Bolthole Index

Hamlin County, South Dakota

Building permits, zoning and land rules in Hamlin County, South Dakota

48Index Score / 100
#33 of 66 in South Dakota

Unincorporated Hamlin County, South Dakota requires a building permit before construction, excavation, moving or alteration of a building or accessory building begins.1 County zoning also applies in unincorporated areas, while incorporated municipalities administer their own local rules.2 Apply through the Hamlin County Zoning Officer, and do not expect a permit on the day the application is submitted.3

At a glance

Building permit
Required for covered work in unincorporated Hamlin County1
Zoning
County zoning applies in unincorporated areas2
Septic
State standards apply; local administration should be confirmed before design45
RV or tiny-home living
Not confirmed; ask the Zoning Officer about the parcel and proposed occupancy6
Owner electrical work
A qualifying resident owner may do the work with a homeowner permit and inspection7
Agricultural District lot size
At least 2 acres under the cited district schedule8
Domestic well
A water-right permit is generally unnecessary below the state domestic-use thresholds9

Who to call

Zoning

First District Association of Local Governments Zoning Officer

Hamlin County building permits, conditional uses, variances and zoning changes

(605) 882-5115

418 18th Ave NE PO Box 1207 Watertown, SD 57201

Online permits →

Septic permits

South Dakota Department of Agriculture and Natural Resources

State on-site wastewater design requirements and septic-system information

(605) 773-4647

523 E Capitol Ave, Pierre, SD 57501-3182

Contact details are copied from each office’s official page and were checked against it on September 28, 2026.

Do you need a building permit in Hamlin County, South Dakota?

Yes. In unincorporated Hamlin County, a building permit is required before starting excavation for, construction of, moving of or alteration to a building or accessory building.1 A temporary structure with less than 150 square feet of gross floor area is exempt from the building permit, but it still must follow the ordinance's other regulations.1 The issued permit must be displayed where it is conspicuous from the public right-of-way.10

A landowner applies with the appropriate fee and returns the completed application to the Zoning Officer for review.11 The application requires a scaled site plan showing lot dimensions, existing buildings, the proposed building or alteration, uses, units and lot conditions.11 If the work is not substantially completed within 1 year after issuance, the permit expires and is cancelled.11

Who issues Hamlin County building permits, and how do you reach the office?

The First District Association of Local Governments Zoning Officer handles Hamlin County's online applications for building permits, conditional uses, variances and zoning changes.3 The office phone is (605) 882-5115, and the official planning page links directly to the online permitting page.3 The Zoning Officer is available by phone or in person on Mondays and Thursdays, with Zoom available by appointment.3

Hamlin County building permits are not issued on the day an application is submitted, so allow review time before scheduling excavation or construction.3 Incorporated municipalities administer their own local rules rather than the county rules that govern unincorporated land.2 Confirm the parcel's jurisdiction before applying, especially when a mailing address uses a nearby town name but the site may lie outside city limits.2

Does Hamlin County have zoning?

Yes. Hamlin County zoning applies throughout the county's unincorporated areas, and incorporated municipalities administer their own local rules.2 The county map includes Agricultural, Conservation, Commercial/Industrial, Lake Park, Planned Residential, Town, Aquifer Protection and Flood Plain Overlay districts, so the parcel's mapped district controls which schedule to read.12

In the Agricultural District schedule, the cited minimum lot size is 2 acres.8 Agricultural District setbacks vary by the site and structure: cited front setbacks are 50 feet for a farm-related structure on an existing farmstead and 100 feet for a dwelling on an existing farmstead or a structure not on an existing farmstead; cited side and rear setbacks are 15 feet and 30 feet.13 These figures are not a countywide shortcut for every district, so have the Zoning Officer identify the district and current parcel-specific requirements before designing the site plan.12

How do septic permits work in Hamlin County?

South Dakota regulates individual and small on-site wastewater systems through statewide minimum requirements, while local governments may impose stricter requirements.5 State regulation applies in Hamlin County, with permits and site evaluations administered locally, but we could not confirm the specific local permitting contact; ask the Hamlin County Zoning Officer who must approve the system for the parcel before ordering a design.4

Soil planning deserves early attention: 0% of mapped county soils are rated without severe limitations for a conventional septic drain field.14 That rating does not by itself prohibit septic, but it makes a site evaluation and a system suited to actual soil conditions especially important.14 Where water or electricity is unavailable, state rules address vault privies, chemical toilets, incinerator toilets and composting units, and unconventional systems other than vault privies require plans and specifications submitted for approval before installation.15

Can you live in an RV or tiny home on land in Hamlin County?

