The Town of Boulder, Utah has its own zoning, and a new building needs Town project approval first12. The building permit itself comes from the Garfield County Building Department3. Septic permits for Garfield County come from the Southwest Utah Public Health Department4. RV living on a lot is limited to 90 days a year with a Town Clerk permit5.
At a glance
- Zoning
- Yes, Boulder Town zoning districts and a Table of Uses16
- Building permit
- Required: Town project approval, then a Garfield County permit32
- Building code
- Utah's state construction codes, enforced by Garfield County7
- Septic
- Permit and approved design from Southwest Utah Public Health Department4
- RV living
- Temporary only, up to 90 days a year, Town Clerk permit5
- Wells
- Utah Division of Water Rights approval needed with the Town application8
- Short-term rental
- Conditional use permit in residential districts9
Who to call
Planning & zoning
Boulder Town Office (Town Clerk)
Town project approval and zoning compliance for building in Boulder; RV occupancy permits
351 No 100 East
Building permits
Garfield County Building Department
Issues the building permit, reviews plans and inspects construction, including inside Boulder
55 South Main St., Panguitch, UT 84759
Septic permits
Southwest Utah Public Health Department – Garfield County Office
Septic plan review, permits and inspections for Garfield County
601 East Center, Panguitch, UT 84759
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Town of Boulder means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Boulder, Utah have zoning, and what does it mean for RVs and tiny homes?
Yes. The Town of Boulder zones land inside Town limits, and uses are governed by the zoning district and the Town's Table of Uses1. The Table of Uses has columns for the GM, LDR, MDR, HDR and C districts6. Setbacks and building height are set by district, and the Zoning Administrator checks them before a project moves forward1011. Pick the district for your lot before you design anything.
RV living is allowed only temporarily: no more than 90 days a year, by the owner, family or guests, non-commercial, with a Town Clerk permit that carries no fee5. Residential short-term rentals in the GM, LDR, MDR and HDR districts need a conditional use permit9. We could not confirm a Boulder rule that specifically covers tiny homes, so ask the Town Office before buying for that purpose.
Do you need a building permit in Boulder, Utah, and who issues it?
Yes, for buildings that are not exempt. Boulder requires Town project approval before construction, and then a building permit from the Garfield County Building Department3. Boulder has adopted the construction codes Utah has adopted, and Garfield County enforces them7. Project approval comes from the Town Clerk after the project passes zoning compliance2.
Agricultural buildings can be exempt if they need no permanent electrical, plumbing, septic or mechanical systems; the exemption does not cover a dwelling12. The Garfield County Building Department issues residential and commercial building permits and takes applications through City Inspect13. We could not find a Boulder rule on owner-builders, so ask the county department about its owner-builder certification before you start.
How do septic permits work in Boulder, Utah?
The Town does not issue septic permits. The Southwest Utah Public Health Department reviews plans, issues permits and inspects septic systems in its district, which covers Garfield County14. A permit and approved design are required before installing, replacing or modifying a system, and soil and percolation testing must be done by a Utah-certified onsite professional first4. The final inspection happens before backfilling15.
For an external accessory dwelling unit, Boulder requires adequate on-site wastewater disposal, or an upgrade, before it issues a certificate of occupancy16. We could not confirm the full Boulder-specific septic procedure, so call the health department's Garfield County office early17.
Do you need a well permit in Boulder, Utah?
Yes. A Town project application that proposes a well must include approval from the Utah Division of Water Rights8. Under state rules a valid water right comes first, and the Start Card issued when the water right is approved is essentially the permit to construct the well18. Wells must be built by a licensed well driller or a licensed shallow water well constructor19. Confirm the water right before you pay for land that depends on a well.
Building a home in Boulder: the steps, in order
- Identify your lot's zoning district and check the Table of Uses6.
- Get septic soil and percolation testing and an approved design from the health department4.
- If you plan a well, get Division of Water Rights approval to attach to your application8.
- Submit a Town project application; the Town Clerk issues project approval after zoning compliance2.
- Apply to the Garfield County Building Department for the building permit3.
- Schedule county inspections; the county does not perform a final inspection on an occupied building20.
What stays with Garfield County, and what to check before you buy in Boulder
The Town of Boulder handles zoning and project approval, while building permits, plan review and inspections sit with the Garfield County Building Department313. Septic permits and inspections sit with the Southwest Utah Public Health Department4. Land outside Town limits follows the county's rules instead; see the Garfield County page.
Before buying, confirm the zoning district, the water source, and the septic soils. About 14.1% of Garfield County soils are rated not limited for a conventional drain field, so plan for a site evaluation or an engineered system21. Garfield County's effective property tax rate is 0.4%22.
Watch-outs
- Town project approval comes before the county building permit, so a county application alone will not start construction in Boulder2.
- Do not use Garfield County's unincorporated-area RV, lot-size or setback rules for a lot inside Boulder; the Town sets its own zoning1.
- We could not confirm Boulder's lot-size minimums, floodplain rules, driveway access rules or tiny-home treatment; ask the Town Office before you close23.
Sources
- Boulder Town Code § 153.117, Table of Uses (Town of Boulder), quoted and re-checked
- Boulder Town Code § 151.02, Project Approval Required (Town of Boulder), quoted and re-checked
- Boulder Town Code § 151.05, Building Permits Required (Town of Boulder), quoted and re-checked
- Septic Systems - Southwest Utah Public Health Department, quoted and re-checked
- Boulder Town Code § 153.201, Recreational Type Vehicle as a Temporary Dwelling (Town of Boulder), quoted and re-checked
- Boulder Town Code § 153.117, Table of Uses (Town of Boulder), quoted and re-checked
- Boulder Town Code § 151.10, Adoption of Codes (Town of Boulder), quoted and re-checked
- Boulder Town Code § 151.02, Project Approval Required (Town of Boulder), quoted and re-checked
- Boulder Town Code § 153.117, Table of Uses (Town of Boulder), quoted and re-checked
- Boulder Town Code § 153.137, Review and Approval Procedures (Town of Boulder), quoted and re-checked
- Boulder Town Code § 153.137, Review and Approval Procedures (Town of Boulder), quoted and re-checked
- Boulder Town Code § 151.04, Exemptions From Building Permits (Town of Boulder), quoted and re-checked
- Garfield County Building Department (garfield.utah.gov)
- Southwest Utah Public Health Department - Home, quoted and re-checked
- Septic System Checklist - Southwest Utah Public Health Department, quoted and re-checked
- Boulder Town Code § 153.203, Accessory Dwelling Units (Town of Boulder), quoted and re-checked
- Southwest Utah Public Health Department – Garfield County Office (swuhealth.gov)
- Water Well Drilling, quoted and re-checked
- Water Well Drilling Information, quoted and re-checked
- Inspection Information and Schedule, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Boulder Town Office (Town Clerk) (boulder.utah.gov)
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.