Spring Garden Township, York County, Pennsylvania requires a permit to build or alter any building or structure, and the township issues it1. The township writes and enforces its own zoning through Chapter 3102. Septic permits come from a separate local sewage agency, normally the township's sewage enforcement officer, not the county planning office3.
At a glance
- Building permit
- Required to build or alter any building or structure; issued by the township1
- Who issues it
- Spring Garden Township administration, with plan review and inspections by a third-party agency4
- Zoning
- Township zoning with R-1, R-2, A-O, C, IP, OS and Floodplain districts25
- Septic
- Permit from the local agency before installing or using an on-lot system63
- Decision time
- Single- and two-family permits are granted or refused within 15 days of application7
- RV or tiny home living
- Not confirmed; ask the township zoning office4
- Owner-builder
- Statewide home-improvement law excludes an owner's own uncompensated work, but permits still apply8
- Farm buildings
- Farm buildings are a by-right use only in the OS zone9
Who to call
Building permits
Spring Garden Township Administration (building and zoning permits)
Building permit and zoning permit applications and permit pickup inside Spring Garden Township; plan review and inspections run through a third-party agency
340 Tri Hill Road, Suite A, York, PA 17403
Septic permits
Spring Garden Township sewage enforcement (on-lot sewage systems)
On-lot (septic) system questions; the township page points to the local agency's Sewage Enforcement Officer
Planning & zoning
York County Planning Commission
County planning information and referrals to the correct municipal permit office; it does not issue building permits
28 E Market Street, 3rd Floor, York, PA 17401
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Spring Garden Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Spring Garden Township, PA?
Yes. Spring Garden Township makes it unlawful to build or alter any building or structure in the township without a permit1. The township will refuse a permit unless the plan meets the Chapter 310 setbacks, provides surface drainage, has an approved and recorded subdivision plan and has any required sewerage permits1.
A permit lapses if work does not begin within 90 days or finish within one year, with extensions up to two years1. The township must grant or refuse an application for a single-family or two-family dwelling within 15 days, and within 30 days for other structures7.
The township's page lists two kinds of approval: a building permit for work under the State Building Code that needs inspections, and a zoning permit for smaller jobs that typically need none4. Replacing windows or doors of the same size and location is one job the township says needs no permit4.
Who issues building permits in Spring Garden Township, and how do you reach them?
The township issues them. Applications go to Spring Garden Township Administration at 340 Tri Hill Road, Suite A, York, PA 17403, phone (717) 848-28584. The township's plan review and inspections are handled by Code Administrators, a third-party agency that invoices its plan-review and inspection fees separately; to schedule an inspection, call 717-859-33504.
The York County Planning Commission does not issue building permits, so a call to the county planning counter will only send you back to the township10.
Additional impervious surfaces such as patios, driveways, sheds and garages need a Stormwater Management Permit Application alongside the building or zoning permit4. The township's fee schedule sits on its Forms & Permits page; we could not confirm the dollar amounts, so ask the township office before you budget7.
Does Spring Garden Township have zoning, and what does it mean for lot size and setbacks?
Yes. Spring Garden Township divides its land into zones on an official zoning map, and Chapter 310 of the township code governs them2. The districts are R-1, R-2, A-O, C, IP, OS and Floodplain5.
The numbers depend on the district. In R-1 Residential Suburban, minimum lot area is 10,000 square feet with public water and sewer, 15,000 with one of the two and 30,000 with neither11. R-1 setbacks are 25 feet front, 10 feet each side and 25 feet rear12. In R-2 Residential Urban, minimum lot area is 7,500 square feet with public water and sewer and 10,000 with only one of them, and setbacks are 20 feet front, 5 feet each side and 20 feet rear1314. In the OS Open Space zone, every use needs at least 2 acres, and setbacks are 50 feet front and 40 feet on each side and rear1516.
Check the zoning map for your parcel's district before you rely on any of these figures.
How do septic permits work in Spring Garden Township?
