Bolthole Index

Columbia County, Pennsylvania

Zoning, building permits and septic rules in Catawissa Borough, Pennsylvania

Catawissa Borough in Columbia County, Pennsylvania has its own zoning ordinance, adopted in 1974, so the borough rather than the county decides land use inside its limits1. Building work falls under Pennsylvania's Uniform Construction Code, which requires a permit before construction starts2. Septic permits come from a local sewage agency under state rules, not from the zoning office3.

At a glance

Zoning
Yes, a borough zoning ordinance adopted in 19741
Zoning districts
R-1, R-2, B-1, I-1 and C-14
Building permit
Required under the Pennsylvania Uniform Construction Code2
Septic permit
Required from a local agency before installation3
Floodplain
Limited development rules apply in identified floodplain5
Owner-builder
Pennsylvania has no general contractor license requirement for owners working on their own primary residence6

Who to call

Zoning

Borough of Catawissa (zoning and code ordinances)

Borough zoning ordinance, Chapter 345; the borough's own code lists a building permits chapter

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of Catawissa means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Catawissa, PA have zoning, and what does it mean for your lot?

Catawissa Borough has a zoning chapter that regulates the location and use of buildings and land inside the borough, adopted in 19741. The borough divides its land into residential districts R-1 and R-2, central commercial B-1, light industrial I-1 and a C-1 conservation area4.

Lot size, yard setbacks and building height are set district by district in the ordinance's area and bulk schedule, so the answer for a given lot depends on which district it sits in789. We did not confirm the figures themselves; read the area and bulk schedule in the borough's zoning chapter or ask the borough's zoning officer for your parcel's district. Whether recreational vehicles or tiny homes may be lived in within each district is also unconfirmed here, so ask before you plan on it.

Do you need a building permit in Catawissa, and who issues it?

Pennsylvania's Uniform Construction Code requires a permit before residential construction and regulated electrical, gas, mechanical and plumbing work begins in municipalities that enforce it2. Most Pennsylvania municipalities administer the code themselves, and the state's Department of Labor and Industry handles it only where a municipality has opted out10.

We could not confirm which office or third-party agency issues building permits inside Catawissa Borough. The borough's code lists a building permits chapter that we did not read, so call the borough office to learn who takes the application. Inspections and a certificate of occupancy follow the permit1112. Qualifying farm buildings can be exempt under the code13.

How do septic permits work in Catawissa?

A building served by an on-lot sewage system needs a permit from the local sewage agency before the system is installed3. In Pennsylvania that agency may be a municipality, a group of municipalities or a county health department, and the work is done by a certified sewage enforcement officer14.

We could not confirm which agency covers Catawissa Borough, or whether your lot is on public sewer, since the borough's code includes a sewers chapter we did not read. Ask the borough office whether your address connects to public sewer before you plan a septic system. Columbia County's soils matter too: the share of soils rated not limited for a conventional drain field is low, so expect a site evaluation15.

Building a home in Catawissa: the steps, in order

  1. Confirm the zoning district for the parcel and its yard and height limits with the borough48.
  2. Check whether the lot lies in an identified floodplain, where new residential construction must sit at or above the regulatory flood elevation5.
  3. Settle sewer or septic: ask about public sewer, otherwise obtain a local agency septic permit before installing a system3.
  4. Get the Uniform Construction Code building permit before work begins2.
  5. If the driveway meets a state road, a PennDOT highway occupancy permit is required16.
  6. Pass the required inspections and obtain a certificate of occupancy before moving in12.

What stays with Columbia County, and what to check before you buy

Zoning inside the borough is the borough's decision; the county's subdivision and land development ordinance applies only to municipalities without their own17. For land outside the borough, see the Columbia County page.

Before buying, confirm the zoning district, sewer or septic status and floodplain mapping for the parcel. Columbia County's effective property tax rate is about 1.1%18, and the median property tax bill is about $2,266 per year19.

Watch-outs

  • We could not confirm the borough office, phone number or code officer for Catawissa; ask the borough office which office issues building permits and zoning approval, since the borough's own zoning ordinance governs land inside it1.
  • Floodplain parcels carry extra rules: no new construction within the stated distance of a stream bank without a state DEP permit5.
  • Catawissa Township's offices do not serve the borough; the borough's own zoning ordinance applies inside borough limits1.

