Bolthole Index

Douglas County, South Dakota

Building permits, zoning and septic rules in Armour, South Dakota

Armour, South Dakota requires a building permit from the City Council to erect, alter, repair or remove any building inside city limits1. Douglas County's zoning ordinance excludes Armour2, and we could not confirm whether the city has its own zoning. Private septic systems are tightly limited where city sewer is available3, and any that is allowed needs a city permit4.

At a glance

Building permit
Required from the Armour City Council1
Building code
City has adopted the Uniform Housing Code for residential buildings5
Zoning
Not under the county ordinance; city zoning unconfirmed2
Septic
City permit signed by the City Superintendent, only where city sewer is unavailable43
Septic permit fee
$25 permit and inspection fee6
Water and sewer
Connection to city water and sewer required7

Who to call

Building permits

City of Armour Finance Office (City Hall)

City hall front desk for Armour; the city's website posts the building permit application here

(605) 724-2167

PO Box 415, Armour, SD 57313

Septic permits

South Dakota Department of Agriculture and Natural Resources

Statewide on-site wastewater rules that apply under any city permit

605-773-5559

523 E Capitol Ave, Pierre, SD 57501-3182

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Armour means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Armour, South Dakota?

Yes. Inside Armour city limits, anyone who wants to erect, alter, repair or remove a building applies to the City Council for a permit and supplies plans and specifications detailed enough for the Council to judge compliance with the city's building regulations1. A granted permit is signed by the mayor and the city finance officer, and the city supplies a permit card to display on the property8.

The city has also adopted the Uniform Housing Code for the use, occupancy, location and maintenance of residential buildings and structures5. We could not confirm a general building-inspection requirement, a certificate of occupancy, or an owner-builder exemption in the city code, so ask city hall before you assume any of them. Electrical work is a separate matter: South Dakota requires an approved homeowner permit before an owner starts wiring work9.

Who issues building permits in Armour, and how do you reach them?

The Armour City Council grants building permits, and the city finance office at City Hall handles the paperwork1. The city's website posts a building permit application on its finance office page10. Call10 at (605) 724-2167 or write to PO Box 415, Armour, SD 57313.

Douglas County's Zoning Administrator issues building permits only for unincorporated land, not inside Armour2. If your parcel is outside city limits, use the Douglas County page instead.

Does Armour have zoning, and what does it mean for RVs, tiny homes and setbacks?

The Douglas County zoning ordinance expressly excludes the incorporated community of Armour2, so its districts and setbacks do not apply to city lots. We could not confirm whether Armour adopts its own zoning districts, and the city code we reviewed publishes no lot-size, setback or height schedule. Nothing here should be read as meaning the city has no rules.

The same gap applies to RV living, tiny homes, manufactured homes and accessory dwellings: we found no city rule on any of them. Ask City Hall at10 before you park an RV on a lot or place a manufactured or tiny home. The county's camping and setback limits cover only unincorporated land2.

How do septic permits and wells work inside Armour?

Armour steers buildings onto city water and sewer. Residential and commercial buildings inside city limits must connect to the city water and sewer system7, and building a new well, cistern, privy, septic tank or cesspool in a residential or commercial building after 2004 is unlawful unless city services are deemed unavailable for the property3. The same rule limits new drinking-water wells11.

Where services are unavailable and a private wastewater system is allowed, the owner must first get a written permit signed by the City Superintendent4, filed on a city form with a $25 permit and inspection fee12. Once a city line becomes available, the owner must connect and stop using the private system within 30 days7. The state's on-site wastewater rules still set minimum standards13; contact14 for system design questions.

Building a home in Armour: the steps, in order

  1. Confirm the parcel is inside Armour city limits; if not, the county rules apply instead2.
  2. Ask City Hall whether city water and sewer reach the lot, because that decides whether a private septic system or well is even allowed7.
  3. Apply to the City Council for a building permit with plans and specifications1.
  4. If city sewer is unavailable, get the written septic permit from the City Superintendent before construction starts4.
  5. Pull the state homeowner electrical permit before wiring begins, and schedule the final electrical inspection before anyone moves in15.
  6. Display the city's building permit card on the property8.

What stays with Douglas County, and what to check before you buy in Armour?

Douglas County does not zone, permit or inspect inside Armour2; land outside the city is covered on the Douglas County page. Statewide rules still reach city lots: plumbing installations need a state inspection certificate outside cities that run their own plumbing inspection16, so ask City Hall which applies.

We could not confirm floodplain rules, driveway or street-access permits, or subdivision rules for land inside the city. Farmland in Douglas County averages about $4,554 per acre17, and the typical home value is about $125,00018. Douglas County's effective property tax rate is 1.2%19.

Watch-outs

  • Do not assume city lots follow the Douglas County zoning ordinance; it excludes Armour2.
  • A private septic tank or well on a city lot is only possible where city services are deemed unavailable, and the owner must connect within 30 days once a city line arrives7.
  • We could not confirm city rules on zoning districts, RV occupancy, tiny homes, floodplain development or inspections; ask City Hall at10 before buying.

