Bolthole Index

Windham County, Vermont

Building permits, zoning and land rules in the Town of Marlboro, Vermont

The Town of Marlboro in Windham County generally requires a town zoning permit before covered land or building development begins or a structure is used or occupied.1 We could not confirm a separate town structural building permit for an ordinary owner-occupied home; Vermont's public-building code excludes qualifying owner-occupied single-family residences.2 Vermont DEC handles permits for wastewater systems and potable-water supplies.34

At a glance

Building permit
A Marlboro zoning permit generally applies to covered development; a separate structural permit for an ordinary owner-occupied home was not confirmed12
Zoning
Yes; Marlboro administers municipal zoning through its Zoning Administrator and Development Review Board5
Septic and water
State permits generally apply to new, replacement or modified wastewater systems and potable-water supplies34
RV living
Primitive-camp occupancy is limited to 60 days per year and no more than 3 consecutive weeks6
Tiny homes
No separate tiny-home or minimum dwelling-size rule was confirmed; town zoning and state water and wastewater rules still apply53
Rural Residential lot
A single- or two-family dwelling generally needs 2 acres and 200 feet of frontage in the RUR district7
Agricultural / Forest lot
A single- or two-family dwelling generally needs 10 acres and 200 feet of frontage in the AGR/F district8
Flood hazards
The flood and fluvial-erosion overlay adds controls, and the more restrictive rule governs when standards conflict9

Who to call

Zoning

Town of Marlboro Zoning Administrator

Marlboro zoning permits, subdivision applications, zoning questions and local development review

(802)254-2181

Zoning Administrator, Attn: Zoning, PO Box E, 510 South Road, Marlboro, VT 05344

Septic permits

Vermont DEC Wastewater System and Potable Water Supply Program

State permits for soil-based wastewater systems, private potable-water supplies, and municipal water and sewer connections

802-828-1535

1 National Life Drive, Davis 4 Montpelier, VT 05620-3521

Also useful

Vermont DEC Springfield Regional Office

Regional permit assistance for Marlboro, including state environmental permit questions

802-522-2220

Environmental Conservation 100 Mineral Street Springfield, Vermont 05156

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Town of Marlboro means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in the Town of Marlboro, Vermont?

Marlboro generally requires a zoning permit before covered land or building development starts or before land or a structure is used, extended or occupied.1 Qualifying non-habitable residential accessory buildings under 200 square feet and under 16 feet high do not need a zoning permit when they stay outside required setbacks and the flood and fluvial-erosion overlay, but the owner must submit written notice and a sketch before construction.1

The current materials do not confirm a separate Marlboro structural building permit for an ordinary detached home. Vermont's public-building code excludes a qualifying owner-occupied single-family residence, although a different use can bring a building within state jurisdiction.2 Ask the Zoning Administrator to classify the exact project before work begins.10 A farm structure does not require a municipal permit, but the farmer must notify the Zoning Administrator and meet applicable setbacks; that exemption does not cover a dwelling for human habitation.1

Who handles zoning permits in the Town of Marlboro?

The Town of Marlboro Zoning Administrator is the first local contact for a proposed house, addition, accessory building, new use or subdivision.5 The town directs applicants to contact the office early, complete Vermont's Permit Navigator and have all local, state and federal approvals in place before work begins.10 Contact the office at (802)254-2181 or write to Zoning Administrator, Attn: Zoning, PO Box E, 510 South Road, Marlboro, VT 05344.10

The Zoning Administrator may issue or deny a complete application within 30 days after receiving the required information and approvals.1 An unstarted permit expires after 1 year, while a project not substantially completed expires after 2 years unless the permit states a longer period.1 The town publishes zoning, subdivision and driveway applications, and after-the-fact zoning fees are tripled.1110 Ask for the current fee amount and whether Development Review Board approval is needed for the proposal.12

Does the Town of Marlboro have zoning, lot sizes and setbacks?

