Licking Creek Township in Fulton County, Pennsylvania requires a UCC building permit before covered construction begins.1 The township is an opt-in UCC municipality, while its Sewage Enforcement Officer handles local on-lot sewage administration.23 The township also regulates subdivision and land development.4
At a glance
- Building permit
- Required before construction covered by Pennsylvania's UCC1
- Building office
- The state lists Licking Creek Township as an opt-in UCC municipality2
- Zoning
- County materials identify only McConnellsburg Borough as zoned; confirm parcel rules with the township56
- Septic
- On-lot sewage permits go through the township's Sewage Enforcement Officer37
- Subdivision
- The township has a subdivision and land-development ordinance4
- RV or tiny home
- Occupancy rules could not be confirmed; ask the township and sewage officer68
Who to call
Building permits
Licking Creek Township Building Code Official
UCC building-code administration for opt-in Licking Creek Township
Planning & zoning
Licking Creek Township Municipal Office
Township land-use, subdivision, stormwater, floodplain and municipal questions
966 Forrestdale Road, Harrisonville, PA 17228
Septic permits
Licking Creek Township Sewage Enforcement Officer
On-lot sewage permitting and enforcement inside Licking Creek Township
PO Box 240, Mercersuburg, PA 17236
Planning & zoning
Fulton County Planning & Mapping Department
County subdivision review, planning, mapping and parcel-orientation questions
116 West Market Street, Suite 203, McConnellsburg, PA 17233
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Licking Creek Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Licking Creek Township, Pennsylvania?
Yes. Licking Creek Township requires a UCC building permit before construction or building work covered by Pennsylvania's Uniform Construction Code begins.1 Pennsylvania's statewide UCC applies to building projects in the township.9
Pennsylvania lists Licking Creek Township as an opt-in UCC municipality and provides a phone number for its Building Code Official.2 Call that office before starting work to confirm the correct application, current fee, plan requirements and inspection schedule. Township-specific building-permit fees could not be confirmed.
Covered work requires inspections, including applicable foundation, building-system, framing, wallboard and final inspections.10 A residential building may not be occupied until a building code official issues a certificate of occupancy.11
Does Licking Creek Township have zoning, lot-size or setback rules?
Fulton County planning materials identify McConnellsburg Borough as the county's only municipality with a zoning code, but the official Licking Creek Township page does not explicitly state that the township has no zoning.5 Ask the Township Office to confirm the current zoning status and any parcel-specific limits before relying on an RV, tiny home, accessory dwelling, setback, lot-size, lot-coverage or building-height assumption.6
Licking Creek Township does regulate subdivision and land development under its township ordinance.4 The township page also publishes a land-use permit and stormwater and floodplain ordinances, so the absence of a confirmed zoning ordinance does not eliminate local development review.126
Fulton County Planning Commission reviews and comments on subdivision plans, but municipal approval remains with the township.13 Contact Fulton County Planning & Mapping for county plan-review and mapping questions.14
How do septic permits work inside Licking Creek Township?
Licking Creek Township's Sewage Enforcement Officer is the local contact for on-lot sewage permitting and enforcement.38 Pennsylvania law generally requires a permit before installing, constructing, altering, repairing or connecting to an individual or community sewage system, subject to statutory exceptions.7
Make sewage feasibility an early purchase contingency: only 3.9% of Fulton County soils are rated without severe limitations for a conventional septic drain field.15 That county-level soil measure does not determine whether a particular Licking Creek Township parcel will pass a site evaluation.
Ask the Sewage Enforcement Officer about testing, system design, application steps, inspections and current fees before fixing the house location.8 We could not confirm a township-specific recurring septic-inspection schedule or whether a proposed off-grid sanitation method would qualify.
Can you live in an RV or tiny home in Licking Creek Township?
