Pacific County, Washington requires building permits for new construction, remodels and additions, including many non-habitable structures1. Unincorporated land is zoned by the county, while Ilwaco, Long Beach, Raymond and South Bend handle their own zoning2. Septic permits come through Pacific County Environmental Health3.
At a glance
- Building permit
- Required for new construction, remodels, additions and specified non-habitable structures1
- Zoning
- Yes in unincorporated areas; incorporated cities administer their own rules2
- Septic permit
- Required through Pacific County Environmental Health for construction and major system work43
- RV living
- Temporary and conditional; longer occupancy triggers septic requirements5
- Tiny home
- Allowed under state rules if code-compliant, but placement still needs local approval6
- Minimum dwelling space
- 190 sq ft of habitable space under the state building code7
- Property tax
- About 0.8% effective rate; median bill around $2,250/year89
Who to call
Building permits
Pacific County Department of Community Development
Development permit applications, including land use, property division, building, septic and environmental health permits
Planning & zoning
Pacific County Community Development Planning Division
Land use, property division and development application guidance
Septic permits
Pacific County Environmental Health Division
On-site septic and water-system inspections and septic/well questions
Roads & driveways
Pacific County Department of Public Works
Right-of-way and road-use permit applications
211 North Commercial Street, Raymond, WA 98577
Contact details are copied from each office’s official page and were checked against it on September 27, 2026.
Do you need a building permit in Pacific County, Washington?
Yes. Pacific County requires building permits for new construction, remodels and additions, including living space, porches, covered patios, garages, and storage sheds larger than 120 square feet or placed on a permanent foundation1. The county conducts inspections during construction, and approved permit documents and plans must remain at the site10. Washington's State Building Code applies in every county and city, with local enforcement11. Electrical permits come from the Washington State Department of Labor and Industries, while demolition permits come from ORCAA rather than Pacific County's Building Division1. Pacific County publishes a fee schedule, but applicants should confirm the actual filing charge with Community Development because the fees are non-refundable12.
Who handles Pacific County building permits, and how do you reach them?
Pacific County's Department of Community Development is the permit office for land use, property division, building, on-site septic and environmental-health applications13. Call the South Bend office at (360) 875-9356 or email [email protected] for building-permit help13. The Long Beach office answers at (360) 642-9382, and its permit technician can be reached at [email protected]14. A completed application needs a detailed site plan, then county departments review the package; the published review window is a minimum of two to eight weeks depending on application type15. Do not begin work until the county contacts you, remaining fees are paid and the approved permit is in hand15.
Does Pacific County have zoning?
Yes. Pacific County's Planning Division provides zoning information for unincorporated land, while Ilwaco, Long Beach, Raymond and South Bend administer zoning inside their city boundaries2. District matters: general setbacks for specified residential districts and Urban Growth Areas are 20 feet in front, 10 feet in back and 5 feet on the side, but corner lots and other site rules can change those dimensions16. Residential development in an Urban Growth Area generally has an 11,000-square-foot minimum lot unless the relevant city sets another minimum; the Seaview Urban Growth Area minimum is 7,200 square feet, with exceptions for legally created lots and qualifying cluster development17. Ask the Planning Division to identify the parcel's district before relying on any general dimensional rule14.
How do septic permits work in Pacific County?
Pacific County Environmental Health requires a septic permit when you construct, repair, replace, expand or significantly alter an on-site septic system4. The application includes a site evaluation, three test holes in or beside the primary and reserve drainfields, and two sets of septic designs prepared by a licensed designer or professional engineer4. For septic or well questions, call Environmental Health at 360-208-4713 or email [email protected]18. Only about 6.8% of Pacific County soils are rated without severe limitations for a conventional drain field, so establish septic feasibility before treating a parcel as buildable19. An existing septic system must also be inspected when real property transfers, before the County Auditor records the transfer20.
Can you live in an RV or tiny home on land in Pacific County?
