Bolthole Index

Windham County, Vermont

Building permits, zoning and land rules in Bellows Falls, Vermont

The Village of Bellows Falls in Windham County requires a local zoning permit for construction, structural changes, relocation, enlargement and changes of use.1 Rockingham Planning & Zoning administers village zoning, while the State of Vermont issues Wastewater System and Potable Water Supply permits.23

At a glance

Building permit
A local zoning permit is required for defined land development1
Zoning
Bellows Falls is divided into nine local zoning districts4
Septic and water
The State of Vermont issues Wastewater System and Potable Water Supply permits5
RV living
Occupancy beyond 90 days in a 12-month period requires full-size disposal-field compliance6
Manufactured homes
Allowed where single-family homes are permitted or in an approved park, with water and sewer connections7
Owner-builder
A conditional state energy-standards exemption may apply, but it does not waive local permits8
Flood hazard areas
Development requires conditional-use review and compliance with the flood-hazard bylaw9

Who to call

Zoning

Rockingham Planning & Zoning Department

Zoning permits, subdivision review and flood-hazard land-use review in Bellows Falls

8022894874

[email protected]

7 Square, Bellows Falls, VT 05101

Septic permits

Vermont DEC Springfield Regional Office

Regional permit assistance for Rockingham, including state wastewater and potable-water permitting questions

802-522-2220

Environmental Conservation 100 Mineral Street Springfield, Vermont 05156

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Village of Bellows Falls means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Bellows Falls, Vermont?

Yes. Inside the Village of Bellows Falls, a local zoning permit is required before construction, reconstruction, structural alteration, relocation or enlargement of a building or structure, as well as for specified excavation, land division and changes of use.1 Rockingham Planning & Zoning describes this as permitting land development; it is the first local office to contact for a house, addition, shed or barn.10

The permit path depends on the zoning district, proposed use, structure and lot. An application may be handled administratively, while commercial development, large residential projects and subdivisions go to the Development Review Board.11 Fees are due when the application is submitted, but the official page does not state the amounts.12 A local zoning permit does not replace state approvals, including any applicable residential energy, fire-safety, wastewater or potable-water requirements.1314

Who issues building and zoning permits in Bellows Falls?

Rockingham Planning & Zoning administers the zoning bylaws and issues local zoning permits for development in Bellows Falls.15 The office accepts fully electronic submissions and encourages applicants to make contact early so staff can identify the correct application and review path.10

Straightforward applications may be decided administratively; an application requiring Development Review Board approval proceeds through a warned public meeting, testimony, deliberation and a written decision before the Zoning Administrator issues an approved permit.11 Subdivision of land also requires Development Review Board review.16 Contact Rockingham Planning & Zoning at [email protected] or 8022894874, or visit 7 Square in Bellows Falls.10 Ask the office to confirm the current fee, the required plan materials, the parcel's zoning district and whether Development Review Board review is necessary before submitting.

Does Bellows Falls have zoning, setbacks and lot-size rules?

Bellows Falls has local zoning and is divided into nine districts, so the parcel's mapped district controls permitted uses and dimensional standards.4 In Residential 7, the minimum lot area is 5,000 square feet with 50 feet of frontage; in Residential 14, it is 8,712 square feet with 100 feet of frontage.1718

Residential 7 has a 5-foot front yard, 30-foot rear yard and 20 feet of combined side yards, with no individual side yard below 8 feet; the front-yard rule has a bylaw exception.19 Residential 14 has 20-foot front and rear yards and a 30-foot side-yard standard.20 Both residential districts cap building height at 35 feet except for agricultural buildings.2122 Because these figures are district-specific, verify the parcel map and any overlays with Rockingham Planning & Zoning before using them for a site plan.23

How do septic permits work inside Bellows Falls?