Yes. Marlboro has municipal zoning administered through a Zoning Administrator and Development Review Board, and the official zoning map controls the parcel's current district.513 A single- or two-family dwelling in the Rural Residential district generally needs at least 2 acres and 200 feet of frontage; the Agricultural / Forest Production district generally requires 10 acres and 200 feet of frontage.78

Both districts use a 30-foot front setback and 50-foot side and rear setbacks for a single- or two-family dwelling, subject to overlays and other requirements.1415 The Rural Residential building-coverage cap is 10%, while the Agricultural / Forest Production cap is 3% and its building floor area and footprint are each capped at 10,000 square feet.1617 The flood and fluvial-erosion overlay sits on top of the underlying district, and the more restrictive standard applies when rules conflict.9

How do septic and well permits work inside Marlboro?

Vermont DEC, rather than the Town of Marlboro or Windham County, generally permits construction, replacement or modification of wastewater systems and potable-water supplies, subject to statutory exemptions.34 A substantially completed permitted system needs installer or licensed-designer certification that it was installed to the approved design, inspected, tested and passed the required performance tests.18

The Vermont DEC program can be reached at 802-828-1535, and its Springfield Regional Office serves Marlboro and provides permit assistance.1920 Windham County soil data show that only about 9.8% of mapped soils avoid a severe limitation rating for a conventional septic drain field, so a parcel-level evaluation should come before fixing the house site.21 A new groundwater source also must be tested before use.4

Can you live in an RV or tiny home in the Town of Marlboro?

Marlboro does not treat an RV or travel trailer as an unrestricted year-round residence. A primitive camp may include a recreational vehicle, travel trailer, mobile home, cabin or similar temporary accommodation, but living quarters are limited to 60 days per year and no more than 3 consecutive weeks.6 A tent must be more than 6 feet from a lot line and cannot be connected to utilities, while a primitive camp must observe district setbacks, including 75 feet from the mean high-water mark of a stream or body of water.22

A stored trailer or motor home must be in a rear or side yard at least 25 feet from a lot line on property with a permanent dwelling connected to compliant water and septic systems.6 We could not confirm a separate tiny-home category or minimum dwelling floor area. Ask the Zoning Administrator how a proposed tiny home is classified, and obtain the state water and wastewater approvals its occupancy requires.53

Building a home in Marlboro: what are the steps?

  1. Ask the Marlboro Zoning Administrator to identify the parcel's district, overlays, allowed residential use and required review path.1013
  1. Confirm the district's lot area, frontage, setbacks, coverage and building-height standards before finalizing a site plan.7814
  1. Complete Vermont's Permit Navigator and determine which local, state and federal approvals must precede construction.10
  1. Establish wastewater and potable-water feasibility with a qualified designer and obtain the applicable Vermont permits.34
  1. Submit the complete Marlboro zoning application, fee and proof of required health and outside-agency approvals.1
  1. Wait for the town decision and confirm the permit's effective date before starting work.1
  1. Complete the state-required wastewater and water-system inspection, testing and certification before relying on the installed system.18

What should you check before buying land in Marlboro?

Start with Marlboro's official zoning map and confirm the parcel's underlying district and every overlay with the Zoning Administrator.13 The difference between the Rural Residential and Agricultural / Forest Production schedules is substantial: their minimum lot areas are 2 acres and 10 acres, respectively.78 Confirm access as well; the town lists a driveway permit, but the available material does not establish the operative approval standard.11

Treat septic feasibility as a purchase contingency because only about 9.8% of Windham County's mapped soils avoid severe limitations for a conventional drain field.21 Check stream, flood and fluvial-erosion mapping before choosing a building envelope because the overlay adds restrictions to the underlying district.9 Windham County is 91.6% wooded, and 51.8% of county land has a slope of 15% or less; those county figures provide screening context, not parcel findings.2324

Watch-outs

  • A small accessory building may be exempt from a zoning permit yet still requires advance written notice and a setback sketch.1
  • After-the-fact Marlboro zoning-permit fees are tripled, so contact the Zoning Administrator before beginning development.11
  • Primitive-camp limits do not establish permission for year-round RV residence in Marlboro.6
  • We could not confirm a separate local certificate-of-occupancy requirement or ordinary residential construction-inspection schedule; ask the Zoning Administrator what final approvals apply.10