A building served by an on-lot sewage system needs a permit from the local agency before the system is installed, built, occupied or used6. In Pennsylvania the local agency is a municipality, a group of municipalities or a county health department17. The township's own page says the contact is normally the local township's Sewage Enforcement Officer3.
We could not confirm from the township's sewer chapter whether your address must connect to public sewer instead, or what the township's local septic permit steps and fees are. Ask the township office before you plan a drain field4. For wells, Pennsylvania requires drilling companies, not homeowners drilling their own well, to hold a license and permits18.
York County soils rate poorly for conventional drain fields: only 18.2% are rated not limited, so expect a site evaluation and possibly an engineered system19.
Can you live in an RV or tiny home in Spring Garden Township?
We could not confirm that Spring Garden Township allows living in an RV or a tiny home on a lot, and the township's zoning chapter is where the answer lives. The township zoning office can tell you whether either is allowed in your district4.
One rule is clear. A mobile home park is allowed only as a special exception in the A-O zone, approved by the zoning hearing board, and single-family districts do not list mobile homes among their by-right uses20. Pennsylvania's rules for RV stays at state park campgrounds do not answer whether you can live in an RV on your own lot21.
Any dwelling that moves onto a lot also falls under the township's building permit and, for manufactured housing, under the state building code for site preparation, foundations and occupancy changes22.
Building a home in Spring Garden Township: the steps, in order
- Confirm your parcel's zoning district and its lot, setback and coverage rules on the township zoning map5.
- If the land is being subdivided, the final plan must be approved and recorded before a building permit can issue23.
- Get sewerage approvals in place, because the township will not issue a building permit without required sewerage permits1.
- File the building permit application with a lot drawing at Spring Garden Township Administration14.
- Pay plan-review and inspection fees to Code Administrators, then the township fees when you pick up the permit4.
- Schedule inspections through Code Administrators4.
- Get the certificate of occupancy; Pennsylvania's code says a residential building may not be occupied without one24.
What stays with York County, and what to check before you buy?
York County does not issue building permits and does not administer township zoning; zoning and land-use policy belongs to the municipalities25. Land outside Spring Garden Township is covered on the York County page.
Before you buy, check four things. First, the township zoning district and any floodplain overlay; the township lists Floodplain as its own zone5. Second, whether you can get public sewer, or whether an on-lot system is needed3. Third, a driveway onto a state road needs a PennDOT highway occupancy permit26. Fourth, York County's effective property tax rate is 1.7%27.
Watch-outs
- Permit fees are set by the township's board and listed on its Forms & Permits page; we could not confirm the amounts, so ask Spring Garden Township Administration7.
- A farm building is exempt from the OS zone's 35 foot height limit only; the township's code lists no general exemption from building permits for farm buildings9.
- Do not assume the state's agricultural-building exclusion removes zoning review; municipal zoning requirements can still apply28.
- An owner doing their own uncompensated work is excluded from the state home-improvement law, but that does not waive building-permit or zoning requirements8.
Sources
- Spring Garden Township Code Ch. 120 Building Construction, Art. I (§§ 120-3 to 120-12) (Spring Garden Township), quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Spring Garden Township sewage enforcement (on-lot sewage systems) (springgardentwp.org)
- Spring Garden Township Administration (building and zoning permits) (springgardentwp.org)
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
- Spring Garden Township Code Ch. 120 Building Construction, Art. I (§§ 120-3 to 120-12) (Spring Garden Township), quoted and re-checked
- Home Improvement Consumer Protection Act, quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- York County Planning Commission (ycpc.org)
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- Act 537 Sewage Facilities (Pennsylvania statewide rule), quoted and re-checked
- Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Spring Garden Township Code Ch. 310 Zoning, Art. II Zone Regulations (§§ 310-4 to 310-11) (Spring Garden Township), quoted and re-checked
- RV and Tent Campsites (Pennsylvania statewide rule), quoted and re-checked
- Pennsylvania Uniform Construction Code, Chapter 403 (Pennsylvania statewide rule), quoted and re-checked
- Township of Spring Garden, PA code table of contents (eCode360) (Spring Garden Township), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Data Center Development in York County, quoted and re-checked
- Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.