Bolthole Index

Harrison County, Texas

Building permits, zoning and septic rules in Hallsville, Texas

Hallsville, Texas, in Harrison County, issues city building permits; obtain a building permit before starting construction.1 Hallsville also administers its own zoning ordinance and map.2 Septic administration stays with Harrison County Environmental Health; confirm the wastewater route for your city address before designing a system.3

At a glance

Building permits
City building permit before construction; start with Hallsville City Hall14
Zoning
City zoning ordinance and official map apply inside Hallsville2
Building codes
City has adopted building-code regulations; ask for current editions5
Septic
Harrison County Environmental Health administers OSSFs; confirm the city parcel’s wastewater requirements3
Building fees
Published 2020 schedule: $30 application and $0.53 per square foot under roof for new construction, plus application and inspection fees; electrical/plumbing excluded6
Agricultural land division
City subdivision-definition exclusion for agricultural tracts of at least 5 acres without a new street, alley or access easement7

Who to call

Building permits

Hallsville City Hall / City Secretary

Building-permit application contact

903-668-2313

[email protected]

201 Willow Street. Hallsville, TX 75650

Building permits

Hallsville Building Inspector

City building permits and final inspections

903-668-2313

201 Willow Street, Hallsville, TX 75650

Zoning

Hallsville Planning & Zoning / City Hall

Contact for the city zoning map and planning questions

903-668-2313

[email protected]

201 Willow Street. Hallsville, TX 75650

Septic permits

Harrison County Environmental Health

County OSSF (septic) administration

(903) 935-4870, Ext. 1362

2005 Warren Drive Marshall, Texas 75672

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Hallsville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Hallsville, Texas?

Hallsville’s building-permit form warns that starting construction before obtaining a building permit results in a violation.1 Hallsville has adopted building-code regulations, so ask City Hall which current code editions and project approvals apply to your proposed home or addition.5

The city’s published schedule, effective in 2020, lists a $30 building-permit application fee and $0.53 per square foot under roof for new construction, plus application and inspection fees; electrical and plumbing fees are excluded.6 Request a current itemized fee calculation from City Hall before budgeting the project.4

Who issues building permits in Hallsville, and how do you reach them?

Start with Hallsville City Hall / City Secretary for the city’s building-permit application; the municipal page offers a form labeled new July 2025.4 Hallsville City Hall is at 201 Willow Street, Hallsville, TX 75650, with phone 903-668-2313 and email [email protected].4 City Hall lists office hours as 8am to 5pm Monday through Friday.4

Hallsville’s building inspector performs the final inspection referenced in the city building-permit form.1 Septic administration is a separate responsibility of Harrison County Environmental Health, so a city building permit does not settle the wastewater approval question.3

Does Hallsville have zoning, and what does it mean for your lot?

Hallsville administers a zoning ordinance and official zoning map for land inside city limits, with district-specific controls and permitted-use limitations.2 The map includes single-family residential, manufactured-home subdivision, townhouse residential, multiple-family residential, agricultural, business, industrial and public-institutional districts.8 Ask Hallsville Planning & Zoning through City Hall to identify the parcel’s district before selecting a home design.9

We could not confirm Hallsville’s district-specific minimum lot size, minimum dwelling size, setbacks, lot coverage or height limits; request those provisions for the exact district from Hallsville Planning & Zoning.2 Hallsville also regulates subdivision and platting, requiring conformity with the city’s Comprehensive Plan and related public-utility facilities.10

How do septic permits work inside Hallsville?

Harrison County Environmental Health administers on-site sewage facilities in Harrison County; ask the office to confirm the septic-permit requirements for your Hallsville parcel and ask City Hall about the city wastewater connection route.34 Construction, installation, alteration, extension or repair of an OSSF generally requires a septic permit unless an applicable exception applies.11

The 10-acre permitting exemption requires a licensed site evaluation, a single-family dwelling as the only dwelling on the tract, all OSSF parts at least 100 feet from the property line, on-property effluent disposal, no nuisance or groundwater pollution, and compliance with planning, construction and installation standards.11 Commercial and multifamily residences require a septic permit and licensed installation.11 Harrison County’s soil rating shows only 6.5% rated not limited for conventional drain fields; this county-wide figure supports obtaining a parcel evaluation, not concluding septic is impossible.12

Can you live in an RV or tiny home on land in Hallsville?

We could not confirm a Hallsville rule allowing RV occupancy, temporary camping or tiny-home occupancy on a private lot; ask Hallsville Planning & Zoning for a written answer tied to the parcel and proposed use.2 Hallsville’s zoning map includes a manufactured-home subdivision district, but that district label does not establish permission for an RV, tiny home or manufactured home on any particular lot.8

Hallsville’s building-permit form states that inhabiting a structure before a CSI and city building inspector’s final inspection leads to a $500 fine assessed to the general contractor.1 Ask the city what inspections and occupancy approval your proposed dwelling needs before moving in.1

What should you do before building a home in Hallsville?