We could not confirm a Licking Creek Township rule that resolves long-term RV occupancy, temporary camping, a tiny home on wheels or a manufactured home on a particular parcel. Ask the Township Office how the proposed use is classified and ask the Sewage Enforcement Officer what sewage approval is required before using any unit as living quarters.68
A tiny home that qualifies as a residential building can still require a UCC building permit, inspections and a certificate of occupancy.11011 Approved sewage disposal may also be required.7
Do not treat the lack of a located zoning schedule as occupancy approval. Confirm land-use review, sewage disposal, floodplain status and road access for the specific parcel with the Township Office.6
Building a home in Licking Creek Township: what are the steps?
- Call the Licking Creek Township Building Code Official for the correct UCC building-permit application, current fee and plan requirements.2
- Contact the Sewage Enforcement Officer before fixing the house location and obtain the required on-lot sewage approval.37
- Ask the Township Office whether the proposal needs a land-use permit or triggers subdivision, land-development, stormwater or floodplain review.1246
- Resolve access before requesting a county street address; Fulton County requires the driveway access to be marked for address assignment.16 Access connecting to state-highway land requires a PennDOT Highway Occupancy Permit.17
- Obtain the UCC building permit before covered work begins and schedule required inspections as work progresses.110
- Obtain the certificate of occupancy before using the completed residential building.11
What should you check before buying land in Licking Creek Township?
Confirm the parcel record, road ownership and whether a split or development proposal requires township approval and county planning review.413 Fulton County Planning & Mapping can help with county maps and review questions.14
Check sewage feasibility before treating a buildable-looking field as a homesite because Fulton County's soil rating is unfavorable for conventional drain fields.15 Ask the Sewage Enforcement Officer about the parcel's testing and permit path.8
For a private well, Pennsylvania's commercial driller licensing and permit rule does not apply to a homeowner drilling on owned or leased land, but we could not confirm a separate Licking Creek Township well rule.18 Ask the Township Office before drilling.6 Floodplain development requires sealed documentation under the UCC, and state-highway access can require a separate PennDOT permit.1917
Watch-outs
- A land-use permit or subdivision review can apply separately from the UCC building permit.124
- Only 3.9% of Fulton County soils are rated without severe limitations for a conventional septic drain field, so check sewage feasibility before committing to a homesite.15
- Long-term RV occupancy, temporary camping and tiny-home-on-wheels rules remain unconfirmed; ask the Township Office and Sewage Enforcement Officer before relying on any of those uses.68
- Township-specific building and land-use fee schedules could not be confirmed; request current amounts from the Building Code Official and Township Office.26
Sources
- Apply for a Uniform Construction Code Building Permit (Licking Creek Township), quoted and re-checked
- Licking Creek Township Building Code Official (pa.gov)
- Licking Creek Township (Licking Creek Township), quoted and re-checked
- Licking Creek Township (Licking Creek Township), quoted and re-checked
- Planning FAQ, quoted and re-checked
- Licking Creek Township Municipal Office (co.fulton.pa.us)
- Sewage Facilities Act (Licking Creek Township), quoted and re-checked
- Licking Creek Township Sewage Enforcement Officer (co.fulton.pa.us)
- Uniform Construction Code (UCC) (Licking Creek Township), quoted and re-checked
- 34 Pa. Code Chapter 403 (Licking Creek Township), quoted and re-checked
- 34 Pa. Code Chapter 403 (Licking Creek Township), quoted and re-checked
- Licking Creek Township | Fulton County, PA (Licking Creek Township), quoted and re-checked
- Fulton County Planning Commission Subdivision/Land Development Review Policy, quoted and re-checked
- Fulton County Planning & Mapping Department (co.fulton.pa.us)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Planning Services | Fulton County, PA (Licking Creek Township), quoted and re-checked
- Apply for a PennDOT Highway Occupancy Permit, quoted and re-checked
- Apply for a Water Well Drillers License and Rig Permit, quoted and re-checked
- Apply for a Uniform Construction Code Building Permit (Licking Creek Township), quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.