The State of Vermont, not Windham County, is the permitting authority for Wastewater System and Potable Water Supply permits affecting property in Bellows Falls.5 A dwelling or other building cannot be occupied until the State has issued the required permit.14 New wastewater or water-supply construction requires a permit, and modifications or replacement work may require one as well.24

Rockingham is served by the Vermont DEC Springfield Regional Office, which offers permit assistance.25 Windham County soil data show that only about 9.8% of mapped soils avoid a severe limitation rating for a conventional septic drain field, so buyers considering an onsite system should make wastewater feasibility an early contingency.26 That soil statistic is county-level, not a parcel determination. Ask the Springfield office and a licensed designer what the proposed use requires before relying on an existing system, planning a replacement field or assuming municipal service is available.

Can you live in an RV or tiny home in Bellows Falls?

Bellows Falls limits human occupancy of an RV, trailer, tent, yurt, cabin, shelter, houseboat or similar accommodation on a lot outside a campground. Occupancy beyond 90 days in a 12-month period is allowed only when the Town of Rockingham Health Regulation requirements for a full-size disposal field are met.6 This rule answers duration and sanitation, but the proposed location and use may still need local zoning approval.1

The current materials do not establish a separate tiny-home category or a minimum dwelling floor area. Ask Rockingham Planning & Zoning which use and structure category applies to the particular design. Manufactured homes have a clearer rule: they may be installed where single-family dwellings are permitted or in an approved mobile-home park, and they must connect to water and sewer facilities.7 One accessory dwelling unit may be allowed with a single-family home when wastewater capacity, setbacks, coverage and parking requirements are satisfied.27

Building a home in Bellows Falls: what are the steps?

  1. Identify the parcel's Bellows Falls zoning district and any flood-hazard overlay with Rockingham Planning & Zoning. The village has nine zoning districts with district-specific standards.4
  1. Confirm the proposed use, lot area, frontage, setbacks, coverage and height before finalizing a site plan. Residential 7 and Residential 14 have different dimensional schedules.1718
  1. Contact Rockingham Planning & Zoning early and determine whether the application is administrative or requires Development Review Board review.1011
  1. Submit the complete local zoning-permit application and required fee.28
  1. Apply for the required state Wastewater System and Potable Water Supply permit; occupancy must wait until that permit is issued.14
  1. If the site is in a mapped special flood-hazard area, obtain conditional-use approval and comply with the Flood Hazard Bylaw.9
  1. Do not begin work until the local permit is effective after the applicable appeal period.29

What should you check before buying land in Bellows Falls?

Start with the zoning map, permitted use and residential dimensional schedule rather than assuming one village-wide setback or lot-size rule.4 Confirm legal access as well: the bylaw generally calls for a vehicular right-of-way at least 50 feet wide when development relies on a permanent easement or right-of-way, subject to stated exceptions.30

Check mapped flood hazards before committing to a building envelope because new construction, substantial improvements and other development in those areas require a conditional-use permit.31 For an onsite wastewater proposal, investigate soils and obtain state guidance early; only about 9.8% of Windham County's mapped soils avoid severe limitations for conventional drain fields.26 For public water or sewer, ask the village and the Vermont DEC Springfield Regional Office to confirm availability, allocation and connection approvals for the exact parcel. The available rules do not confirm a universal connection-distance requirement. Finally, confirm whether the intended home triggers Vermont Residential Building Energy Standards or other state safety requirements.32

Watch-outs

  • A Bellows Falls zoning permit does not become effective until 15 days after issuance, or until final adjudication if it is appealed.29
  • A mapped special flood-hazard site requires conditional-use approval in addition to compliance with the flood-hazard bylaw.9
  • The owner-builder provision is a conditional exemption from state residential energy standards, not an exemption from Bellows Falls zoning permits.8
  • We could not confirm a separate local certificate-of-occupancy program or residential construction-inspection schedule; ask Rockingham Planning & Zoning what final approvals apply to the proposed building.10