Sources

  1. Marlboro Zoning Regulations (Town of Marlboro), quoted and re-checked
  2. 20 V.S.A. § 2730 — Definitions (Vermont statewide rule), quoted and re-checked
  3. Vermont Statutes, Title 10, Chapter 64 (Town of Marlboro), quoted and re-checked
  4. legislature.vermont.gov (Town of Marlboro), quoted and re-checked
  5. Zoning Department (Town of Marlboro), quoted and re-checked
  6. Marlboro Zoning Regulations, Section 440 – Primitive Camps (Town of Marlboro), quoted and re-checked
  7. Marlboro Zoning Regulations – Effective 3/5/2024, retroactive (Town of Marlboro), quoted and re-checked
  8. Marlboro Zoning Regulations – Effective 3/5/2024, retroactive (Town of Marlboro), quoted and re-checked
  9. Marlboro Zoning Regulations, Flood and Fluvial Erosion Hazard Area Overlay (Town of Marlboro), quoted and re-checked
  10. Town of Marlboro Zoning Administrator (marlborovt.us)
  11. Zoning Department (Town of Marlboro), quoted and re-checked
  12. Zoning Department (Town of Marlboro), quoted and re-checked
  13. Marlboro Zoning Regulations – Effective 3/5/2024, retroactive (Town of Marlboro), quoted and re-checked
  14. marlborovt.us (Town of Marlboro), quoted and re-checked
  15. marlborovt.us (Town of Marlboro), quoted and re-checked
  16. marlborovt.us (Town of Marlboro), quoted and re-checked
  17. marlborovt.us (Town of Marlboro), quoted and re-checked
  18. legislature.vermont.gov (Town of Marlboro), quoted and re-checked
  19. Vermont DEC Wastewater System and Potable Water Supply Program (dec.vermont.gov)
  20. Vermont DEC Springfield Regional Office (dec.vermont.gov)
  21. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  22. Marlboro Zoning Regulations, Section 440 – Primitive Camps (Town of Marlboro), quoted and re-checked
  23. Wooded share of land: Bolthole Index county data
  24. Share of land at 15% slope or less: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Marlboro

Town of Marlboro’s own rules

  • Building permitLimited

    Land and building development, and use, extension, or occupancy of land or structures, inside Marlboro town, Vermont, under the Town's zoning regulations.

    • A Zoning Permit must generally be issued by the Zoning Administrator before land or building development commences, or before land or a structure is used, extended, or occupied.
    • The Zoning Administrator may issue a permit only after the proposed development complies with current Marlboro Zoning Regulations; the required zoning permit and/or division-of-land application is properly completed and submitted; the zoning permit fee established by the Board of Selectmen is paid; state and town health requirements are met and proof is submitted; all applicable local reviews and approvals are secured, including site plan approval, conditional use permits, variances, rights of way, and planned unit development review where required; and State or Federal agency stipulations are satisfied.
    • The Zoning Administrator must issue or deny the permit within 30 days after submission of all necessary application data and approvals.
    • Permits expire one year after the effective date if the project has not started and two years after the effective date if the project has not been substantially completed, unless longer times are stated in the permit; permits may be renewed, taking later amendments into account.
    • No zoning permit is required for qualifying small accessory buildings associated with residential uses that are not used for human occupancy, are less than 200 square feet in floor area and less than 16 feet in height, and are outside required setback areas and the Flood and Fluvial Erosion Hazard Area Overlay District; written notification with a sketch plan showing setbacks from property lines and surface waters must be submitted before construction.
    • No zoning permit is required for interior repair or renovation that does not change the lawful use of a structure.
    • No zoning permit is required for exterior repair or renovation that does not involve Substantial Improvement, alter the foundation plan, violate setback provisions, or change the lawful use. Substantial Improvement is generally work costing 50 percent or more of the structure's pre-improvement market value, or restoration after damage; the definition excludes work solely necessary for safe living conditions under existing state or local health, sanitary, or safety codes and alterations of a Historic Structure that preserve its designation.
    • No zoning permit is required for landfill or excavation incidental and accessory to a lawful use, if it does not violate the regulations or change the use of land.
    • No zoning permit is required for residential entry stairs, handicap-access ramps, walkways outside public rights of way, stone walls and fences no higher than 4 feet, mailboxes, clotheslines, and lampposts that do not obstruct rights of way or interfere with corner visibility or vehicular sight distances; the exclusion does not apply to decks, porches, or stair landings larger than 15 square feet.
    • For a temporary structure in place more than one week, written notification with a sketch plan showing setbacks from property lines and surface waters must be submitted before construction.
    • No municipal permit is required for a farm structure. The person engaged in farming must notify the Zoning Administrator of the intent to build and comply with applicable setbacks unless a variance is applied for and approved by the Secretary of Agriculture, Food and Markets. A farm structure excludes a dwelling for human habitation.
    • No zoning permit is required for livestock, garden, orchard, and dog fences.

