Kemp, Texas issues building permits for new construction and remodeling, with a city survey to determine whether a house remodel needs a permit.1 Kemp has its own zoning; Kaufman County Development Services handles septic permitting inside Kemp, while city approval is also required for private sewage facilities.234
At a glance
- Building permits
- City-issued for new construction; submit the city survey for house remodeling1
- Zoning
- City zoning applies inside Kemp2
- Septic approval
- Kaufman County septic permitting plus city approval for private sewage facilities34
- Agricultural-district home lots
- At least 2 acres, with adequate city utilities or on-lot septic5
- Agricultural accessory buildings
- In the A Agricultural District, total building and structure area is limited to 10% of the tract6
- Owner electrical work
- State licensing exemption for an owned, occupied dwelling; local requirements can still apply7
Who to call
Building permits
City of Kemp Permitting Department
City building-permit applications and questions about zoning approval; commercial plan-submittal instructions.
304 South Main Street, Kemp, Texas 75143
Building permits
City of Kemp Building Plan Review and Inspections
City building-permit guidance, remodeling assessment, and Bureau Veritas inspection scheduling.
Septic permits
Kaufman County Development Services
County OSSF applications and septic installation or repair questions; county authority includes Kemp city limits.
101 N. Houston Street Kaufman , TX 75142
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Kemp means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Kemp, Texas?
Kemp issues building permits for new construction and remodeling of existing buildings; for a house remodel inside city limits, submit the city’s survey so the Permitting Department can assess whether a building permit is required.1 Kemp’s permitting page identifies the adopted 2015 International Building Code and Bureau Veritas as the city’s plan-review and inspection provider.1
For commercial construction, Kemp’s packet requires a completed building-permit application, a final inspection and a certificate of occupancy before the building is occupied.8910 Ask the city for the application and inspection requirements for your particular house project rather than using the commercial checklist as a residential checklist.1
Who issues building permits in Kemp, and how do you reach them?
Contact the City of Kemp Permitting Department at 903-498-3191, or visit 304 South Main Street, Kemp, Texas 75143, for city building-permit questions.8 The commercial packet directs applicants to send a digital application, site plan and relevant paperwork to [email protected].8
Kemp uses Bureau Veritas for building plan reviews and inspections, and the city directs applicants to contact that provider rather than City Hall to schedule inspections.1 The inspection phone line is 817-335-8111 and the inspection email is [email protected].1 Calling by 4:00 p.m. allows an inspection on the next business day under the city’s published instructions.1
Does Kemp have zoning, minimum lot sizes and agricultural limits?
Kemp has municipal zoning, including an A Agricultural District; the city’s zoning applies to land inside Kemp city limits.2 In Kemp’s A Agricultural District, single-family dwellings require building lots of at least 2 acres and adequate service from city utilities or a septic tank on the building lot.5
Kemp’s A Agricultural District also limits the total area of agricultural accessory buildings and structures to 10% of the gross tract area; the provision includes barns, stables, equipment sheds and private garages.6 Ask the Kemp Permitting Department to identify your parcel’s district and confirm setbacks before drawing the house and outbuildings; the agricultural-district acreage rule is a district-specific requirement.85
How do septic permits work inside Kemp?
Kaufman County Development Services handles septic permitting inside Kemp, and a septic system must be permitted before operation.311 Kemp also requires a city permit for a septic tank or private sewage facility: the city council must determine that public sewage service is unavailable, and the applicant must show satisfactory soil conditions.4 Discuss sewer availability and city approval with Kemp before treating county septic approval as the entire process.4
Kaufman County’s soil data rates only 3.4% of soils not limited for conventional septic drain fields; this countywide rating supports budgeting for a site evaluation and potentially an engineered system, rather than assuming septic is impossible.12 Texas has a conditional 10-acre septic exemption, but local programs can impose stricter requirements, so ask Development Services whether any exemption applies alongside Kemp’s city approval.134
Can you live in an RV or tiny home in Kemp?
Kemp has city zoning, so the absence of general county zoning outside city limits does not answer an RV or tiny-home question inside Kemp.214 We could not confirm an affirmative rule allowing residential RV occupancy or tiny-home occupancy in Kemp; ask the Kemp Permitting Department about your proposed use, parcel district and construction type before buying a unit.8
Wastewater remains a separate approval: private sewage facilities in Kemp need city approval, and Kaufman County handles the septic permit.43 Texas’s owner-occupied electrical-work licensing exemption does not waive local building permits or inspections, and municipal requirements may override that licensing exemption.7
Building a home in Kemp: what should you do first?
- Ask the Kemp Permitting Department to confirm the parcel’s zoning district and proposed residential use; in the A Agricultural District, confirm the 2-acre building-lot requirement and utility or septic service.85
- Confirm public sewer availability with Kemp; if private sewage is proposed, obtain the city’s required determination and approval and discuss septic permitting with Kaufman County Development Services.411
- Request Kemp’s building-permit requirements for the house, or submit the city survey for a house remodel.1
- Keep construction plans on-site and schedule city building inspections through Bureau Veritas.1
For land outside Kemp city limits, use the Kaufman County guide for the county’s unincorporated building-permit answer.15
Watch-outs
- Kemp’s private-sewage approval and Kaufman County’s septic permitting are separate requirements to resolve before installation.411
- We could not confirm Kemp’s residential building-permit fee amounts, minimum dwelling size or private-well requirements; ask the Kemp Permitting Department before budgeting or buying.8
- A driveway onto state highway right-of-way needs the applicable access approval; contact the local TxDOT district office before construction.16
- Kemp’s current city notice says Stage 3 severe water-shortage conditions are being enforced; ask City Hall how current water restrictions affect your plans.17
Sources
- City of Kemp Building Plan Review and Inspections (cityofkemp.org)
- Sec. 42-220. Permitted uses, A, Agricultural District (Kemp), quoted and re-checked
- FAQs - Development Services (Kemp), quoted and re-checked
- Sec. 16-4. Septic tanks and private sewage facilities (Kemp), quoted and re-checked
- Sec. 42-220. Permitted uses, A, Agricultural District (Kemp), quoted and re-checked
- Sec. 42-220. Permitted uses, A, Agricultural District (Kemp), quoted and re-checked
- Exemptions to Electrician Licensing (Texas statewide rule), quoted and re-checked
- City of Kemp Permitting Department (cityofkemp.org)
- Commercial Building Permit Procedure (Kemp), quoted and re-checked
- Commercial Building Permit Procedure (Kemp), quoted and re-checked
- On-Site Sewage Facilities (Kemp), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
- Kaufman County Development Services (2026 county census)
- Permits and Inspections (2026 county census)
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
- City of Kemp Water Service (cityofkemp.org)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.