First, ask Hallsville Planning & Zoning to confirm the parcel’s city-limit status, zoning district and proposed residential use.2 Next, take the project to City Hall for the city building-permit application and current fee calculation before construction.41 Resolve wastewater service with City Hall and, if an OSSF is proposed, Harrison County Environmental Health before committing to the layout.43 Arrange the city’s required final inspection before inhabiting the structure.1

For a land division, Hallsville’s agricultural exclusion concerns tracts of at least 5 acres without a new street, alley or access easement; it is not a general exemption from development rules.7 For land outside Hallsville city limits, use the Harrison County guide for the county’s separate unincorporated-area subdivision requirements.13

Watch-outs

  • Hallsville’s published building-fee schedule is effective in 2020; confirm current rates with City Hall before relying on the listed charges.6
  • We could not confirm a Hallsville owner-builder exemption or certificate-of-occupancy requirement; ask City Hall before beginning work or planning a move-in date.4
  • We could not confirm the complete Hallsville floodplain-development or private-well approval requirements; ask City Hall to identify the responsible office for the parcel.4

Sources

  1. Hallsville Building Inspector (cityofhallsvilletx.com)
  2. Zoning Ordinance 2016-06 (Hallsville), quoted and re-checked
  3. Environmental Health, quoted and re-checked
  4. Hallsville City Hall / City Secretary (cityofhallsvilletx.com)
  5. Ordinance 2021-01 Amending Building Codes (Hallsville), quoted and re-checked
  6. City of Hallsville Rates/Fees (Hallsville), quoted and re-checked
  7. Ordinance 2016-07 Comprehensive Subdivision Ordinance (Hallsville), quoted and re-checked
  8. Official Zoning Map (Hallsville), quoted and re-checked
  9. Hallsville Planning & Zoning / City Hall (cityofhallsvilletx.com)
  10. Ordinance 2016-07 Comprehensive Subdivision Ordinance (Hallsville), quoted and re-checked
  11. Environmental Health, quoted and re-checked
  12. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  13. Harrison County Subdivision Regulations, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Hallsville

Hallsville’s own rules

  • Building code adoptedAdopted (with conditions)

    Building, plumbing, gas, mechanical, and fire-code regulation inside Hallsville city limits.

    • The city page identifies Ordinance 2021-01 as amending building codes; the detailed adopted editions were not separately extracted.
    “Ordinance 2021-01 Amending Building Codes”
  • Local zoningPresent (with conditions)

    Land inside Hallsville city limits; the city publishes and administers a zoning ordinance and official zoning map.

    • District-specific controls and permitted-use limitations apply under Ordinance 2016-06.
    “CITY OF HALLSVILLE, TEXAS OFFICIAL ZONING MAP”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Hallsville city limits.

    • The official map identifies SF-8 Single Family Residential, MH-6 Manufactured Home Subdivision District, TH-12 Townhouse Residential, GB General Business, LI Light Industrial, P Public-Institutional, AG Agricultural, and MF-36 Multiple Family Residential districts.
    • The map states it was adopted July 26, 2016.
    “Legend - ZONING City LimitsSF-8 Single Family ResidentialMH-6 Manufactured Home Subdivision DistrictTH-12 Townhouse ResidentialGB General Business DistrictLI Light Industrial DistrictP Public - InstitutionalAG Agricultural DistrictMF-36 Multiple Family Residential”
  • Agricultural exemptionConditional

    Division of land inside Hallsville city limits for agricultural purposes.

    • The parcels or tracts must be five acres or more.
    • The division must not involve a new street, alley, or easement of access.
    • This is an exclusion from the ordinance's subdivision definition, not a general exemption from all development rules.

    minimum tract size: >= 5 acres (must not involve a new street, alley, or easement of access)

    “but it does not include the division of land for agricultural purposes in parcels or tracts of five (5) acres or more and not involving any new street alley, or easement of access.”
  • Subdividing landRegulated (with conditions)

    Subdivision and platting inside Hallsville city limits.

    • The ordinance also applies to the City's extraterritorial jurisdiction, but this claim is limited to land inside city limits.
    • No plat or subdivision may be approved unless it conforms to the City's most current Comprehensive Plan and related public-utility facilities.
    • Agricultural division into parcels or tracts of five acres or more without a new street, alley, or access easement is excluded from the ordinance's subdivision definition.
    “No plat or subdivision of land within the City and its extraterritorial jurisdiction as determined by Article 974A, V.A.C.S., shall be approved unless it conforms to the most current Comprehensive Plan of said City”
  • Permit feesPublished (with conditions)

    City building permits inside Hallsville city limits.

    • The schedule states it is effective October 1, 2020.
    • Building permit fees exclude electrical and plumbing fees.
    • New-construction fees include the application fee and inspection fee as specified.
    • A newer fee schedule may exist because the cited schedule predates the current retrieval date.

    building permit application fee: 30 USD · new construction under roof: 0.53 USD per square foot (plus application fee and inspection fee)

    “BUILDING PERMITS (Excludes Electrical/Plumbing Fees) Building Permit Application Fee $30.00 Building Permit - New Construction - Under Roof $.53 per square foot + App Fee + Inspection Fee”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Hallsville or Harrison County directly.

  • Owner-builder exemption — Owner-builders constructing inside Hallsville city limits.
  • Certificate of occupancy — Certificate-of-occupancy requirements for land inside Hallsville city limits.
  • Minimum dwelling size — Minimum dwelling size inside Hallsville city limits.
  • Minimum lot size — Minimum lot size inside Hallsville city limits.
  • Setbacks — Building setbacks inside Hallsville city limits.
15 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Hallsville publishes no rule on the point, not that none exists. Harrison County’s page lists the county offices to call.

← All of Harrison County: county rules, score and offices