Sources

  1. Zoning permits and application process (Village of Bellows Falls), quoted and re-checked
  2. Planning and Zoning Department (Village of Bellows Falls), quoted and re-checked
  3. WW Permit Frequently Asked Questions (Village of Bellows Falls), quoted and re-checked
  4. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  5. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  6. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  7. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  8. 30 V.S.A. § 51 — Residential building energy standards (Vermont statewide rule), quoted and re-checked
  9. Flood Hazard Areas (Village of Bellows Falls), quoted and re-checked
  10. Rockingham Planning & Zoning Department (rockinghamvt.org)
  11. Zoning Permits (Village of Bellows Falls), quoted and re-checked
  12. Zoning Permits (Village of Bellows Falls), quoted and re-checked
  13. 30 V.S.A. § 51. Residential building energy standards; stretch code (Village of Bellows Falls), quoted and re-checked
  14. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  15. Zoning Permits (Village of Bellows Falls), quoted and re-checked
  16. Zoning Permits (Village of Bellows Falls), quoted and re-checked
  17. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  18. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  19. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  20. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  21. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  22. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  23. Bellows Falls zoning districts and dimensional regulations (Village of Bellows Falls), quoted and re-checked
  24. WW Permit Frequently Asked Questions (Village of Bellows Falls), quoted and re-checked
  25. Vermont DEC Springfield Regional Office (dec.vermont.gov)
  26. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  27. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  28. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  29. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  30. windhamregional.org (Village of Bellows Falls), quoted and re-checked
  31. Town of Rockingham Zoning Bylaws, as amended effective September 10, 2025 (Village of Bellows Falls), quoted and re-checked
  32. Residential Building Energy Standards (Village of Bellows Falls), quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of Bellows Falls

Village of Bellows Falls’s own rules

  • Building permitRequired

    Construction, reconstruction, structural alteration, relocation, enlargement, or use change inside Bellows Falls village.

    • No land development may commence until a Zoning Permit or Certificate of Compliance for land division has been issued.
    • Applications must be complete and include the applicable fee.
    • A permit does not eliminate other required municipal or state approvals.
    “The Zoning Department permits all development occurring in the Town of Rockingham. The term "development" includes: The division of land into two or more parcels; the construction, reconstruction, structural alteration, relocation, or enlargement of any building or structure; any mining, excavation, or landfill undertaken in connection with construction; and any change in the use of a building, structure, or land, or any extension of the use of land.”
    3 more reviewed findings on this topic
    • Required — Construction, reconstruction, structural alteration, relocation, enlargement, or change in use inside Bellows Falls village limits.
      “The Zoning Department permits all development occurring in the Town of Rockingham. The term "development" includes: The division of land into two or more parcels; the construction, reconstruction, structural alteration, relocation, or enlargement of any building or structure”
    • Required — Land development inside Bellows Falls village subject to the Rockingham zoning bylaws.
      “No land development may be commenced within the area affected by the bylaws without a permit issued by the administrative officer. No permit may be issued by the administrative officer except in conformance with the bylaws.”
    • Required — Construction, reconstruction, structural alteration, relocation, enlargement, and other defined land development inside Bellows Falls village limits.
      “The Zoning Department permits all development occurring in the Town of Rockingham.”
  • Local zoningPresent (with conditions)

    Land inside Bellows Falls village limits.

    • The current bylaws identify nine Bellows Falls zoning districts.
    “The Bylaws divide the town of Rockingham into ten zoning districts and the village of Bellows Falls into nine zoning districts, which include rural residential, agricultural, commercial and industrial, conservation and recreation, designated downtown, watershed, and historical districts.”
    3 more reviewed findings on this topic
    • Present (with conditions) — Land inside Bellows Falls village limits; Rockingham's zoning bylaws apply to the village.
      “The Bylaws divide the town of Rockingham into ten zoning districts and the village of Bellows Falls into nine zoning districts”
    • Present — Land inside Bellows Falls village limits; Rockingham's zoning bylaws expressly divide Bellows Falls village into nine zoning districts.
      “The Bylaws divide the town of Rockingham into ten zoning districts and the village of Bellows Falls into nine zoning districts, which include rural residential, agricultural, commercial and industrial, conservation and recreation, designated downtown, watershed, and historical districts.”
    • Present — Land inside Bellows Falls village; the Rockingham zoning bylaw applies to nine Bellows Falls zoning districts.
      “The Bylaws divide the town of Rockingham into ten zoning districts and the village of Bellows Falls into nine zoning districts”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Bellows Falls village limits.