    small accessory building maximum floor area: < 200 square feet; structure must be less than this amount (Must also be less than 16 feet high, outside required setbacks and the Flood and Fluvial Erosion Hazard Area Overlay District, and not used for human occupancy.) · small accessory building maximum height: < 16 feet; structure must be less than this amount (Must also be less than 200 square feet, outside required setbacks and the Flood and Fluvial Erosion Hazard Area Overlay District, and not used for human occupancy.) · substantial improvement threshold: >= 50 percent of pre-improvement market value (The regulations separately address restoration after damage and exclude specified health, sanitary, safety-code work and qualifying Historic Structure alterations.) · temporary structure notification threshold: > 1 week (Written notification and a sketch plan are required before construction; the provision does not state that a zoning permit is required.) · fence height exemption limit: <= 4 feet (The exclusion does not apply where the structure or feature obstructs public rights of way or interferes with corner visibility or vehicular sight distances.) · stair landing exemption limit: <= 15 square feet (The exclusion does not apply to decks or porches and does not apply to stair landings greater than 15 square feet.)

    “After the effective date of these Regulations, no land or building developments as herein defined may commence, nor shall any land or structure be used, be extended in any way, or be occupied, unless a Zoning Permit has been duly issued by the Zoning Administrator, as provided for in the Act. [...] Exemptions: Notwithstanding the above, no Zoning Permit shall be required for the following activities of development carried out in conformance with any applicable standards of these Regulations.”
  • Local zoningPresent

    Land inside Marlboro town, Vermont.

    • The town administers zoning through a Zoning Administrator and Development Review Board.
    “In accordance with the Vermont Municipal and Regional Planning and Development Act, 24 V.S.A. Chapter 117, hereinafter referred to as the "Act,” there are hereby established Zoning Regulations for the Town of Marlboro which are set forth in the text and maps that constitute these Regulations.”
  • Zoning districtsPublished

    Zoning districts and overlay districts inside Marlboro town.

    • The official zoning map is the final authority as to current zoning status.
    • The regulations identify Rural Residential, Village, Agricultural/Forest Production, Conservation Priority, Commercial West/East, Educational, Wildlife Habitat, Shoreland, Surface Water Buffer, and Flood and Fluvial Erosion Hazard Area districts or overlays.
    “The Town of Marlboro is hereby divided into the following Zoning Districts as shown on the official Zoning Map: Zoning Districts: Abbreviation: Rural Residential RUR Village VIL Agricultural / Forest Production AGR/F Conservation Priority CONS Commercial COM-W and COM-E Educational EDU”
  • Minimum lot sizeSpecified

    Single- or two-family dwelling development in the Agricultural / Forest Production (AGR/F) district.

    • The AGR/F district also requires 200 feet of lot frontage.
    • The quoted AGR/F standards are subject to other zoning, overlay, subdivision, and state requirements.

    minimum lot area: >= 10 acres

    “Area, Dimensional, and Coverage Requirements: Lot Area Minimum: 10 acres Lot Frontage Minimum: 200 feet”
    One more reviewed finding on this topic
  • SetbacksSpecified

    Single- or two-family dwelling development in the Agricultural / Forest Production (AGR/F) district.

    • Front setback is 30 feet; side and rear setbacks are 50 feet each.
    • No height limit applies to agricultural uses under the quoted district standards.
    • Additional overlay setbacks may apply.

    front setback: >= 30 feet · side setback: >= 50 feet · rear setback: >= 50 feet

    “Front Yard Minimum Setback: 30 feet [...] Side and Rear Yard Minimum Setbacks: 50 feet each”
    One more reviewed finding on this topic
    • Specified — Single- or two-family dwelling development in the Rural Residential (RUR) district.
      “Front Yard Minimum Setback: 30 feet [...] Side and Rear Yard Minimum Setbacks: 50 feet each”
  • Lot coverageSpecified

    Development in the Agricultural / Forest Production (AGR/F) district.