We could not confirm a general Hamlin County rule allowing or prohibiting long-term RV occupancy, temporary camping or tiny-home occupancy on private land. Ask the Hamlin County Zoning Officer about the parcel's zoning district, the proposed structure and the intended duration of occupancy before buying or moving a unit onto the site.6

A tiny home is not automatically outside the permit system: unincorporated Hamlin County requires a permit for covered building construction, moving and alteration, and the narrow cited exception is for temporary structures under 150 square feet.1 County zoning districts also carry parcel-specific use and dimensional rules.12 Off-grid sanitation is a separate state-regulated issue; unconventional systems other than vault privies require advance plan approval.15 Do not treat an RV, tiny footprint or lack of utility connections as a substitute for confirming zoning, building-permit and wastewater approval.15

Building a home in Hamlin County: what are the steps?

  1. Confirm that the parcel is in unincorporated Hamlin County and have the Zoning Officer identify its mapped zoning district.212
  2. Ask the Zoning Officer to confirm the allowed use, applicable lot size and setbacks before finalizing a site plan.813
  3. Resolve wastewater early because state standards govern on-site systems and local governments may impose stricter requirements.5
  4. Submit the building/use application, scaled site plan and appropriate fee through the county permitting process, allowing time because permits are not issued on submission day.113
  5. Determine whether the proposed well use needs a water-right permit before drilling; ordinary domestic use generally does not, but use over 25,920 gallons per day or a peak rate over 25 gallons per minute does.9
  6. Arrange electrical and plumbing permits and inspections; qualifying resident owners still need a homeowner electrical permit, and covered plumbing installations require an inspection certificate.716

What should you check before buying land in Hamlin County?

Start with jurisdiction, the official zoning map and the exact district because county rules apply to unincorporated land and municipal rules apply inside incorporated places.212 Price a soil evaluation before assuming a conventional drain field will work, because 0% of mapped soils are rated without severe limitations for that use.14

For water, ordinary domestic use generally does not need a water-right permit, but higher-volume or faster-pumping domestic use crosses the state thresholds.9 For access onto a state highway, South Dakota Department of Transportation permission is required before construction begins.17 A county driveway requirement for other roads could not be confirmed, so ask the County Highway Department or the responsible township before assuming an existing field entrance can serve a home. For flood-prone land, participating communities require permits for all development in the floodplain.18 The county's effective property-tax rate is about 1.1%, and the median annual property-tax bill is about $2,264.1920

Watch-outs

  • Hamlin County building permits are not issued on the day an application is submitted.3
  • The cited 2-acre minimum and setback figures come from the Agricultural District schedule, not every zoning district.813
  • Routine county building inspections and a general certificate-of-occupancy requirement could not be confirmed; ask the Zoning Officer what inspections and closeout documents apply to the project.10

Sources

  1. Hamlin County Zoning Ordinance, quoted and re-checked
  2. Hamlin County Zoning Ordinance, quoted and re-checked
  3. First District Association of Local Governments Zoning Officer (association.1stdistrict.org)
  4. SD DANR Septic Tank Systems (2026 county census)
  5. On-Site Wastewater Systems in South Dakota (South Dakota statewide rule), quoted and re-checked
  6. Hamlin County Zoning Ordinance (2026 county census)
  7. South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
  8. Hamlin County Zoning Ordinance, quoted and re-checked
  9. Using Water in South Dakota, quoted and re-checked
  10. Hamlin County Zoning Ordinance (2026 county census)
  11. Hamlin County Zoning Ordinance, quoted and re-checked
  12. Hamlin County Official Zoning Map, quoted and re-checked
  13. Hamlin County Zoning Ordinance, quoted and re-checked
  14. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  15. Administrative Rule 74:53:01 — Individual and Small On-Site Wastewater Systems (South Dakota statewide rule), quoted and re-checked
  16. South Dakota Plumbing Commission - Inspections (South Dakota statewide rule), quoted and re-checked
  17. Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule), quoted and re-checked
  18. National Flood Insurance Program (South Dakota statewide rule), quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data
  20. Median property tax bill: Bolthole Index county data

Written September 28, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Hamlin County in South Dakota

48
County map
Hamlin County highlighted among the South Dakota counties · colored by Index score

How Hamlin County scores

Seclusion78100% ev.
Self-Sufficiency1998% ev.
Admin Boringness49100% ev.
Durability47100% ev.
Property Autonomy67100% ev.
Carry Cost72100% ev.

