Unincorporated Chelan County, Washington enforces the state building code and runs permit intake, plan review, issuance and construction inspections through Community Development12. County zoning also applies, while the Chelan-Douglas Health District issues septic permits34. Manufactured-home placement, permanent park model RVs and tiny homes each have specific approval rules567.
At a glance
- Building permits
- Community Development handles intake, plan review, issuance and construction inspections under adopted building codes12
- Zoning
- County zoning controls apply in unincorporated Chelan County3
- Septic permit
- Required for new systems and most work; issued by the Chelan-Douglas Health District48
- Owner-builder
- Contractor registration exemption available for work on your own property, except work intended for sale, demolition or lease9
- Tiny homes
- Allowed as permanent dwellings under the state residential code; off-site wheeled units need state approval7
- Park model RVs
- Permanent dwelling use requires a county placement permit, qualifying certification, a permanent foundation and approved utilities6
- Private wells
- Some domestic, stock-water and small garden withdrawals are exempt from the state groundwater permit10
Who to call
Building permits
Chelan County Community Development - Building Division
Building permits, plan review, code enforcement and inspections for unincorporated Chelan County
316 Washington Street, Suite 301, Wenatchee, WA 98801
Floodplain permits
Chelan County Community Development - Building Division (programs & inspection line)
FEMA flood protection and Floodplain Development Permits, plus scheduling inspections on active building permits
Zoning
Chelan County Community Development - Current Planning Division
Land development, comprehensive planning, subdivision, zoning and shoreline permits for Chelan County
Roads & driveways
Chelan County Public Works - Development Review
Stormwater, driveway and access permits, and work in the county right-of-way
Contact details are copied from each office’s official page and were checked against it on September 29, 2026.
Do you need a building permit in Chelan County, WA?
Chelan County Community Development handles building-permit intake, plan review, permit issuance and inspections during construction in unincorporated Chelan County2. The county enforces adopted international codes, Washington amendments and county requirements1. Ask the Building Division whether a particular scope needs a permit before work begins; the available county facts do not establish a universal exemption for small projects. Manufactured and mobile homes have a specific county placement process: the county inspects the foundation and setup, and a home built before June 15, 1976 needs a Washington Department of Labor and Industries alteration permit before it is submitted to the county5. An owner working on their own property can qualify for a contractor-registration exemption, but not when acting as a contractor to sell, demolish or lease the property9. That exemption is about contractor registration, not permission to bypass county permits or inspections.
Who is the Chelan County building department, and how do you reach them?
Chelan County Community Development's Building Division handles the county building-permit process2. Reach the office at (509) 667-6225, at 316 Washington Street, Suite 301 in Wenatchee11. Building permits are accepted from 8 a.m. to 4 p.m.11. Published fees vary by application, and residential structures are priced from the applicable fee schedule or valuation chart12. During construction, inspections must be requested 24 hours ahead and by 4 p.m.; provide the permit number, address, inspection type, requested date, name and callback number13. Schedule through the inspection line at 509-667-663514. Current Planning handles land development, subdivisions, zoning and shoreline permits, including county-adopted city codes in named urban growth areas15.
Does Chelan County have zoning?
Yes. Chelan County administers zoning controls in unincorporated areas, and even permit-exempt accessory structures must meet zoning setbacks3. Current Planning applies Chelan County codes, the Shoreline Master Program and county-adopted city codes in the urban growth areas of Wenatchee, Cashmere, Chelan, Entiat and Leavenworth15. The available county facts do not give a single countywide numeric answer for setbacks, minimum lot size, lot coverage, building height or minimum dwelling size, so ask Current Planning to identify the parcel's district and standards before designing or buying. Dividing land also requires local review: Chelan County regulates major and short subdivisions, with fees varying by application type16. A development that will use municipal sewer or water needs written confirmation that the utility will serve each lot, and the improvements must satisfy the utility before final plat approval17.
How do septic permits work in Chelan County?
The Chelan-Douglas Health District handles on-site sewage review and permits in Chelan County and requires licensed people for septic-system work4. A septic permit is required for new construction, installation, repair, modification, connection, expansion or remediation of an on-site system8. Request the final inspection at least two business days ahead and complete the as-built form before the inspection, submitting it with the request or at the inspection18. Site feasibility matters: only about 1.2% of county soils are rated free of severe limits for a conventional drain field, and about 5.5% of county land has a slope of 15% or less1920. Treat septic suitability as an early contingency, not something to solve after house plans are finished.
