McGregor, Texas has a city building-permit application process and adopted building codes; start with Community Development for a proposed home or remodel.12 McGregor also sets zoning inside city limits.3 For property in McLennan County, the Waco-McLennan County Public Health District administers the septic program for the county’s cities.4
At a glance
- Building applications
- City application and plans required for submittal1
- Zoning
- City zoning; standards depend on the parcel’s district3
- Septic authority
- Waco-McLennan County Public Health District serves cities in McLennan County4
- Manufactured homes
- HUD-Code manufactured homes restricted to the MH district5
- Accessory dwellings
- Accessory structures cannot be separate dwellings in residential and business districts6
- Minimum home size
- R-20 single-family dwellings need at least 2,000 square feet7
Who to call
Building permits
City of McGregor Community Development and Permitting
City building applications and planning/zoning inquiries
302 S Madison St McGregor, Texas 76657
Septic permits
Waco-McLennan County Public Health District, OSSF Program
Septic applications, inspections and system questions for McLennan County and its cities
401 Franklin Avenue - Mae Jackson Development Center - 1st Floor
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in McGregor means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in McGregor, Texas?
McGregor publishes a building-permit application covering residential and commercial projects, with separate plan requirements for new houses, remodels and additions.1 McGregor has adopted the 2015 International Building Code and International Residential Code, subject to local amendments.2 Ask Community Development which building, electrical, plumbing and mechanical applications apply to the proposed work.8 We could not confirm a general McGregor owner-builder exemption or the complete inspection and certificate-of-occupancy requirements; ask city Permitting before scheduling construction or moving in.8
Who handles building applications and zoning questions in McGregor?
McGregor’s Community Development and Permitting office is the city contact for building applications and planning or zoning questions.8 Use the permitting email listed in the office contact card and ask for the current application and submission instructions.8 The published McGregor application says incomplete submissions will not be processed and requires a complete residential new-house plan set including a site plan, foundation plan and REScheck or third-party documentation.1 City building review and septic review have different contacts: the Health District administers the OSSF program for cities in McLennan County.4
Does McGregor have zoning, minimum lot sizes and setbacks?
McGregor has city zoning, so confirm the parcel’s district before choosing a house plan.3 McGregor’s R-10 district requires a minimum lot area of 10,000 square feet, while R-7.2 requires 7,200 square feet.910 The R-20 district requires a single-family dwelling floor area of at least 2,000 square feet.7 In R-6, the front setback is 25 feet and the main-building rear setback is 20 feet; the interior side yard also depends on lot width, and the street-side yard has a separate standard.11 These are district-specific examples, not citywide dimensions.3
How do septic permits work inside McGregor?
For McGregor property in McLennan County, contact the Waco-McLennan County Public Health District’s OSSF Program about septic approval; its program covers cities in the county.4 Texas generally requires a septic permit and approved plan before constructing, altering or operating an on-site sewage facility.12 The Health District says system suitability depends on soil, site features and intended use, so settle wastewater feasibility before committing to a house layout.4 McLennan County’s soil data rates only 4.4% of soils not limited for conventional drain fields; that countywide rating does not rule out septic on a particular lot, but supports getting a site evaluation.13
Can you live in an RV, tiny home or manufactured home in McGregor?
We could not confirm private-lot RV living or tiny-home occupancy in McGregor; ask Community Development about the proposed dwelling and the parcel’s zoning before buying or placing a unit.8 McGregor’s accessory-structure rule prohibits using accessory structures as dwellings in residential and business districts, so a backyard structure is not automatically a lawful separate home.6 HUD-Code manufactured homes must be in the MH district, where the minimum lot area is 7,500 square feet and minimum unit size is 1,200 square feet.5 McGregor’s overnight-camping restriction applies to city parks, with an exception for designated camping areas; it does not answer private-lot RV occupancy.14
What are the steps before building a home in McGregor?
- Ask McGregor Community Development to confirm the parcel’s zoning district and proposed use.3
- Prepare the city’s required application and residential plans, including site and foundation plans and energy-compliance documentation.1
- If the site needs septic, contact the Health District about the site evaluation, system design and septic application before installation.412
- Ask city Permitting for the required inspections and occupancy approvals; we could not confirm the complete schedule.8
For land outside McGregor city limits, use the McLennan County guide: the county’s residential-construction notice and inspection process applies to unincorporated land, rather than replacing McGregor’s city application process.151
Watch-outs
- McGregor’s MH standards apply to manufactured housing in that district; do not treat those dimensions as the rules for every residential lot.5
- We could not confirm McGregor’s floodplain-development, well-permit or general driveway requirements; ask Community Development which office must review the specific parcel.8
- The Health District’s current fee schedule lists a single-family aerobic septic permit and inspection fee of $710; confirm the full application cost with the OSSF Program.4
Sources
- Community Development: Planning, Zoning & Building Permits (McGregor), quoted and re-checked
- § 12-72 International building codes adopted; amendments (McGregor), quoted and re-checked
- Ordinance No. O-11-2023 (McGregor), quoted and re-checked
- Waco-McLennan County Public Health District, OSSF Program (waco-texas.com)
- § 3.10 MH Hud-Code Manufactured Housing (McGregor), quoted and re-checked
- § 4.6 Accessory structures and uses regulations (McGregor), quoted and re-checked
- § 3.4 R-20 Single-Family Residential (McGregor), quoted and re-checked
- City of McGregor Community Development and Permitting (cityofmcgregor.com)
- library.municode.com (McGregor), quoted and re-checked
- library.municode.com (McGregor), quoted and re-checked
- § 3.7 R-6 Single Family Residential (McGregor), quoted and re-checked
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- § 38-82 Overnight camping (McGregor), quoted and re-checked
- Residential Building Requirements, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.