Evidence strength: 99%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$345kTypical home
1.1%Property tax
$5,101Land / acre
25.3"Annual rain
4.9% of yrsSevere drought
4.5 / yr (+4.1)Mid-century 100°F days
18.6 daysMid-century dry spell
1.5" (+7.4%)Mid-century 1-day rain
1.59×Wildfire change factor
100%Forward climate coverage
$1,803Home insurance / yr
4.9% / yrInsurance growth
0.77%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
4,413People within 30 min
522,372People within 2 hr
6,728Radius comparison (15 mi)
12.7People / sq mi
12%Federal land
98.8%Land at 15% slope or less
0%Septic soil without severe limits
0 acWorkable land screen
1.1%Wooded land
7.1 tonsBiomass / forest ac
43°FAvg temp

Scout Hamlin County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Hamlin County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Hamlin County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Hamlin County rules

  • Building permitRequired

    Construction, excavation, moving, or alteration of buildings and accessory buildings in unincorporated Hamlin County.

    • Temporary structures with gross floor area under 150 square feet do not require a building permit but must comply with all other ordinance regulations.
    • The permit must be displayed conspicuously from the public right-of-way.

    temporary-structure exemption floor area: < 150 square feet (Temporary structures under this threshold do not require a building permit.)

    “It shall be unlawful to commence the excavation for or the construction of any building or any accessory building, or to commence the moving or alteration of any buildings, including accessory buildings, until the Zoning Officer has issued a building permit for such work. Exception: Temporary structures with a gross floor area of less than one hundred fifty (150) square feet do not require building permits but shall comply with all other regulations contained herein.”
  • County-wide zoningPresent

    Zoning in the unincorporated areas of Hamlin County.

    • The ordinance applies to unincorporated areas; incorporated municipalities administer their own local rules.
    “Pursuant to SDCL 11-2, 1967, as amended, the provisions of this Ordinance shall apply within the unincorporated areas of Hamlin County, South Dakota, as established on the map entitled “The Official Zoning Map of Hamlin County, South Dakota.””
  • Zoning districtsPublished

    Official zoning districts and map for unincorporated Hamlin County.

    • The official map identifies Agricultural, Conservation, Commercial/Industrial, Lake Park LP1 and LP2, Planned Residential, Town, Aquifer Protection, and Flood Plain Overlay districts, with parcel- and geographic-specific provisions.
    • The ordinance states the County Auditor's official map is the final authority as to current zoning status.
    “For the purpose of this Ordinance, the unincorporated areas of the County may be divided into any of the following zoning districts: A--Agricultural; CI--Commercial/Industrial; CN--Conservation; LP-- Lake Park; PR -- Planned Residential; and TD--Town District.”
  • Minimum lot sizeSpecified

    Agricultural District lots in unincorporated Hamlin County.

    • The cited minimum applies to the Agricultural District schedule, not every county parcel.

    minimum lot size: >= 2 acres

    “Agricultural District - Schedule of Regulations Minimum Lot Size 2 Acres* **”
  • SetbacksSpecified

    Agricultural District structures and dwellings in unincorporated Hamlin County.

    • Existing farmstead and non-farmstead structures have different front-yard requirements.

    farm-related structure front setback on existing farmstead: >= 50 feet · dwelling front setback on existing farmstead: >= 100 feet · front setback for structures not on existing farmstead: >= 100 feet · side-yard setback: >= 15 feet · rear-yard setback: >= 30 feet

    “Minimum Front Yard Setback for Agricultural Related Structures on an Existing Farmstead 50 Feet** Minimum Front Yard Setback for dwellings on an Existing Farmstead 100 Feet** Minimum Front Yard Setback for all structures not on an Existing Farmstead 100 Feet** Minimum Lot width 150 Feet** Minimum Side Yard Setback 15 Feet** Minimum Rear Yard Setback 30 Feet**”
  • Subdividing landLimited

    Subdivision proposals in areas governed by Hamlin County floodplain regulations.

    • Subdivision proposals must minimize flood damage, provide appropriately located utilities and facilities, provide adequate drainage, and provide base-flood-elevation data when the proposal contains at least 50 lots or 5 acres, whichever is less.

    base-flood-elevation threshold: 50 lots or 5 acres, whichever is less

    “Base flood elevation data shall be provided for subdivision proposals and other proposed development which contain at least 50 lots or 5 acres (whichever is less).”
  • Permit processPublished (with conditions)

    County building/use permit process in unincorporated Hamlin County.

    • Applications require a scaled site plan showing lot dimensions, existing buildings, proposed building or alteration, uses, units, lot conditions, and other information required by the Zoning Officer.
    • The landowner completes the application with the appropriate fee and returns it to the Zoning Officer for review.
    • If work is not substantially completed within one year after issuance, the permit expires and is cancelled.

    permit completion period: 1 year (If not substantially completed, the permit expires and is cancelled.)

