Town of Levan, Utah requires a building permit before construction and other regulated building work begins; applications go to the town office.12 Levan handles town land-use review, while septic permits in Juab County come from Central Utah Public Health Department.23 Confirm the parcel’s zoning and wastewater plan before committing to a home design.45
At a glance
- Building permit
- Required before regulated construction, alterations and building-system work1
- Building inspections
- Arrange project-specific inspections with the town building inspector6
- Zoning approval
- Town Planning Commission reviews zoning and land-use applications2
- Septic authority
- Central Utah Public Health Department3
- Septic permit fees
- $600 conventional; $900 alternative; $200 repair/replacement5
- Flood-hazard construction
- Flood-resistant design and protection of utilities and wastewater systems required where applicable7
Who to call
Building permits
Levan Town Office and Building Inspector
Town building applications and inspection questions
20 North Main PO Box 40 Levan, UT 84639
Planning & zoning
Levan Town Clerk / Planning Commission
Town zoning-map and land-use review questions
Septic permits
Central Utah Public Health Department – Nephi Office
Onsite wastewater applications and environmental-health questions
160 North Main Nephi, UT
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Town of Levan means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Town of Levan, UT?
Levan requires a building permit before constructing, enlarging, altering, repairing, moving or demolishing a building, changing occupancy, or doing regulated electrical, gas, mechanical or plumbing work.1 Levan adopts the current state-adopted building codes, including residential and manufactured-housing standards.8 A submitted application becomes a valid building permit only after the required checklist materials reach the town office, the project is approved and the building permit fees are paid.2 Ask the town office which checklist applies to your proposed home, addition or remodel.2
Who issues building permits in Town of Levan?
Submit Levan building applications to the town office, which tells applicants whether Planning Commission review is needed.2 Reach Levan Town Hall at (435) 623-1959; the official building-inspector page also lists a direct inspector contact.9 During construction, the applicant is responsible for obtaining the building inspector’s sign-offs on the inspection record supplied with the approved building permit.6 Ask the inspector which inspections your project requires before scheduling work that will conceal foundations, wiring or other building components.6
How does Town of Levan handle zoning and lot standards?
Levan’s Planning Commission reviews zoning, site-plan, subdivision and conditional-use applications, with legislative-body approval when required.2 The town clerk keeps Levan’s zoning map, making the town the starting point for identifying the district covering a parcel.4 Ask the town clerk and Planning Commission for the current district rules, minimum lot area, frontage and setbacks before ordering plans.4 We could not confirm current parcel-specific dimensional requirements here; request the applicable district standards rather than using acreage requirements from land outside town.4
How do septic permits work inside Town of Levan?
Central Utah Public Health Department is the onsite wastewater authority serving Juab County, including the county’s septic-system permit process.3 For a Levan septic project, construction cannot begin until the health department issues the septic construction permit.5 The application requires soil classification, a site plan and system design; alternative systems also need an operation and maintenance plan or contract.5 The published fees are $600 for conventional systems, $900 for alternative systems and $200 for repair or replacement.5 Arrange inspection before backfilling.10 Contact the Nephi health office at (435) 623-0696 for wastewater questions.11
Can you live in an RV or tiny home in Town of Levan?
We could not confirm permission for residential RV occupancy, temporary camping or tiny-home occupancy on an individual Levan parcel; ask the town Planning Commission about the proposed use and zoning district.4 A building permit application does not replace the town’s land-use review: Levan reviews zoning, site plans and conditional uses through its Planning Commission.2 Describe the intended dwelling, whether it will remain on wheels, its utilities and the proposed duration of occupancy when requesting a town determination.4 For wastewater disposal, take the same proposal to Central Utah Public Health’s Nephi office.311
Building a home in Town of Levan: what are the steps?
- Ask the town clerk to identify the parcel’s zoning district and request the Planning Commission review needed for your proposed use or site plan.42
- Resolve the wastewater design with Central Utah Public Health and obtain the septic construction permit before installing any part of an onsite system.5
- Submit Levan’s required building checklist materials, obtain project approval and pay building permit fees before starting regulated building work.21
- Arrange the town building inspections and septic inspection before backfilling.610
For a flood-hazard site, Levan requires construction and utilities designed to resist flood damage, and wastewater systems must avoid flood impairment or contamination.7
What should you check before buying land in Town of Levan?
For land outside town limits, use the Juab County guide for county-administered building and zoning requirements; Levan’s building applications go to the town office.122 For land inside Levan, request the town zoning map and confirm the proposed use with the town before relying on a rural address.4 Utah requires public-sewer connection when available and practicable, otherwise an adequate onsite or other acceptable wastewater system.13 We could not confirm Levan’s private-well or off-grid sanitation permissions; ask the town about utilities and Central Utah Public Health about sanitation.911
Watch-outs
- Levan building permits and septic construction permits are separate approvals from the town and Central Utah Public Health respectively.25
- We could not confirm Levan’s general certificate-of-occupancy requirements; ask the town building inspector what approval is needed before moving in.9
- Levan flood-hazard requirements extend to onsite waste systems as well as buildings and utilities.7
Sources
- Levan Town building permit packet (Town of Levan), quoted and re-checked
- Levan Town building permit packet (Town of Levan), quoted and re-checked
- Local Health Departments and District Engineers, quoted and re-checked
- Levan Town Clerk / Planning Commission (s3-us-west-2.amazonaws.com)
- Onsite Wastewater Permit Instructions, quoted and re-checked
- Levan Town Municipal Code adopting ordinance and code (Town of Levan), quoted and re-checked
- Levan Town Municipal Code adopting ordinance and code (Town of Levan), quoted and re-checked
- Levan Town Municipal Code adopting ordinance and code (Town of Levan), quoted and re-checked
- Levan Town Office and Building Inspector (levantown.org)
- Waste Water System Permit Application, quoted and re-checked
- Central Utah Public Health Department – Nephi Office (centralutahhealth.gov)
- Planning and Zoning – JuabCounty.Gov, quoted and re-checked
- DAR File No. 37575, Rule R317-4, Onsite Wastewater Systems (Utah statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.