pumping at least once every three years13. Only about 9.2% of Green Lake County's soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system14. We could not confirm the county's exact permit requirement for the town's addresses or any rules on private wells; ask the county department before you buy.
Can you live in a mobile home, RV or tiny home in the Town of Brooklyn?
Mobile and manufactured homes are allowed for a single family in the county's R-2 Single-Family Mobile Home Residence District, if the home is permanently mounted on a stone, concrete or masonry foundation, skirted, and served by compliant sanitary facilities6.
An accessory building on a lot may be used for human habitation in districts that allow it, limited to 20% of its footprint or 300 square feet, whichever is less, and only one such building per parcel15.
We could not confirm any town or county rule on tiny homes or on camping in an RV on private land in the town. Ask the Building Inspector and the county zoning department in writing before you plan to live in either one.
Building a home in the Town of Brooklyn: the steps, in order
- Find your parcel's zoning district and confirm lot size and height limits with the county zoning department9.
- Check for shoreland or floodplain: the county requires a land use permit for land-disturbing work in the jurisdiction of those ordinances16.
- Get a sanitary permit from the county if there is no public sewer3.
- Apply to the Town's Building Inspector for the building permit, with plans and a plot plan12.
- Request each inspection at least 48 hours ahead, unless the Wisconsin code sets another time frame17. Footing, foundation, rough work, insulation and final stages are among those listed.
- An owner who will live in the home may take out the dwelling permits personally7.
What stays with Green Lake County, and what to check before you buy
Zoning administration, floodplain zoning, and septic permits sit with Green Lake County even though the building permit is the town's23. For land outside the town, see the Green Lake County page.
A driveway or culvert off a county highway may need a permit from the Green Lake County Highway Department, and driveways off a town road go through the town18. In a subdivision or land division, the town will not issue a driveway or culvert permit until the land-division requirements are done, unless the Town Board allows it in a development agreement19.
Green Lake County's effective property tax rate is 1.3%20.
Watch-outs
- Land near water can fall under county shoreland rules, which apply within 1,000 feet of navigable lakes and 300 feet of navigable rivers and streams, so check before you buy21.
- The town's building permit rule lists no owner-builder exemption of its own, and we could not confirm short-term rental rules or a general lot-coverage limit, so ask the town clerk or Building Inspector1.
Sources
- Chapter 98 Building Construction (Town of Brooklyn), quoted and re-checked
- Land Use Planning & Zoning - Green Lake County (Town of Brooklyn), quoted and re-checked
- Land Use Planning & Zoning - Green Lake County (Town of Brooklyn), quoted and re-checked
- Article III: General Provisions - Green Lake County (Town of Brooklyn), quoted and re-checked
- Article III: General Provisions - Green Lake County (Town of Brooklyn), quoted and re-checked
- Land Use Planning & Zoning - Green Lake County (Town of Brooklyn), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- Land Use Planning & Zoning - Green Lake County (Town of Brooklyn), quoted and re-checked
- Green Lake County Land Use Planning & Zoning Department (greenlakecountywi.gov)
- Chapter 98 Building Construction (Town of Brooklyn), quoted and re-checked
- Town of Brooklyn Building Inspector (tn.brooklyn.wi.gov)
- Chapter 98 Building Construction (Town of Brooklyn), quoted and re-checked
- co.green-lake.wi.us (Town of Brooklyn), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Article IV: Zoning Districts - Green Lake County (Town of Brooklyn), quoted and re-checked
- Land Use Planning & Zoning - Green Lake County (Town of Brooklyn), quoted and re-checked
- Chapter 98 Building Construction (Town of Brooklyn), quoted and re-checked
- Permit Contacts and Construction Reminders, quoted and re-checked
- Article VII: Construction Requirements (Town of Brooklyn), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Land Use Planning & Zoning, quoted and re-checked
Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.