    • District boundaries are established by the attached zoning maps, as amended.

    number of listed Bellows Falls districts: 9

    “BELLOWS FALLS ZONING DISTRICTS 1. Residential 7 (R-7) 2. Residential 14 (R-14) 3. Roadside Business 14 (RB-14) 4. Central Business (CB) 5. Central Business Expansion 14 (CBE-14) 6. Island (ISLD) 7. Bellows Falls Watershed District (WD) 8. Downtown Design Review District (DDRD) 9. Riverfront (RF)”
    2 more reviewed findings on this topic
    • Published — Bellows Falls village zoning districts.
      “the village of Bellows Falls into nine zoning districts, which include rural residential, agricultural, commercial and industrial, conservation and recreation, designated downtown, watershed, and historical districts.”
    • Published — Bellows Falls village zoning map and districts.
      “The Bylaws divide the town of Rockingham into ten zoning districts and the village of Bellows Falls into nine zoning districts”
  • Living in an RVTemporary only (with conditions)

    Recreational-vehicle human occupancy on a lot inside Bellows Falls village limits.

    • Occupancy beyond 90 days in a 12-month period is allowed only if the Town of Rockingham Health Regulation requirements for a full-size disposal field are met.

    maximum occupancy without full-size disposal-field compliance: <= 90 days within a 12 month period (Does not apply in a campground.)

    “No tent, yurt, cabin, trailer, shelter, houseboat, recreational vehicle, or other accommodation used for human occupancy shall be occupied on any lot, other than in a campground, for more than ninety (90) days within a twelve month period unless the Town of Rockingham Health Regulation requirements for a full size disposal field are complied with.”
  • Camping on your landLimited

    Tent, yurt, cabin, trailer, shelter, houseboat, or other human occupancy on a lot inside Bellows Falls village limits.

    • The stated limit excludes a campground.
    • Longer occupancy requires compliance with the Town of Rockingham Health Regulation requirements for a full-size disposal field.

    maximum occupancy without full-size disposal-field compliance: <= 90 days within a 12 month period (Does not apply in a campground.)

    “No tent, yurt, cabin, trailer, shelter, houseboat, recreational vehicle, or other accommodation used for human occupancy shall be occupied on any lot, other than in a campground, for more than ninety (90) days within a twelve month period unless the Town of Rockingham Health Regulation requirements for a full size disposal field are complied with.”
  • Manufactured homesLimited

    Mobile or manufactured homes inside Bellows Falls village under the Rockingham zoning regulation.

    • Mobile homes may be installed only where single-family dwellings are permitted or in an approved mobile-home park.
    • A mobile home so located must be connected to water and sewer facilities.
    • Mobile-home parks require Development Review Board site-plan approval and an administrative-officer permit.
    • Vermont Health Department, environmental-control, and environmental-protection approvals must be secured for mobile-home parks.
    “Mobile homes may be installed only: where single family dwellings are permitted, or in an approved mobile home park. Any mobile home so located shall be connected to water and sewer facilities.”
    One more reviewed finding on this topic
    • Limited — Mobile-home installation and occupancy inside Bellows Falls village limits.
      “Mobile homes may be installed only: where single family dwellings are permitted, or in an approved mobile home park. Any mobile home so located shall be connected to water and sewer facilities.”
  • Accessory dwellingsAllowed (with conditions)

    One accessory dwelling unit concurrent with a single-family use inside Bellows Falls village limits.

    • The property must have sufficient wastewater capacity shown by any required municipal water-and-sewer allocations or state water-and-wastewater permit.
    • The unit is limited to 30 percent of the pre-existing single-family dwelling's habitable floor area or 900 square feet, whichever is greater.
    • Applicable single-family setback, coverage, and parking requirements must be met.

    maximum accessory dwelling unit area: <= 30 percent of pre-existing single-family dwelling habitable floor area (May instead be 900 square feet, whichever is greater.) · maximum accessory dwelling unit area alternative: 900 square feet (Whichever is greater than 30 percent of the pre-existing dwelling's habitable floor area.)