Sources

  1. Catawissa Borough Code Ch. 345 Zoning, Art. I (Borough of Catawissa), quoted and re-checked
  2. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  3. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  4. Catawissa Borough Code Ch. 345 Zoning, Art. IV Establishment of District Zones (Borough of Catawissa), quoted and re-checked
  5. Catawissa Borough Code Ch. 189 Floodplain Management, Art. IV (Borough of Catawissa), quoted and re-checked
  6. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  7. Catawissa Borough Code Ch. 345 Zoning, Art. V Basic District Regulations (Borough of Catawissa), quoted and re-checked
  8. Catawissa Borough Code Ch. 345 Zoning, Art. V Basic District Regulations (Borough of Catawissa), quoted and re-checked
  9. Catawissa Borough Code Ch. 345 Zoning, Art. V Basic District Regulations (Borough of Catawissa), quoted and re-checked
  10. Uniform Construction Code, quoted and re-checked
  11. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  12. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  13. Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked
  14. Act 537 Sewage Facilities (Pennsylvania statewide rule), quoted and re-checked
  15. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  16. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  17. Columbia County Municipal List & Ordinance/Zoning List, quoted and re-checked
  18. Effective property tax rate: Bolthole Index county data
  19. Median property tax bill: Bolthole Index county data

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Catawissa

Borough of Catawissa’s own rules

  • Local zoningPresent

    Land inside Catawissa borough

    • Zoning ordinance adopted 11-19-1974 by Ord. No. 229 per chapter history; amendments noted in code.
    “a chapter adopted to establish comprehensive zoning regulations for the borough of catawissa, columbia county.”
  • Zoning districtsPublished

    Zoning districts inside Catawissa borough

    • Districts also include a conservation district (C-1) per § 345-20; uses per Schedule I attachment.

    districts: R-1, R-2, B-1, I-1, C-1

    “r-1 residential, low-medium density r-2 residential, medium-high density b-1 central commercial district i-1 light industrial use district c-1 conservation area”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots inside Catawissa borough; numeric limits per district in Schedule II

    • Numeric values are in Schedule II attachment, not read.
    “lot, yard, and building regulations for the various zoning districts shall be as set forth in schedule ii, area and bulk requirements, of this chapter.”
  • SetbacksDistrict specific (with conditions)

    Yards/setbacks inside Catawissa borough; per district in Schedule II

    • Numeric values are in Schedule II attachment, not read.
    “lot, yard, and building regulations for the various zoning districts shall be as set forth in schedule ii, area and bulk requirements, of this chapter.”
  • Building heightDistrict specific (with conditions)

    Building height inside Catawissa borough; per district in Schedule II (see also § 345-30 height limitation)

    • Numeric values are in Schedule II attachment, not read.
    “a chapter regulating the location and use of buildings, structures, and land for business, industry, residence, and other purposes; the height, appearance and size of buildings, the size of yards, and the density of population;”
  • Building in a floodplainLimited

    Development in identified floodplain area inside Catawissa borough

    • No increase in 100-year flood elevation in floodway.
    • New residential construction must have lowest floor at or above regulatory flood elevation.
    • No new construction within 50 feet landward of top of bank unless DEP permit obtained.
    “b. within any floodway area, no new construction or development shall be permitted that would cause any increase in the one-hundred-year-flood elevation. c. within any identified floodplain area, no new construction or development shall be located within the area measured 50 feet landward from the top of bank of any watercourse, unless a permit is obtained from the department of environmental protection regional office.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Catawissa or Columbia County directly.

  • Building permit — Building permits in Catawissa borough
  • Owner-builder exemption — Owner-builder exemption in Catawissa borough
  • Building code adopted — Building code in Catawissa borough
  • Inspections — Building inspection in Catawissa borough
  • Certificate of occupancy — Certificate of occupancy in Catawissa borough
18 more unanswered
  • Minimum dwelling size
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Catawissa publishes no rule on the point, not that none exists. Columbia County’s page lists the county offices to call.

← All of Columbia County: county rules, score and offices