Bedford County, Virginia requires a building permit before most construction, additions or system replacements under the Virginia Uniform Statewide Building Code1. The county also enforces zoning, so a project exempt from a building permit may still need zoning approval2. Septic and private-well permits go through the Central Virginia Health District's Bedford Environmental Health office34.
At a glance
- Building permit
- Required for most new construction, additions and system work under the Virginia building code1
- Zoning
- County zoning applies in unincorporated Bedford County; confirm the parcel's district before designing25
- Septic permits
- Issued by the Central Virginia Health District, which also inspects finished systems36
- Owner-builder exemption
- Available for contractor licensing, including one owner-occupied primary residence per 24 months; building permits still apply7
- Private well
- Construction permit required after an approved sanitary survey; application fee is $3004
- Second dwelling on one lot
- Only one single-family dwelling per parcel unless you subdivide or qualify for an accessory apartment or accessory manufactured home8
- Small accessory buildings
- Storage/utility buildings under 256 square feet skip the building permit but still need a zoning permit910
- FEMA flood maps
- Being updated countywide, with new maps expected roughly six months after FEMA's 2027 final determination11
Who to call
Building permits
Bedford County Community Development – Building Inspections
Building permits, plan review and inspections for construction in Bedford County
122 East Main St., Suite G-03, Bedford, VA 24523
Zoning
Bedford County Community Development – Planning & Zoning
Zoning permits, site plans, subdivisions and zoning-district determinations for Bedford County
122 E. Main Street, Suite G-03, Bedford, VA 24523
Zoning
Bedford County Community Development – Planning & Zoning FAQs
Answers on subdivisions, second dwellings, permit expiration and other zoning questions for Bedford County
122 E. Main Street, Suite G-03, Bedford, VA 24523
Building permits
Bedford County Community Development – Residential Projects FAQ
Residential permit and accessory-structure guidance for Bedford County
122 East Main Street, Bedford, VA 24523
Septic permits
Central Virginia Health District – Bedford Environmental Health
Septic (onsite sewage) and well construction permits for Bedford County
600 Bedford Ave., Bedford, VA 24523
Floodplain permits
Bedford County Community Development – FEMA Floodplain Map Update Contact
FEMA flood map update questions and floodplain permit appeals for Bedford County
122 East Main St., Bedford, VA 24523
Contact details are copied from each office’s official page and were checked against it on September 29, 2026.
Do you need a building permit in Bedford County, Virginia?
Unincorporated Bedford County, Virginia requires a building permit before starting work that is not exempt from the Virginia Uniform Statewide Building Code1. Bedford County's Building Inspections office lists new construction, additions, decks, retaining walls over 3 feet, new gas or electrical systems, and storage or utility buildings over 256 square feet as work that needs a permit9. Fences, playground equipment, in-kind replacement of siding, windows or roofing on a single-family home, and detached accessory structures under 256 square feet used for storage are exempt from a building permit9. A qualifying owner-builder may use Virginia's contractor-licensing exemption for no more than one primary residence owned and occupied by that person in a 24-month period, but the exemption does not waive Bedford County's building permit or its prerequisites7. Virginia also exempts qualifying nonresidential farm buildings from the building code, although floodplain requirements can still apply12.
Who is the Bedford County building department, and how do you reach them?
Bedford County Community Development's Building Inspections division reviews and issues building permits and performs inspections, and can be reached at (540) 586-7616 at 122 East Main St., Suite G-03, Bedford, Virginia9. Inspections are requested through a voicemail line at 540-586-7611 or the county's online Citizen Self-Service Portal, not by appointment9. A building permit application must be made to the building official and approved, with fees paid, before covered work begins; applications can be mailed in and an applicant cannot be required to appear in person13. Once issued, a Bedford County permit stays valid for six months from issuance or from your last inspection, whichever is later, and it expires if you do not start work or if work stops for six months, though an extension can be requested from the zoning administrator and building official before that deadline8. If your site is not clearly marked with the posted permit when an inspector arrives, Bedford County charges a $25 reinspection fee under county code9. A final inspection and certificate of occupancy are required before you can legally occupy what you built, and Virginia law gives the building official up to five working days after that inspection to issue it14.
Does Bedford County have zoning?
Yes: Bedford County administers zoning in the county's unincorporated territory through its Planning & Zoning division25. Even projects that don't need a building permit can still need a zoning permit; Bedford County requires one for a structure or use under 256 square feet that a building permit doesn't cover, while patios at grade, driveways, sidewalks, and fences are exempt from that zoning permit10. Bedford County allows only one single-family dwelling per parcel regardless of zoning district or lot size, so a second house generally requires subdivision or qualification as a specific accessory use8. An accessory manufactured home for a landowner's direct family member is limited to the AP, AR, and AV districts8. Setbacks, minimum dwelling size and other parcel-specific dimensional rules could not be confirmed from the available material; ask Planning & Zoning for the district and applicable standards before designing.
How do septic permits work in Bedford County?
The Central Virginia Health District's Bedford Environmental Health office, not the county building department, issues onsite sewage permits for Bedford County3. Virginia requires a written construction permit before a sewage disposal system is built, expanded or modified15. The district also inspects finished sewage disposal systems6. Bedford Environmental Health can be reached at (540) 586-7952 or [email protected] at 600 Bedford Ave.16. Only about 15.2% of Bedford County's soils rate free of severe limits for a conventional drain field, so treat a site evaluation as an early feasibility check rather than assuming a standard system will fit17. Private wells use the same health office, but have their own process: submit an application and fee, obtain approval of the sanitary survey, receive the construction permit, and have the completed well inspected for use; the listed application fee is $3004.