    “The property has sufficient wastewater capacity, as demonstrated by any required, relevant permits (i.e., municipal water and sewer allocations, or a state water and wastewater permit).”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Accessory dwelling units inside Bellows Falls village under the Rockingham zoning regulation.
      “Per the requirements of 24 V.S.A. § 4412(1)(E), these regulations shall not have the effect of excluding as a permitted, concurrent with the single-family use of a lot, use one Accessory Dwelling Unit that is located within or appurtenant to an owner-occupied a single-family dwelling.”
  • Off-grid sanitationLimited

    Off-grid sanitation supporting a dwelling or building inside Bellows Falls village limits.

    • A state Wastewater System and Potable Water Supply Permit must be issued before occupancy.
    “A dwelling or any building shall not be occupied until a Wastewater System and Potable Water Supply Permit has been issued by the State of Vermont.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Mobile homes installed inside Bellows Falls village where single-family dwellings are permitted or in an approved mobile home park.

    • The bylaw states that any mobile home so located must be connected to water and sewer facilities.
    “Mobile homes may be installed only: where single family dwellings are permitted, or in an approved mobile home park. Any mobile home so located shall be connected to water and sewer facilities.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Bellows Falls village limits.

    • A zoning permit for a division into two or more parcels cannot issue until the Development Review Board approves the subdivision plat.
    • The Development Review Board acts under the Town of Rockingham Subdivision Regulations.
    “No Zoning Permit for the division of land into two (2) or more parcels shall be issued by the Administrative Officer until the subdivision plat has been approved by the Development Review Board.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Division of land into two or more parcels inside Bellows Falls village limits.
      “Commercial development, large scale residential development, and land subdivision are handled by citizen planners serving on the Development Review Board.”
    • Regulated (with conditions) — Subdivision and land division inside Bellows Falls village under Rockingham's subdivision regulations.
      “Commercial development, large scale residential development, and land subdivision are handled by citizen planners serving on the Development Review Board.”
  • Driveway accessRequired

    Land development inside Bellows Falls village lacking frontage on a public road or public waters.

    • A permanent easement or right-of-way approved by the Development Review Board may provide access.
    • Vehicular-access rights-of-way generally must be at least 50 feet wide.
    • An existing pre-regulation right-of-way may be less than 50 feet; a right-of-way serving no more than one lot of no more than one acre may be reduced to 20 feet if the DRB makes the required findings.
    • Development involving three or more lots requires a 50-foot right-of-way outside the development.

    standard right-of-way width: >= 50 feet (specified existing-lot and one-lot exceptions)

    “Rights-of-way widths, or strips of land owned in fee in the case of “flag lots,” which afford the means of vehicular access shall be a minimum of 50’ wide except as provided below:”
  • Building in a floodplainRequired

    All lands inside Bellows Falls village identified as areas of special flood hazard.

    • The Town of Rockingham Flood Hazard Area Zoning Bylaw applies.
    • New construction, substantial improvement, and other development require a conditional-use permit from the Development Review Board and compliance with the flood-hazard bylaw.
    • The applicable maps are the most current FEMA/NFIP flood-insurance studies and maps.
    “All new construction, substantial improvement, and other development occurring in these areas are required to receive a conditional use permit from the Development Review Board and comply with the procedures and requirements of the Flood Hazard Bylaw regulations.”
    3 more reviewed findings on this topic
    • Required — New construction, substantial improvement, and other development in special flood hazard areas inside Bellows Falls village limits.
      “All new construction, substantial improvement, and other development occurring in these areas are required to receive a conditional use permit from the Development Review Board and comply with the procedures and requirements of the Flood Hazard Bylaw regulations.”
    • Required — Development in mapped special flood-hazard areas inside Bellows Falls village limits.
      “All new construction, substantial improvement, and other development occurring in these areas are required to receive a conditional use permit from the Development Review Board and comply with the procedures and requirements of the Flood Hazard Bylaw regulations.”
    • Required — New construction, substantial improvements, and other development in mapped special flood-hazard areas inside Bellows Falls village.
      “All new construction, substantial improvement, and other development occurring in these areas are required to receive a conditional use permit from the Development Review Board and comply with the procedures and requirements of the Flood Hazard Bylaw regulations.”
  • Permit feesPublished (with conditions)

    Zoning and development permit submissions inside Bellows Falls village limits.