    • Building coverage maximum is 3 percent.
    • Building floor area and footprint are each limited to 10,000 square feet.

    building coverage maximum: <= 3 percent · building floor area maximum: <= 10000 square feet · building footprint maximum: <= 10000 square feet

    “Building Floor Area Maximum 10,000 square feet Building Footprint Maximum 10,000 square feet Building Coverage Maximum: 3 percent”
    One more reviewed finding on this topic
    • Specified — Development in the Rural Residential (RUR) district.
      “Building Floor Area Maximum None Building Footprint Maximum None Building Coverage Maximum: 10 percent”
  • Building heightSpecified

    Buildings in the Agricultural / Forest Production (AGR/F) district.

    • Maximum is three stories or 35 feet, whichever is less.
    • There is no height limit for agricultural uses.
    • Accessory-use height maximum is 25 feet; wind-energy total tower height maximum is 150 feet.

    maximum structure height: three stories or 35 feet, whichever is less (no height limit for agricultural uses) · accessory-use height maximum: <= 25 feet · wind-energy total tower height: <= 150 feet

    “Structure Height Maximum: Three stories or 35 feet, whichever is less. No height limit for agricultural uses. 150 feet Total Tower Height, Wind Energy System Accessory Use Height Maximum 25 feet.”
    One more reviewed finding on this topic
    • Specified — Buildings in the Rural Residential (RUR) district.
      “Structure Height Maximum: Three stories or 35 feet, whichever is less. No height limit for agricultural uses. 150 feet Total Tower Height, Wind Energy System Accessory Use Height Maximum 25 feet.”
  • Living in an RVLimited

    Recreational vehicles, trailers, and motor homes on private property inside Marlboro town.

    • A trailer or motor home may be parked for storage in the rear or side yard no closer than 25 feet to any lot line.
    • The property must have a permanent dwelling.
    • The dwelling must be connected to water and septic systems in accordance with the town’s Zoning Regulations and sewage ordinance.
    • Living quarters in a Primitive Camp are limited to no more than 60 days per year and no more than three consecutive weeks.

    lot-line setback: >= 25 feet (rear or side yard storage only) · annual occupancy: <= 60 days (Primitive Camp living quarters) · consecutive occupancy: <= 3 weeks (Primitive Camp living quarters)

    “Camp, Primitive: A single structure including, but not limited to, a cabin, mobile home, travel trailer, recreational vehicle, tent, shelter, houseboat, or other recreational accommodation for seasonal or temporary living. Primitive Camps shall have no interior plumbing consisting of more than a sink with water, and shall be used no more than three consecutive weeks per year and no more than a total of 60 days per year.”
  • Camping on your landLimited

    Primitive camps and tent camping inside Marlboro town.

    • A tent must be more than six feet from any lot line and cannot be hooked up to utilities.
    • Primitive Camp living quarters require specific approval of the landowner or an approved campground.
    • Use is limited to 60 days per year and no more than three consecutive weeks.
    • Primitive camps are not permanent dwellings and are subject to district setbacks, including 75 feet from the mean high-water mark of a stream or body of water.
    • Campgrounds require a Conditional Use Permit from the Development Review Board.

    tent lot-line setback: > 6 feet (tent cannot be hooked up to utilities) · annual occupancy: <= 60 days (Primitive Camp) · consecutive occupancy: <= 3 weeks (Primitive Camp) · water setback: >= 75 feet (mean high-water mark)

    “The owner of a tent may erect it on his/her property provided that it is further than six (6) feet from any lot line and is not hooked up to any utilities. A Primitive Camp may be used as living quarters upon specific approval of the landowner or in an approved campground for less than or equal to sixty (60) days per year, and no more than three consecutive weeks.”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units in Marlboro town zoning districts, including Rural Residential.

    • In the Rural Residential district, an accessory dwelling unit is listed as a permitted use only if located within 500 feet of a State Highway or Class 2 or 3 town road.
    • A Conditional Use Permit is required if creation involves a new accessory structure, an increase in the height or floor area of the existing dwelling, or an increase in parking-area dimensions.
    • Other districts and overlay requirements may impose different conditions.
    “A Conditional Use Permit shall be required if one or more of the following is involved in the creation of an accessory dwelling unit: a. A new accessory structure, b. An increase in the height or floor area of the existing dwelling, or c. An increase in the dimensions of the parking areas.”
  • Subdividing landRegulated (with conditions)

    Subdivision applications inside Marlboro town.