Can you live in an RV or tiny home on your land in Bedford County?
Bedford County's public building and zoning FAQs do not spell out a general rule for living in an RV or tiny home on your own land, so this is one to confirm directly with Planning & Zoning before you buy a camper or a tiny house8. What is confirmed is that Bedford County allows only one single-family dwelling per parcel, so parking a second permanent living unit next to your house is treated the same as adding a dwelling and is not allowed without subdividing or qualifying for a specific accessory use8. Virginia's temporary-camping rules cover campgrounds, not living on your own residential lot: a campground permit allows temporary camping of no more than 14 days in any 60-day period, which answers the campground question, not whether you can live in an RV on your own residential lot while you build18. Manufactured homes are a separate category: Virginia requires that where site-built housing is allowed, a placed manufactured home be converted to real property, be on its own lot, and (outside farm-use districts) have its certificate of occupancy issued within five years of its data-plate manufacture date, standards Bedford County's zoning ordinance administers locally19.
Building a home in Bedford County: the steps, in order
- Confirm your parcel's zoning district and setbacks with Bedford County Planning & Zoning at (540) 586-7616 before you design anything10.
- If the site needs septic, apply through Central Virginia Health District's Bedford Environmental Health office and leave the finished system available for inspection36. If the site needs a private well, submit the application and fee before the sanitary survey; the construction permit follows survey approval4.
- If you will act as the owner-builder, determine whether you qualify for the contractor-licensing exemption and provide the required affidavit or proof; the building permit still applies7.
- Apply for the building permit through Bedford County Community Development and pay the locally set fees before work begins920.
- Obtain a VDOT entrance permit before building an entrance to a state-maintained highway21.
- Request inspections at each stage through the voicemail line or online portal, keep the permit posted, and obtain the certificate of occupancy before moving in914.
What to check before you buy land in Bedford County
Check septic feasibility before committing to a lot: only about 15.2% of Bedford County's soils rate free of severe limits for a conventional drain field17. For a private well, budget the $300 application fee and confirm that the sanitary survey can be approved before construction4. Ask Bedford County Community Development whether the parcel is affected by FEMA's flood map update: preliminary maps show 352 buildings newly mapped into flood zones and 494 mapped out, with letters scheduled for fall 2026 and FEMA's final determination scheduled for summer 202711. Confirm the zoning district, allowed use, setbacks and whether a proposed additional dwelling qualifies, because Bedford County generally allows only one single-family dwelling per parcel108. Bedford County's typical property tax bill is about $1,265 a year at an effective rate near 0.5% of value2223. For frontage on a state-maintained road, confirm that an existing entrance is permitted or that a VDOT entrance permit is obtainable21.
Watch-outs
- Bedford County's flood insurance rate maps are being updated by FEMA, with letters to affected property owners going out in fall 2026 and new maps expected to take effect roughly six months after FEMA's summer 2027 final determination; call Community Development at (540) 587-0758 if your parcel may be affected11.
- Virginia's owner-builder exemption concerns contractor licensing, not the Bedford County building permit; qualifying applicants must still meet permit prerequisites and provide the required affidavit or proof7.
- Whether you can live in an RV or tiny home on your own land long-term is not answered on Bedford County's public zoning FAQs; confirm with Planning & Zoning before buying a camper or tiny house to live in while you build8.
Sources
- Bedford County Community Development – Do I Need a Permit (2026 county census)
- Bedford County Code of Ordinances (Municode) – Zoning (2026 county census)
- Onsite Sewage & Water Program - Central Virginia, quoted and re-checked
- Private Well Program, quoted and re-checked
- § 15.2-2280. Zoning ordinances generally (Virginia statewide rule), quoted and re-checked
- Onsite Sewage & Water Program - Central Virginia, quoted and re-checked
- Owner/Builder Affidavit, quoted and re-checked
- Bedford County Community Development – Planning & Zoning FAQs (bedfordcountyva.gov)
- Bedford County Community Development – Building Inspections (bedfordcountyva.gov)
- Bedford County Community Development – Planning & Zoning (bedfordcountyva.gov)
- Bedford County Community Development – FEMA Floodplain Map Update Contact (bedfordcountyva.gov)
- Code of Virginia § 36-99. Provisions of Code; modifications (Virginia statewide rule), quoted and re-checked
- 13VAC5-63-80. Section 108 Application for permit (Virginia statewide rule), quoted and re-checked
- 13VAC5-63-160. Section 116 Certificates of occupancy (Virginia statewide rule), quoted and re-checked
- 12VAC5-610-240. Permits; general (Virginia statewide rule), quoted and re-checked
- Central Virginia Health District – Bedford Environmental Health (vdh.virginia.gov)
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- 12VAC5-450 Rules and Regulations Governing Campgrounds (Virginia statewide rule), quoted and re-checked
- § 15.2-2290. Uniform regulations for manufactured housing (Virginia statewide rule), quoted and re-checked
- 13VAC5-63-70. Section 107 Fees (Virginia statewide rule), quoted and re-checked
- Land use permits (Virginia statewide rule), quoted and re-checked
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.