    • Fees are required upon submission.
    • Payment may be made through the Town of Rockingham online payment portal using the property parcel number, by mailed check with a hard-copy application, or in person at the Rockingham Town Hall Offices.
    • The page does not state the fee amounts.
    “Fees are required upon submission of your application”
    One more reviewed finding on this topic
    • Variable (with conditions) — Zoning permit applications inside Bellows Falls village limits.
      “Applications shall be on forms provided by the Town and shall be accompanied by such other information as deemed necessary by the Administrative Officer; including an application fee as recommended by the Planning Commission and established by the Selectboard.”
  • Permit processPublished (with conditions)

    Zoning-permit process for land inside Bellows Falls village limits.

    • Applications must be complete and on Town forms.
    • The administrative officer must approve or disapprove within 30 days of acceptance.
    • A permit does not take effect for 15 days after issuance, or until final adjudication if appealed.

    administrative decision deadline: <= 30 days after acceptance · permit effective date: >= 15 days after issuance (If appealed, effective only after final adjudication.)

    “No Zoning Permit shall take effect until fifteen (15) days have passed from date of issuance or, if an appeal is filed, not until the final adjudication of that appeal.”
    One more reviewed finding on this topic
    • Published (with conditions) — Zoning and development permit process inside Bellows Falls village limits.
      “Depending on the zoning district, property use, structure, and lot details, applications can be handled administratively or by the Development Review Board (DRB).”

Rules another office applies inside Village of Bellows Falls

Village of Bellows Falls does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Owner-builder exemptionConditional

    Qualifying owner-built residential construction inside Bellows Falls village.

    • The owner must be the builder and use the construction as the owner's dwelling.
    • The owner must direct details of construction involving noncompliant materials.
    • Before a binding sale agreement, the owner must disclose the nature and extent of noncompliance in writing and itemize the measures that do not meet the applicable standards.
    • Any required certificate must be recorded and sent to the Department of Public Service within 30 days after sale.
    “Residential construction by an owner, if all of the following apply:”
  • Building code adoptedAdopted (with conditions)

    Residential construction inside Bellows Falls village subject to Vermont Residential Building Energy Standards.

    • The statute covers one-family dwellings, two-family dwellings, and multifamily housing three stories or less.
    • Homes subject to federal manufactured-housing standards, buildings neither heated nor cooled, low-energy buildings, and qualifying owner-built residences are exempt.
    • A municipality may separately require a certificate of occupancy under 24 V.S.A. chapter 117.
    “Residential construction shall be in compliance with the standards adopted by the Commissioner of Public Service in accordance with subsection (c) of this section.”
    One more reviewed finding on this topic
    • Partial — New residential construction inside Bellows Falls village, through Vermont Residential Building Energy Standards.
      “The 2020 and 2024 RBES apply to all new residential construction, including additions, alterations, renovations, and repairs.”
  • Minimum lot sizeSpecified

    Residential 14 (R-14) district inside Bellows Falls village limits.

    • The R-14 schedule also sets a 100-foot minimum lot frontage.

    minimum lot area: >= 8712 square feet · minimum lot frontage: >= 100 feet

    “Lot Area Minimum 8,712 sq. ft. Lot Frontage Minimum 100 ft.”
    One more reviewed finding on this topic
    • Specified — Residential 7 (R-7) district inside Bellows Falls village limits.
      “Lot Area Minimum 5,000 sq. ft. Lot Frontage Minimum 50 ft.”
  • SetbacksSpecified

    Residential 7 (R-7) district inside Bellows Falls village limits.