    • The town’s official zoning page lists a Subdivision Permit application and subdivision regulations.
    • State wastewater permitting may also apply when subdivision affects potable-water or wastewater systems.
    “Subdivision Permit [...] Marlboro Subdivision Regulations March 4, 2010 [...] FINAL Marlboro Subdivision Regulations JULY 2026”
  • Building in a floodplainLimited

    Land inside Marlboro town’s Flood and Fluvial Erosion Hazard Area Overlay District.

    • The overlay is superimposed over underlying zoning districts.
    • Both underlying-district and overlay requirements apply.
    • Where requirements conflict, the most restrictive guidelines apply.
    • The overlay includes river corridors, special flood hazard areas, and town-identified fluvial erosion areas.
    “All lands to which the FFEHA Overlay District applies shall meet the requirements of the underlying zoning district(s) and the FFEHA Overlay District. Where there is a conflict between the underlying zoning or other overlay districts and the FFEHA Overlay District, compliance with the most restrictive guidelines shall be required for land development under these Regulations.”
  • Permit feesPublished

    Marlboro zoning, subdivision, and driveway permit fees.

    • The official page identifies a 2026 zoning-fee schedule but the fee amounts were not exposed in the opened page text.
    • After-the-fact permit fees are tripled.
    “Subdivision or Boundary Line Adjustment Zoning Permit Base Fee [...] Base Fee: $200 per lot or per lot affected”
  • Permit processPublished (with conditions)

    Permit process for land development and dwelling use inside Marlboro town.

    • Contact the Zoning Administrator early.
    • Complete the state Permit Navigator.
    • Obtain local, state, and federal permits before work begins.
    • A Zoning Permit is required before covered land or building development, use, extension, or occupancy.
    “All applicants should complete the state’s Permit Navigator at this link; and applicants must have a local permit as well as any state or federal permits in place before work begins”

Rules another office applies inside Town of Marlboro

Town of Marlboro does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Septic permitRequired

    Construction, replacement, or modification of wastewater systems serving land inside Marlboro town.

    • The permit requirement is subject to statutory exemptions in 10 V.S.A. § 1974 and rule-based exemptions.
    • The statute also covers new buildings or structures where the use or occupancy requires construction or modification of a potable-water or wastewater system.
    “Except as provided in this section and sections 1974 and 1978 of this title, a person shall obtain a permit from the Secretary before: [...] (3) constructing, replacing, or modifying a potable water supply or wastewater system;”
  • Septic inspectionRequired

    Permitted potable-water and wastewater systems serving land inside Marlboro town.

    • The Secretary must receive installation certification before the permit is valid for a substantially completed system.
    • The system must be installed according to the permitted design or compliant record drawings, inspected, properly tested, and successfully meet performance tests.
    “No permit issued by the Secretary shall be valid for a substantially completed potable water supply and wastewater system until the Secretary receives a statement from an installer or a licensed designer certifying that [...] the potable water supply and wastewater system: [...] (2) were inspected; (3) were properly tested; and (4) have successfully met those performance tests.”
  • Well permitRequired

    Construction, replacement, or modification of a potable water supply, including a new well, serving land inside Marlboro town.

    • Statutory exemptions apply, including exemptions under 10 V.S.A. § 1974.
    • A new groundwater source must also be tested before use under 10 V.S.A. § 1982.
    ““groundwater source” means that portion of a potable water supply that draws water from the ground, including a drilled well, shallow well, driven well point, or spring.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Marlboro or Windham County directly.

  • Owner-builder exemption — Owner-builder exemptions from Marlboro town permitting or construction requirements.
  • Building code adopted — Building-code adoption applicable inside Marlboro town.
  • Inspections — Building inspections inside Marlboro town.
  • Certificate of occupancy — Certificates of occupancy inside Marlboro town.
  • Minimum dwelling size — Single-family dwellings inside Marlboro town.
7 more unanswered
  • Tiny homes
  • Manufactured homes
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Marlboro publishes no rule on the point, not that none exists. Windham County’s page lists the county offices to call.

← All of Windham County: county rules, score and offices