Sources

  1. Armour Code § 150.14, Building Permits (Armour), quoted and re-checked
  2. Douglas Zoning updated 3_2024, quoted and re-checked
  3. Armour Code § 51.03, Use of Municipal Water and Sewer System Required (Armour), quoted and re-checked
  4. Armour Code § 52.06, Private Sewer Permit (Armour), quoted and re-checked
  5. Armour Code § 150.02, Adoption of Uniform Code (Armour), quoted and re-checked
  6. Armour Code § 52.06, Private Sewer Permit (Armour), quoted and re-checked
  7. Armour Code § 51.03, Use of Municipal Water and Sewer System Required (Armour), quoted and re-checked
  8. Armour Code § 150.14, Building Permits (Armour), quoted and re-checked
  9. South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
  10. City of Armour Finance Office (City Hall) (armoursd.com)
  11. Armour Code § 51.03, Use of Municipal Water and Sewer System Required (Armour), quoted and re-checked
  12. Armour Code § 52.06, Private Sewer Permit (Armour), quoted and re-checked
  13. On-Site Wastewater Systems in South Dakota (South Dakota statewide rule), quoted and re-checked
  14. South Dakota Department of Agriculture and Natural Resources (danr.sd.gov)
  15. South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
  16. South Dakota Plumbing Commission - Inspections (South Dakota statewide rule), quoted and re-checked
  17. Farmland value per acre (USDA census): Bolthole Index county data
  18. Typical home value (Zillow): Bolthole Index county data
  19. Effective property tax rate: Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Armour

Armour’s own rules

  • Building permitRequired

    Any building erected, altered, repaired, or removed inside Armour city limits.

    • Applicant must apply to the City Council.
    • Applicant must furnish plans and specifications sufficient for the City Council to determine compliance with Chapter 150.
    • If granted, the permit is signed by the mayor and city finance officer.
    • The City supplies a building permit to be displayed on the property.
    “Any person desiring to erect, alter, repair or remove any building shall apply to the City Council for a permit for such purpose, and furnish a plan and specification sufficient to enable the City Council to determine whether such building, alteration or repair is in compliance with the provisions of this chapter, and, if granted, such permit shall be signed by the mayor and city finance officer. A building permit to be displayed on the property will be supplied by the City of Armour.”
  • Building code adoptedAdopted (with conditions)

    Residential buildings and structures within Armour city.

    • The adopted Uniform Housing Code regulates use and occupancy, location, and maintenance of residential buildings and structures.
    “The Uniform Housing Code, in its entirety, and all acts amendatory thereto, is and are hereby adopted by the city for the regulation of use and occupancy, location and maintenance of all residential buildings and structures within the city.”
  • Who permits septicLocal (with conditions)

    Private wastewater disposal systems inside Armour city limits.

    • A written permit must be signed by the City Superintendent before construction begins.
    “Before commencement of construction of a private wastewater disposal system, the owner(s) shall first obtain a written permit signed by the City Superintendent.”
  • Septic permitRequired

    Construction of a private wastewater disposal system inside Armour city limits.

    • Permit must be obtained before construction.
    • Application is on a city-furnished form and must be supplemented with plans, specifications, and other information the Superintendent deems necessary.

    private sewer permit and inspection fee: 25 USD (Paid to the city when the application is filed.)

    “Before commencement of construction of a private wastewater disposal system, the owner(s) shall first obtain a written permit signed by the City Superintendent.”
  • Off-grid sanitationLimited

    Residential and commercial buildings inside Armour city limits.

    • A septic tank, cesspool, privy, or other disposal facility may not be constructed, plumbed, or hooked up after January 1, 2004 unless city services are deemed unavailable for the property.
    • When city water or sewer becomes available, service must be connected within 30 days and private sewage-system use must cease.
    “It shall be unlawful to construct, plumb or hook up any well for drinking water, cistern, privy, septic tank, cesspool or other disposal facility in any residential or commercial building within the city limits after January 1, 2004, unless those services are deemed to be “unavailable” for the property.”
  • Well permitLimited

    Drinking-water wells serving residential or commercial buildings inside Armour city limits.

    • Construction, plumbing, or hook-up after January 1, 2004 is unlawful unless city services are deemed unavailable for the property.
    • When city water or sewer becomes available, city service must be connected and private water use must cease within 30 days.
    “It shall be unlawful to construct, plumb or hook up any well for drinking water, cistern, privy, septic tank, cesspool or other disposal facility in any residential or commercial building within the city limits after January 1, 2004, unless those services are deemed to be “unavailable” for the property.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Residential and commercial buildings within Armour's incorporated limits.

    • Connection is not required where services are deemed unavailable for the property.
    • When a city water or sewer line becomes available, city service must be connected and commenced within 30 days and private water or sewage use must cease.
    • The restriction on constructing or hooking up private facilities applies after January 1, 2004.

    connection deadline after city line becomes available: <= 30 days (City service shall be connected and commenced, and private water or sewage use shall cease.)

    “Except as hereinafter set forth, all residential and commercial buildings within the incorporated limits of the city shall be required to be connected to the city water and sewer system.”
  • Permit feesPublished (with conditions)

    City private-wastewater-disposal permits inside Armour city limits.

    • The fee is paid to the city when the application is filed.

    private sewer permit and inspection fee: 25 USD (Private wastewater disposal-system permit.)

    “A permit and inspection fee of $25 shall be paid to the city at the time the application is filed.”
  • Permit processPublished (with conditions)

    Building permits inside Armour city limits.

    • Application is to the City Council.
    • Plans and specifications must be sufficient for the City Council to assess compliance with Chapter 150.
    • If granted, permit is signed by the mayor and city finance officer.
    “Any person desiring to erect, alter, repair or remove any building shall apply to the City Council for a permit for such purpose, and furnish a plan and specification sufficient to enable the City Council to determine whether such building, alteration or repair is in compliance with the provisions of this chapter, and, if granted, such permit shall be signed by the mayor and city finance officer.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Armour or Douglas County directly.

  • Owner-builder exemption — Owner-built structures inside Armour city limits.
  • Inspections — Building construction inside Armour city limits.
  • Certificate of occupancy — Buildings inside Armour city limits.
  • Local zoning — Land inside Armour city limits.
  • Zoning districts — Zoning districts inside Armour city limits.
16 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Armour publishes no rule on the point, not that none exists. Douglas County’s page lists the county offices to call.

← All of Douglas County: county rules, score and offices