    • Both side yards must total at least 20 feet and no individual side yard may be less than 8 feet.
    • The administrative officer may approve a varied front setback if it is consistent with the average based on the four closest abutting properties on the same side of the street.

    front yard minimum: >= 5 feet (May vary under footnote (b).) · rear yard minimum: >= 30 feet · side yard minimum: >= 20 feet (Both side yards combined; no single side yard below 8 feet.)

    “Front Yard Minimum 5 ft. (b) Rear Yard Minimum 30 ft. Side Yard Minimum 20 ft. (a)”
    One more reviewed finding on this topic
    • Specified — Residential 14 (R-14) district inside Bellows Falls village limits.
      “Front Yard Minimum 20 ft. Rear Yard Minimum 20 ft. Side Yard Minimum 30 ft.”
  • Lot coverageSpecified

    Residential 14 (R-14) district inside Bellows Falls village limits.

    maximum coverage: <= 25 percent

    “Lot Area Minimum 8,712 sq. ft. Lot Frontage Minimum 100 ft. Front Yard Minimum 20 ft. Rear Yard Minimum 20 ft. Side Yard Minimum 30 ft. Coverage Maximum 25%”
    One more reviewed finding on this topic
    • Specified — Residential 7 (R-7) district inside Bellows Falls village limits.
      “Lot Area Minimum 5,000 sq. ft. Lot Frontage Minimum 50 ft. Front Yard Minimum 5 ft. (b) Rear Yard Minimum 30 ft. Side Yard Minimum 20 ft. (a) Coverage Maximum 35%”
  • Building heightSpecified

    Residential 14 (R-14) district inside Bellows Falls village limits.

    • The stated maximum excepts agricultural buildings.

    maximum building height: <= 35 feet (Except for agricultural buildings.)

    “Building Height Maximum, except for Agricultural Buildings 35 ft.”
    One more reviewed finding on this topic
    • Specified — Residential 7 (R-7) district inside Bellows Falls village limits.
      “Building Height Maximum, except for Agricultural Buildings 35 ft.”
  • Who permits septicState (with conditions)

    Wastewater-system and potable-water-supply permitting that applies to dwellings and buildings inside Bellows Falls village limits.

    • The local zoning administrator may issue a zoning permit after receiving a state letter that it received the application; occupancy must wait for the State permit.
    “A dwelling or any building shall not be occupied until a Wastewater System and Potable Water Supply Permit has been issued by the State of Vermont.”
    One more reviewed finding on this topic
    • State — Wastewater and onsite sewage permitting inside Bellows Falls village.
      “A dwelling or any building shall not be occupied until a Wastewater System and Potable Water Supply Permit has been issued by the State of Vermont.”
  • Septic permitRequired

    New onsite wastewater systems and qualifying wastewater-related construction inside Bellows Falls village.

    • A permit is required for new construction.
    • Permits may also be required for system modifications, new connections, additions that increase water use, changes of use, and qualifying subdivisions.
    • Minor repairs and replacement of septic tanks or pipes may be exempt, but work on a leachfield requires contacting the Division.
    “Building a new water supply or wastewater system: A permit is required for new construction. Modifying or replacing an existing system: If you update an existing water or wastewater system, you will need a permit.”
    One more reviewed finding on this topic
    • Required — Occupancy of a dwelling or building inside Bellows Falls village limits where the local bylaw requires the state wastewater and potable-water permit.
      “A dwelling or any building shall not be occupied until a Wastewater System and Potable Water Supply Permit has been issued by the State of Vermont.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Bellows Falls or Windham County directly.

  • Inspections — Building inspections for construction inside Bellows Falls village.
  • Certificate of occupancy — Certificate of occupancy or equivalent for buildings inside Bellows Falls village.
  • Minimum dwelling size — Single-family dwellings in Bellows Falls village residential districts.
  • Tiny homes — Tiny-home occupancy inside Bellows Falls village.
  • Septic inspection — Inspection requirements for onsite wastewater systems inside Bellows Falls village.
3 more unanswered
  • Well permit
  • Agricultural exemption
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Bellows Falls publishes no rule on the point, not that none exists. Windham County’s page lists the county offices to call.

← All of Windham County: county rules, score and offices