    “The landowner requesting the Building/Use Permit shall complete an application for a building/Use permit, accompanied with the appropriate fee, available from the Administration Official. Completed applications shall be returned to the Zoning Officer for review”

South Dakota rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    An individual owner personally installing electrical wiring and fixtures in a residence or farmstead owned and resided in by that individual.

    • The exemption is from electrical licensure requirements, not from permitting or inspection.
    • An approved homeowner permit must be obtained before electrical work begins.
    • The exemption does not apply to commercial or rental property.
    • Mobile-home and modular-home installations are allowed only when the unit is on an owner-occupied lot at the time of installation; otherwise a licensed South Dakota electrical contractor is required.
    • A final inspection is required before occupancy.
    “an "owner's exemption" as an exemption from licensure requirements”
  • InspectionsRequired

    Plumbing installations in South Dakota outside cities that administer their own plumbing inspection requirements.

    • The exception is for cities with their own inspection requirements.
    • Inspection requests generally require at least 72 hours advance notice, excluding weekends and holidays.
    • Inspections occur after a plumbing installation certificate is secured.

    installation certificate fee: 20 USD · single-family inspection fee: 110 USD · small-structure inspection fee: 100 USD (Five or fewer fixtures.) · large-structure inspection fee: 275 USD (Six or more fixtures.)

    “You must have a plumbing inspection certificate for all plumbing installations.”
    One more reviewed finding on this topic
  • Who permits septicState

    Individual and small on-site wastewater systems statewide in South Dakota.

    • The South Dakota Department of Agriculture and Natural Resources secretary or authorized representative administers the state on-site wastewater requirements.
    • The state rules are minimum requirements; local governments may impose more stringent requirements, according to the DANR permitting guide.
    “The authority for regulating on-site wastewater systems is found in SDCL Chapter 34A-2.”
  • Off-grid sanitationAllowed (with conditions)

    Unconventional off-grid sanitation systems where a water or electrical system is unavailable statewide.

    • Vault privies, chemical toilets, incinerator toilets, or composting units must be used when a water or electrical system is unavailable.
    • Except for vault privies, all unconventional systems are experimental systems and require plans and specifications submitted to the secretary for approval before installation.
    “all unconventional systems are considered experimental systems”
  • Well permitLimited

    Water-well drilling and proposed water uses statewide in South Dakota.

    • A water-right permit is required only for proposed water uses that fall within the permitting requirements; the official page directs applicants to the Using Water in SD page to determine whether a permit is needed.
    • When a water-right permit is required, state law requires approval before well drilling.
    • The chief engineer may permit construction of a test well before obtaining the water-right permit; the test well may serve as the production well if the application is approved.
    • A water-right permit, when required and approved, provides five years to construct the water-use system and an additional four years to place all water to beneficial use.
    • A well driller's license is required before drilling any well or contracting to drill a well.

    construction period after water-right permit approval: 5 years · period to place water to beneficial use: 4 years

    “If a water right permit is needed, state law requires the permit to be approved prior to doing any well drilling.”
    One more reviewed finding on this topic
    • Limited — Water wells and water uses serving Hamlin County.
      “Domestic use of water from other than a common water distribution system that does not exceed 25,920 gallons per day (which is 18 gpm pumped 24 hours per day) or a peak diversion rate of 25 gallons per minute (gpm)”
  • Agricultural exemptionAvailable (with conditions)

    Farmsteads and accessory structures or buildings thereto under South Dakota's default construction-design standard when the local unit of government has not adopted an ordinance prescribing standards under SDCL 11-10-5.

    • The default standard applies to building work commenced after July 1, 2026.
    • The local unit of government may adopt an ordinance allowing local administration and enforcement of the design standard.
    • The exclusion is from SDCL 11-10-6's default 2024 International Building Code design standard; it does not establish that all local zoning, building, occupancy, or other requirements are waived.
    • The statute defines farmstead as a farm or ranch, including any structure or building located on the land.
    • Residential structures and mobile or manufactured homes are also excluded from this specific default-standard provision.

    construction commencement date: > 2026-07-01 (The provision applies to buildings commenced after July 1, 2026.) · building standard: 2024 International Building Code (The default standard does not apply to a farmstead or accessory structure or building thereto.)

    “farmstead and any accessory structure or building thereto.”
  • Driveway accessLimited

    New or modified driveways and intersections connecting to South Dakota state highways.