Pacific County allows one readily transportable, currently registered RV or park model to be temporarily occupied or stored on a parcel, but the unit cannot serve as a permanent dwelling and must meet setbacks5. Occupancy beyond seven consecutive days or 30 days in a calendar year requires connection to a permitted septic system, unless the occupant keeps and can provide receipts from a licensed septic pumper or RV dump station5. Pacific County also limits structures associated with RV use: decks, RV covers, lean-tos, garages, shops and carports are not allowed, while one temporary storage building no larger than 120 square feet is allowed5. A Washington tiny house may be built on wheels and can be no larger than 400 square feet, but it must comply with the state building code and local placement approval6. Pacific County's complete tiny-home occupancy rule could not be confirmed, so ask the Planning Division about a specific parcel before buying or placing a unit14.
Building a home in Pacific County: the steps, in order
- Confirm that the parcel is unincorporated, then ask Pacific County Planning for its zoning district, setbacks and land-use path214.
- Get septic feasibility established early because only about 6.8% of county soils are rated without severe limits for a conventional drain field19.
- Prepare the development application and detailed site plan for Community Development15.
- If access connects to a county road, obtain a road-approach permit; state-highway access goes through the Washington State Department of Transportation21.
- Submit the completed package and fees, then allow a minimum of two to eight weeks for review depending on project type15.
- Pay remaining fees, collect the approved permit and keep approved plans on site for required inspections1510.
What should you check before buying land in Pacific County?
Start with buildable area, not advertised acreage: only about 28.2% of Pacific County land is at a slope of 15% or less, and about 81.1% is wooded2223. Septic is another major screen because only about 6.8% of soils are rated without severe limitations for a conventional drain field19. Annual precipitation averages about 88.3 inches, and development in a floodplain requires a local floodplain development permit2425. Verify legal access too: a driveway onto a Pacific County road needs a road-approach permit, while a state-highway connection needs written state permission2126. For carrying cost, the effective property-tax rate is about 0.8%, with a median annual bill around $2,25089.
Watch-outs
- Pacific County soils are challenging for standard septic systems: only about 6.8% are rated without severe limitations for a conventional drain field19.
- RV occupancy beyond seven consecutive days or 30 days in a calendar year triggers permitted-septic or waste-disposal receipt requirements5.
- A county-road driveway needs a Pacific County road-approach permit; Public Works accepts applications by email, mail or in person2127.
- Pacific County's complete rules for tiny-home occupancy, well permits and certificates of occupancy could not be confirmed; ask Community Development before committing to a parcel or structure1314.
Sources
- Pacific County Building Division, quoted and re-checked
- Pacific County Ordinance No. 184 Zoning, quoted and re-checked
- Pacific County WA DCD - Septic (2026 county census)
- Pacific County Frequently Asked Questions, quoted and re-checked
- Pacific County Frequently Asked Questions, quoted and re-checked
- Tiny Houses (Washington statewide rule), quoted and re-checked
- WAC 51-50-1208 — Section 1208—Interior space dimensions (Washington statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Pacific County Building Division, quoted and re-checked
- RCW 19.27.031 — State building code—Adoption—Conflicts—Opinions (Washington statewide rule), quoted and re-checked
- Pacific County Application Information, quoted and re-checked
- Pacific County Department of Community Development (co.pacific.wa.us)
- Pacific County Community Development Planning Division (co.pacific.wa.us)
- Pacific County Application Information, quoted and re-checked
- Pacific County Ordinance No. 184 Zoning, quoted and re-checked
- Pacific County Ordinance No. 184 Zoning, quoted and re-checked
- Pacific County Environmental Health Division (co.pacific.wa.us)
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Pacific County Frequently Asked Questions, quoted and re-checked
- Pacific County Application Information, quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
- Annual precipitation: Bolthole Index county data
- Planning & regulation — Washington State Department of Ecology (Washington statewide rule), quoted and re-checked
- RCW 47.32.150 — Approach roads, other appurtenances—Permit (Washington statewide rule), quoted and re-checked
- Pacific County Department of Public Works (co.pacific.wa.us)
Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.