New Summerfield, Texas (Cherokee County) has adopted the 2012 International Residential Code for detached one- and two-family homes inside city limits1, and requires a city permit before a manufactured home is placed2. Septic systems need a city permit and county inspection services also permit new ones3. We could not confirm the city's zoning districts, so ask City Hall before you buy4.
At a glance
- Building code
- 2012 International Residential Code adopted for one- and two-family homes in the city1
- Building permit
- Required for manufactured homes; site-built home permit rule not confirmed2
- Septic
- City permit first, then county inspection services permit and inspect new systems3
- Septic lot size
- At least 20,000 square feet and 200 feet wide5
- City sewer
- Connection required where the property line is within 500 feet of city sewer6
- Manufactured home permit fee
- $150, including electrical and plumbing inspections7
- Zoning, RVs, tiny homes
- Not confirmed; ask City Hall4
Who to call
Building permits
City of New Summerfield City Hall
City hall for the city's permits, zoning questions and code enforcement inside New Summerfield city limits
13280 State Hwy 110 N.
Septic permits
County health department; ask whether it handles septic inspection and permits for your address
1502 South Bolton Street Jacksonville, Texas 75766
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in New Summerfield means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in New Summerfield, Texas?
Inside New Summerfield city limits, the city has adopted the 2012 International Residential Code as its residential building code for detached one- and two-family dwellings and accessory structures1. New Summerfield requires a permit before any manufactured home is placed, erected or installed, except within a licensed manufactured home park2. The city's published manufactured-home permit fee is $150, which includes electrical and plumbing inspections7. We could not confirm the permit steps for a conventional site-built house or a certificate of occupancy, so call City Hall before you draw plans4.
Who issues building permits in New Summerfield, and how do you reach them?
New Summerfield City Hall is the place to start for building permits inside the city, at 13280 State Hwy 110 N., phone (903) 726-36514. City Hall is open 8:00 AM to 4:30 PM, Monday through Friday4. For manufactured homes, the city's building official reviews the application, may ask for a site plan or survey and proof of ownership, and issues the permit once the plan meets the ordinance8. The building official may also inspect to confirm compliance9.
Does New Summerfield have zoning, and what about RVs and tiny homes?
We could not confirm New Summerfield's zoning districts, minimum home size, setbacks, accessory dwelling rules, or whether RV or tiny-home living is allowed inside the city. Ask City Hall for the zoning map and ordinance for your lot4. One rule we did confirm: a manufactured home occupied as living quarters may not have a driveway in the front yard, except along either side of the lot at a right angle to the street10. Outside city limits, unincorporated Cherokee County has adopted no county zoning ordinance, so the county sets no rule on RV, tiny-home or setback questions there11. See the Cherokee County page for land outside the city.
How do septic permits work inside New Summerfield?
Any septic system inside New Summerfield needs prior inspection and a permit from the city3. For a new residence or relocated mobile home, county inspection services must also permit the system, and a county representative is called out to inspect it regardless of acreage12. Construction using a septic system needs a lot at least 20,000 square feet and 200 feet wide, and the county health department can require more area if the ground absorbs poorly5. Where city water lines are available you must connect to water, and where the property line is within 500 feet of city sewer you must connect to sewer6. Texas also lets a single-family dwelling on a tract of at least 10 acres seek an exemption from septic permitting under strict conditions, but the city's own rule requires a permit inside city limits133. Cherokee County soils are tough: USDA rates only about 14% as not limited for a conventional drain field, so expect a site evaluation14.
Building a home in New Summerfield: the steps, in order
- Call City Hall to ask what permits your lot needs and which zoning district it sits in4.
- Check whether city sewer is within 500 feet of your property line; if so, you must connect6.
- If you need septic, confirm the lot meets the 20,000 square foot, 200 foot width minimum5.
- Get the city septic permit and schedule county inspection312.
- For a manufactured home, apply for the city permit before placement2.
- Subdividing land? The city regulates subdivisions under Ordinance 2000-615.
What stays with Cherokee County and the state?
Septic inspection stays with county inspection services, the inspection arm of the county health department, even inside the city16. Cherokee County Public Health is at 1502 South Bolton Street, Jacksonville, phone (903) 586-619117. A driveway onto a state highway needs a TxDOT permit on Form 105818. Cherokee County's effective property tax rate is 1.2%19.
Watch-outs
- We could not confirm a certificate of occupancy rule, a private well permit rule, or RV, tiny-home and short-term-rental rules inside New Summerfield; call City Hall4.
- Floodplain rules apply to any manufactured home in a FEMA-designated flood zone inside the city20.
- The city adopted the 2012 residential code with local deletions and amendments, so ask City Hall for the amended text1.
Sources
- City of New Summerfield, TX Residential Code (New Summerfield), quoted and re-checked
- Article 3.04 Manufactured Homes and Mobile Homes (New Summerfield), quoted and re-checked
- Article 13.06 On-Site Sewage Facilities (New Summerfield), quoted and re-checked
- City of New Summerfield City Hall (newsummerfield.us)
- Article 13.06 On-Site Sewage Facilities (New Summerfield), quoted and re-checked
- Article 13.03 Water and Sewer Service (New Summerfield), quoted and re-checked
- Appendix A Building and Construction Related Fees (New Summerfield), quoted and re-checked
- Article 3.04 Manufactured Homes and Mobile Homes (New Summerfield), quoted and re-checked
- Article 3.04 Manufactured Homes and Mobile Homes (New Summerfield), quoted and re-checked
- Article 3.04 Manufactured Homes and Mobile Homes (New Summerfield), quoted and re-checked
- Texas law on county zoning and building authority
- Article 13.06 On-Site Sewage Facilities (New Summerfield), quoted and re-checked
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Chapter 10 Subdivision Regulation (New Summerfield), quoted and re-checked
- Article 13.06 On-Site Sewage Facilities (New Summerfield), quoted and re-checked
- Cherokee County Public Health (co.cherokee.tx.us)
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Article 3.04 Manufactured Homes and Mobile Homes (New Summerfield), quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.