Can you live in an RV or tiny home on your land in Chelan County?
Chelan County allows tiny houses built on-site as permanent dwellings under the Washington State Residential Code; a tiny house on wheels built off-site must be approved by Washington Labor and Industries as a factory-assembled structure7. A true park model RV may serve as a permanent dwelling only with a county placement permit, ANSI A119.5 certification, a Washington Labor and Industries insignia, a permanent foundation and approved utilities6. That park-model rule does not answer whether an ordinary travel trailer may be occupied temporarily or full-time on private land. Chelan County's temporary-camping rule could not be confirmed, so ask Current Planning about the parcel and proposed duration15. County zoning still controls siting and setbacks in unincorporated areas3.
Building a home in Chelan County: the steps, in order
- Ask Current Planning to confirm the parcel's zoning, setbacks, allowed dwelling type and any urban-growth-area rules153.
- Establish water and wastewater feasibility. The Health District permits septic work; qualifying groundwater uses may be exempt from a state water-right permit, but larger withdrawals require one810.
- Resolve access with Public Works before constructing an approach to a county road2122.
- Submit plans to the Building Division for intake and plan review, and use the published fee schedule or valuation chart to budget the permit212.
- Obtain a county Floodplain Development Permit if the proposal is in a floodplain23.
- Schedule required construction inspections 24 hours ahead and before the daily 4 p.m. cutoff13.
What to check before you buy land in Chelan County
Start with buildability. Only about 5.5% of Chelan County land has a slope of 15% or less, and only about 1.2% of soils are rated free of severe limits for conventional septic drain fields2019. Confirm legal access, zoning, septic area, water source and floodplain status before closing. A qualifying single or group domestic groundwater use of no more than 5,000 gallons per day may be exempt from the state appropriation permit, as may stock water and a lawn or noncommercial garden of no more than 0.5 acre; uses outside the exemptions require a permit10. Floodplain development requires a county permit23. A county-road approach needs county permission, while a connection on a state-highway right-of-way needs written permission from the Washington Department of Transportation2224.
Watch-outs
- The owner-builder and agricultural exemptions concern contractor registration; neither fact establishes an exemption from building permits, zoning or inspections925.
- Chelan County's permanent-dwelling rule covers qualifying park model RVs, but temporary camping and ordinary travel-trailer occupancy could not be confirmed; ask Current Planning before relying on an RV for housing615.
- A municipal water or sewer promise for a subdivision must be documented in writing for each lot, and unfinished utility improvements can require financial security before final plat approval17.
Sources
- Building, quoted and re-checked
- Building, quoted and re-checked
- Building, quoted and re-checked
- Service Providers & Licensed Designers, quoted and re-checked
- Building Division Frequently Asked Questions, quoted and re-checked
- Building Division Frequently Asked Questions, quoted and re-checked
- Building Division Frequently Asked Questions, quoted and re-checked
- Service Providers & Licensed Designers, quoted and re-checked
- RCW 18.27.090 Exemptions, quoted and re-checked
- Land Use — Water Rights, quoted and re-checked
- Chelan County Community Development - Building Division (co.chelan.wa.us)
- Community Development Fee Schedule, quoted and re-checked
- Building, quoted and re-checked
- Chelan County Community Development - Building Division (programs & inspection line) (co.chelan.wa.us)
- Chelan County Community Development - Current Planning Division (co.chelan.wa.us)
- Community Development Fee Schedule, quoted and re-checked
- Land Use, quoted and re-checked
- Service Providers & Licensed Designers, quoted and re-checked
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Share of land at 15% slope or less: Bolthole Index county data
- Chelan County Public Works - Development Review (co.chelan.wa.us)
- RCW 36.75.130 — Approaches to county roads—Rules regarding construction—Penalty (Washington statewide rule), quoted and re-checked
- Building, quoted and re-checked
- RCW 47.32.150 — Approach roads, other appurtenances—Permit (Washington statewide rule), quoted and re-checked
- RCW 18.27.090 Exemptions, quoted and re-checked
Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.