Wellsville, Utah (Cache County) requires a permit before any construction, alteration or occupancy of a structure inside city limits1. The city adopts its own building codes and sets its own residential zoning, including a 12,000-square-foot single-family district23. Septic permits come from the Bear River Health Department, not the city4.
At a glance
- Building permit
- Required inside Wellsville city limits before work starts1
- Building codes
- State-established codes adopted by the city, subject to its local chapter2
- Zoning
- City residential districts RCA, RAC-5, ROS 1, ROS 1/2 and RSF5
- RSF minimum lot
- 12,000 sq ft for a single-family dwelling3
- RSF setbacks
- Front 30 ft, side 10 ft, rear 30 ft6
- Septic
- Bear River Health Department permit where sewer is not available4
- Subdivision
- City Council-approved plat required7
Who to call
Building permits
City hall for Wellsville: the place to ask about building permits, zoning and planning inside city limits
75 East Main P.O. Box 6 Wellsville, Utah 84339
Septic permits
Bear River Health Department, Environmental Health (Logan)
Septic (onsite wastewater) permits for Cache County
85 East 1800 North, Logan, UT 84341
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Wellsville means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Wellsville, Utah?
Yes. Wellsville's city code says construction, alteration, repair, removal, use or occupancy of any structure inside the city cannot start until the appropriate permit is issued1. The city adopts the state-established building, plumbing, electrical, mechanical and energy codes, subject to its own local chapter2.
Complete applications go to city staff before they reach a public meeting agenda, and some site plans also need City Manager review8. Accessory dwelling unit work must be inspected before approval9. The city's published ADU fee schedule lists a $75 landlord-license application fee, plus building permit fees and impact fees where established10.
We did not confirm whether Wellsville has a general owner-builder rule or a certificate-of-occupancy rule, so ask the city office before you pull plans together11.
Who issues building permits in Wellsville, and how do you reach them?
Inside Wellsville, the city issues building permits under its own code1. The Cache County Building Department serves unincorporated Cache County, so a lot inside Wellsville city limits does not start at the county counter; the county's rules cover land outside city limits12.
Wellsville City Offices are at 75 East Main, with phone 435-245-368611. Call the city office to find out who takes applications and which forms apply to your project.
Does Wellsville have zoning, and what does it mean for lot size and setbacks?
Yes. Wellsville publishes residential standards for five districts: RCA, RAC-5, ROS 1, ROS 1/2 and RSF5. Rules differ by district, so look up your parcel's zone before you plan anything.
In the RSF (12,000-square-foot) district, a single-family dwelling needs at least 12,000 square feet after open space and critical land are set aside3. Setbacks for primary uses in RSF are 30 feet in front, 10 feet on the side and 30 feet in the rear, with porches, decks and overhangs at 5 feet on the side6. Property along Highway 89/91 carries a 150-foot setback6.
RSF buildings may cover at most 35 percent of the lot13. Principal structures top out at 35 feet, and RSF accessory structures at 25 feet14.
How do septic permits work in Wellsville?
Septic permits in Cache County come from the Bear River Health Department, not from the city. The department requires a septic permit before constructing, altering or repairing a septic system on a property where sewer lines are not available4. The system must meet design and location standards based on soil conditions, the site plan and percolation tests15.
Listed fees include $200 per lot for a site evaluation, $840 for a conventional septic system permit and $350 for an alteration permit15. Soils matter: only about 0.6 percent of Cache County soils rate "not limited" for a conventional drain field, so expect a site evaluation and possibly an engineered system16.
We could not confirm Wellsville's own rules on private wastewater systems or sewer connection. Ask the city office whether your lot can connect to city sewer, and the Bear River Health Department about everything else1117.
Can you live in an RV or tiny home in Wellsville?
We could not confirm Wellsville's rules on living in an RV or tiny home on private land, and the city's published residential standards do not settle it. Utah's statewide RV-park rule covers RV parks, not a single lot, so it does not answer the question for your parcel18.
What the city's code does say: accessory dwelling units may not be mobile homes, and short-term use of ADUs is prohibited9. For anything else, call the city office before you buy or park anything11.
Building a home in Wellsville: the steps, in order
- Confirm your parcel's zoning district with the city and check lot size, setbacks and height for that district5.
- If you are dividing land, expect a concept plan, preliminary plat and final plat approved by the City Council before recording with the county7.
- Get a Bear River Health Department septic evaluation if no sewer line reaches the lot4.
- Submit a complete building permit application to city staff8.
- Pass inspections and confirm the occupancy rules with the city before moving in11.
A driveway onto a state highway needs a UDOT conditional access permit19.
What stays with Cache County, and what to check before you buy in Wellsville
Cache County's building, zoning and ADU rules apply to unincorporated land; for land outside city limits, see the Cache County page. Septic permits stay with the Bear River Health Department for the whole county20. A private well needs a water right and a Start Card from the Utah Division of Water Rights before drilling21.
County-level figures: Cache County's effective property tax rate is 0.5 percent22, and the median bill is $1,929 a year23. Cache County has about 28.6 inches of precipitation a year24.
Watch-outs
- We could not confirm whether Wellsville has an owner-builder exemption, a certificate-of-occupancy rule, well rules or floodplain rules; ask the city office before you buy11.
- Utah's owner-builder exemption covers contractor licensing only and does not remove building permit, inspection or zoning requirements25.
- Highway 89/91 frontage in RSF carries a 150-foot setback6.
Sources
- 10-46-3: Permit Required Before Proceeding (Wellsville), quoted and re-checked
- 9-1-2: Codes Adopted (Wellsville), quoted and re-checked
- Chapter 15 Site Development Standards: Residential Districts (Wellsville), quoted and re-checked
- Environmental - Bear River Health Department, quoted and re-checked
- Chapter 15 Site Development Standards: Residential Districts (Wellsville), quoted and re-checked
- Chapter 15 Site Development Standards: Residential Districts (Wellsville), quoted and re-checked
- codelibrary.amlegal.com (Wellsville), quoted and re-checked
- 10-46-3: Permit Required Before Proceeding (Wellsville), quoted and re-checked
- 10-41-6: Accessory Dwelling Units (Wellsville), quoted and re-checked
- codelibrary.amlegal.com (Wellsville), quoted and re-checked
- Wellsville City Offices (wellsvillecity.com)
- cachecounty.gov, quoted and re-checked
- Chapter 15 Site Development Standards: Residential Districts (Wellsville), quoted and re-checked
- Chapter 15 Site Development Standards: Residential Districts (Wellsville), quoted and re-checked
- Environmental Health - Bear River Health Department, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Bear River Health Department, Environmental Health (Logan) (brhdut.gov)
- Utah Administrative Code Rule R392-301, Recreational Vehicle Parks (Utah statewide rule), quoted and re-checked
- Conditional Access Permit (Utah statewide rule), quoted and re-checked
- Environmental - Bear River Health Department, quoted and re-checked
- Water Well Drilling Information (Utah statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Annual precipitation: Bolthole Index county data
- Utah Code Title 58, Chapter 55, Construction Trades Licensing Act exemptions (Utah statewide rule), quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.