    • Permission from the South Dakota Department of Transportation is required for access to a state highway.
    • The application may require an access approach design, vicinity map, estimated traffic volumes, three copies of a site plan, traffic-control plan, liability insurance, development plan, drainage plan, traffic-impact study, and revegetation plan.
    • Construction cannot begin until the access permit is issued.
    • The permittee pays construction, maintenance, and removal costs.
    • The permit expires if access is not under construction within one year, subject to one written one-year extension.
    • Access construction must be completed within 45 days after initiation within the highway right-of-way.

    application review update threshold: 30 days (If the application is not completed within 30 days, a Department employee will contact the applicant with an update.) · construction completion period: 45 days (Measured from initiation of construction within the highway right-of-way.)

    “Construction of the access shall not proceed until the access permit is issued. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from the initiation of construction within the highway right-of-way.”
  • Building in a floodplainRequired

    Development in floodplains within South Dakota communities participating in the National Flood Insurance Program, including incorporated and unincorporated areas administered separately by local governments.

    • Participating communities must adopt and enforce a flood-damage-prevention ordinance.
    • Permits are required for all types of development in the floodplain.
    • New or substantially improved homes and manufactured homes must be elevated above the Base Flood Elevation.
    • Non-residential buildings must be elevated or flood-proofed.
    • Elevation Certificates are required to document compliance.
    • NFIP participation and eligibility are established separately for incorporated and unincorporated areas; the source does not establish a single uniform permit process for every South Dakota location.
    “Require permits for all types of development in the floodplain.”
  • Permit feesPublished (with conditions)

    South Dakota state electrical wiring permits, including residential and farmstead wiring subject to state administration.

    • A wiring permit is required for electrical service entrances over 60 amperes, owner-exemption wiring, and other installations with an estimated inspection fee of at least $30.
    • Local inspection systems may have their own procedures, inspection fees, and regulations.
    • Inspection fees are separate from the $20 wiring-permit fee.

    wiring permit fee: 20 USD · permit validity: 3 years (A new permit is required if the installation extends beyond three years.) · late permit administrative fee: 250 USD (Applies when the permit is not dated at job start or is not renewed before expiration.)

    “A wiring permit may be obtained for twenty dollars from the commission office. A wiring permit is valid for three years from the date the permit is issued.”
  • county zoning authorityGeneral

    South Dakota county boards' authority to adopt zoning ordinances, including for unincorporated county land.

    • The authority is granted for promoting the health, safety, or general welfare of the county.
    • The statute authorizes regulation of building and land-use characteristics including height, number of stories, building and structure size, lot coverage, yards, courts, open spaces, population density, and locations and uses of buildings, structures, and land.
    • The authorized purposes expressly include trade, industry, residence, flood plain, and other purposes.
    • This claim identifies statewide enabling authority; whether a particular county has adopted an ordinance is a separate local question.
    “For the purpose of promoting health, safety, or the general welfare of the county the board may adopt a zoning ordinance to regulate and restrict the height, number of stories, and size of buildings and other structures, the percentage of lot that may be occupied, the size of the yards, courts, and other open spaces, the density of population, and the location and use of buildings, structures, and land for trade, industry, residence, flood plain, or other purposes.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Building code adopted — General building-code adoption for unincorporated Hamlin County.
  • Certificate of occupancy — Certificates of occupancy in unincorporated Hamlin County.
  • Building height — Building-height limits in unincorporated Hamlin County.
  • Living in an RV — Long-term recreational-vehicle occupancy on private land in unincorporated Hamlin County.
  • Camping on your land — Temporary camping on private land in unincorporated Hamlin County.
5 more unanswered
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Mandatory utility hookup
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Hamlin County, South Dakota

Is Hamlin County a good place to live off-grid or homestead?

Hamlin County scores 48/100 on the Bolthole Index, a solid county profile. Its strengths: sparse surroundings — about 4,413 people within a 30-minute drive and manageable long-term carry cost. Watch-outs: workable self-sufficiency basics (25.3″/yr rainfall).

Do you need a building permit in Hamlin County, South Dakota?

Hamlin County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by South Dakota Department of Agriculture and Natural Resources (DANR). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Hamlin County, South Dakota?

Land in Hamlin County runs about $5,101 per acre, based on the latest county data.

What is the water situation in Hamlin County?

Hamlin County gets about 25.3" of rain a year, with severe drought in roughly 4.9% of years.

How remote is Hamlin County?

A representative private-land location has about 4,413 people within a 30-minute drive and 522,372 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Hamlin County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Hamlin compares in South Dakota

Compare side-by-side →See all 66 South Dakota counties ranked →