For a new home in Murfreesboro, Tennessee, apply for a residential building permit through the city Permit Center.1 Murfreesboro administers city zoning, while TDEC handles on-site septic permits where public sewer is not used.23 For land outside city limits, use the Rutherford County guide: county zoning authority applies outside municipalities.4
At a glance
- Building permits
- City Permit Center; allow 2 weeks for residential application processing.1
- Zoning
- City zoning districts and Land Use Chart determine permitted land uses.25
- Septic permits
- TDEC approval required before septic installation or repair.36
- Lot size
- RS-10 requires at least 10,000 square feet per dwelling unit; other district requirements differ.7
- Occupancy approval
- Building-permit applications also apply for a certificate of occupancy; final inspection required.8
- Farm buildings
- Tennessee’s county agricultural zoning exemption does not apply to municipalities.9
Who to call
Building permits
Murfreesboro Building and Codes Department
City construction plan review, building inspections and certificates of occupancy.
111 West Vine Street Murfreesboro, TN 37130
Planning & zoning
Murfreesboro Planning and Zoning Department
City land-use information and development-plan review.
111 W. Vine St. Murfreesboro , TN 37130
Building permits
Residential building permit applications and fee notification.
Septic permits
TDEC Division of Water Resources
State septic-system permitting; county page supplies the TDEC contact.
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Murfreesboro means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Murfreesboro, TN?
Murfreesboro’s Permit Center provides residential building permit applications for new homes, and residential applications may be submitted by email or in person at City Hall.1 Allow 2 weeks for processing; the Permit Center says approved applicants receive notification of building permit fees and payment options.110
Murfreesboro has adopted construction codes, including the 2024 International Residential Code and the 2023 National Electrical Code.11 City Building and Codes reviews plans, performs construction inspections and issues certificates of occupancy, so plan review is the beginning of the approval process rather than the final permission to move in.12
Who handles building permits and zoning in Murfreesboro?
Murfreesboro Building and Codes handles residential and commercial construction review, inspections and certificates of occupancy; call 615-893-3750 or visit 111 West Vine Street Murfreesboro, TN 37130.13 Murfreesboro Planning and Zoning assists with land-use questions and reviews development plans for compliance with city ordinances; call 615-893-6441.14
Use city Planning for an address inside Murfreesboro, rather than treating Rutherford County’s unincorporated zoning rules as city rules.24 Building and zoning approval do not replace the TDEC septic construction permit needed when installing or repairing an on-site septic system.6
Does Murfreesboro have zoning, lot-size rules and farm exemptions?
Murfreesboro has city zoning, and the city directs property owners to its GIS zoning layers and Land Use Chart to identify a parcel’s district and allowed uses.25 In Murfreesboro’s RS-10 Single-Family Residential District, the minimum lot area is 10,000 square feet per dwelling unit; Chart 2 and other applicable provisions may add lot and yard requirements.7 Ask city Planning to review the district and proposed layout before committing to a house plan.14
Tennessee’s agricultural zoning exemption applies to counties and has no application to municipalities, so that exemption does not establish an exemption for a farm building inside Murfreesboro.9 Murfreesboro also reviews subdivision plats and construction plans through its Planning and Zoning Department.15
How do septic permits work inside Murfreesboro?
TDEC administers septic permitting for Murfreesboro property using on-site sewage disposal rather than public sewer.3 Obtain the septic construction permit before installation or repair; the conventional septic permit should be obtained before dirt work or building-pad construction begins.6 The applicant or installer must notify TDEC after installation so the system can be inspected and approved.16
Rutherford County’s septic contact page directs septic questions to TDEC at (615) 687-7000.17 Across Rutherford County, 16.2% of soils rate “not limited” for conventional septic drain fields; that countywide rating calls for a parcel-specific evaluation, rather than proving a Murfreesboro lot can or cannot support septic.18
Can you live in an RV or tiny home in Murfreesboro?
We could not confirm permission for private-land RV occupancy or tiny-home occupancy in Murfreesboro; ask city Planning to evaluate the proposed use in the parcel’s zoning district.14 Murfreesboro’s prohibition on camping on specified public property does not answer whether an RV may be occupied on private land.19
For a structure requiring a city building permit, the permit application also serves as the certificate-of-occupancy application, and final inspection is required.8 A temporary certificate may cover a safe, habitable, conforming temporary or incomplete structure for no more than 6 months; that provision does not itself authorize RV living.8
What are the steps to build a home in Murfreesboro?
- Identify the parcel’s city zoning district and review the Land Use Chart with Murfreesboro Planning before choosing the layout.514
- If using septic, obtain TDEC approval before dirt work or building-pad construction.6
- Submit the residential building permit application to the city by email or in person and allow 2 weeks for processing.1
- Complete city construction inspections and obtain occupancy approval after final inspection; notify TDEC separately when the septic installation is ready for approval.12816
For mapped flood-hazard land inside Murfreesboro, contact the city floodplain administrator before development; floodplain requirements are locally managed and may require review before construction, grading or fill.20
Watch-outs
- Murfreesboro building permits may be subject to Rutherford County Schools Facilities Tax and city impact fees; ask the Permit Center about the charges for your project.10
- We could not confirm Murfreesboro’s owner-builder eligibility terms; ask Building and Codes before applying as your own contractor.13
- We could not confirm the city’s parcel-specific public-water or sewer availability requirements; ask city Planning which utility review your proposed development needs.14
Sources
- Permit Center (Murfreesboro), quoted and re-checked
- Zoning Ordinance_City of Murfreesboro (Murfreesboro), quoted and re-checked
- Septic System Construction Permit (Murfreesboro), quoted and re-checked
- Tennessee Attorney General Opinion No. 10-108 (Tennessee statewide rule), quoted and re-checked
- Zoning Inquiries (Murfreesboro), quoted and re-checked
- Septic System Construction Permit (Murfreesboro), quoted and re-checked
- Appendix A Zoning District Standards (Murfreesboro), quoted and re-checked
- Appendix A Zoning, Section 5 (Murfreesboro), quoted and re-checked
- Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule), quoted and re-checked
- Murfreesboro Permit Center (murfreesborotn.gov)
- Construction Codes (Murfreesboro), quoted and re-checked
- Building and Codes (Murfreesboro), quoted and re-checked
- Murfreesboro Building and Codes Department (murfreesborotn.gov)
- Murfreesboro Planning and Zoning Department (murfreesborotn.gov)
- Planning and Zoning Forms and Documents (Murfreesboro), quoted and re-checked
- Septic System Construction Permit (Murfreesboro), quoted and re-checked
- TDEC Division of Water Resources (solidwaste.rutherfordcountytn.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Murfreesboro City Code § 21-8 (Murfreesboro), quoted and re-checked
- Statewide Floodplain Administrator Directory (Tennessee statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.