Bolthole Index

Chester County, Pennsylvania

Zoning, building permits and septic rules in Westtown Township, Pennsylvania

Westtown Township, Pennsylvania has its own zoning, set in Chapter 170 of the township code1, and building permits are required for most residential work2. The township's Building, Zoning, and Code Enforcement Department handles both. Septic permits and well permits are not the township's call: the Chester County Health Department issues them3.

At a glance

Building permit
Required for most residential work; issued through the township24
Zoning
Yes, township zoning ordinance (Chapter 170) with its own districts15
Septic
Chester County Health Department3
Wells
Permit required from the Chester County Health Department6
Owner-builder
Pennsylvania has no statewide contractor license for most construction7

Who to call

Building permits

Westtown Township Building, Zoning, and Code Enforcement Department

Building, zoning and grading permits, plan review and inspections inside Westtown Township

(610) 692-1930

1039 Wilmington Pike West Chester, PA 19382

Septic permits

Chester County Health Department

On-lot sewage (septic) permits and well permits for Chester County, including Westtown Township

610-344-6225

601 Westtown Road, Suite 295 West Chester, PA, 19380-0990

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Westtown Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Westtown Township have zoning?

Yes. Westtown Township zones its own land: Chapter 170 of the township code divides the township into base zoning districts and keeps a zoning map on file with the township secretary1. The base districts are A/C agricultural/cluster residential, POC, R-1, R-2, R-3, M-U, C-1, C-2 and T, and a Steep Slope Conservation overlay also applies5.

The district decides what you can build, so find the parcel's district on the township zoning map before anything else. Lot size, setbacks, minimum home size, RV use and tiny-home rules all depend on it. We could not confirm those district standards, or whether living in an RV or tiny home is allowed during construction; ask the township zoning officer at the Building, Zoning, and Code Enforcement Department2. Chester County does not zone for its municipalities; each one adopts its own ordinance8.

Do you need a building permit in Westtown Township, and who issues it?

Yes for most work. Permits are required in Westtown Township for most residential work and all commercial additions and alterations, plus electrical, HVAC, plumbing, decks, pools, sheds and fences2. Pennsylvania's Uniform Construction Code requires the owner to apply and obtain the permit before covered construction begins4.

The township's Building, Zoning, and Code Enforcement Department takes the application, and permits are reviewed and inspected by the township or its third-party inspection agency2. Plan on 15 business days of review, and fees are paid when the permit is issued, not at application2. New buildings and major renovations are reviewed under the 2018 I-codes2. A certificate of occupancy is needed before a residential building can be used9.

How do septic permits work in Westtown Township?

Septic permits for Westtown Township come from the Chester County Health Department, not the township3. A permit is required for new systems and for repairs or modifications to existing ones10. The application needs at least one acceptable percolation test and at least two acceptable test pits for soil profile examination10.

Soils matter here: USDA rates only about 24% of Chester County soils as not limited for a conventional drain field, a strict rating, so many lots need a site evaluation or an engineered system11. The county's own inspection rule is that no system may be covered before final inspection and written approval12.

We could not confirm whether the township adds its own on-lot sewer rules or requires a public sewer connection at a given address. Ask the township office before you buy.

Building a home in Westtown Township: the steps, in order

  1. Find the parcel's zoning district and the district's lot, setback and use standards with the township's zoning officer2.
  2. If the lot is not on public sewer, apply to the Chester County Health Department for a sewage permit, with percolation test and test pits10. A well needs its own permit from the same department6.
  3. If the driveway meets a state road, get a PennDOT highway occupancy permit13.
  4. Apply for the building permit with the township, then schedule inspections with the building inspector2.
  5. Keep the work open for the required inspections: foundations, plumbing, mechanical and electrical systems, frame and masonry, and wallboard, plus a final14.
  6. Get the certificate of occupancy before anyone moves in9.

What stays with Chester County, and what to check before you buy

Chester County, not the township, handles septic permits and well permits36. For land outside the township, see the Chester County page.

Before buying, check three things. First, if any part of the parcel is in a Special Flood Hazard Area, the municipality must issue a floodplain development permit before work starts15. Second, any subdivision of the land is regulated, and the township code has a chapter on subdivision of land16; the county health department also reviews sewage on subdivisions17. Third, a typical home in the county is valued at about $587,747 and the median property tax bill is about $6,191 a year, both county-level figures1819.

Watch-outs

  • Several of Westtown Township's district standards (lot size, setbacks, minimum home size, accessory dwellings) and its RV and tiny-home rules were not confirmed; call the township zoning officer before you rely on any of them2.
  • A driveway onto a state highway needs a separate PennDOT highway occupancy permit, and review usually takes about 30 days when the application is complete13.
  • A permit-exempt septic system is possible only on a tract of 10 acres or more under narrow state conditions, so do not assume it applies inside a township of this size20.

Sources

  1. Westtown Code Ch. 170 Art. III Establishment of Districts (Westtown Township), quoted and re-checked
  2. Westtown Township Building, Zoning, and Code Enforcement Department (westtownpa.org)
  3. Sewage & Water, quoted and re-checked
  4. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  5. Westtown Code Ch. 170 Art. III Establishment of Districts (Westtown Township), quoted and re-checked
  6. Chester County Health Department Rules and Regulations, quoted and re-checked
  7. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  8. Planning in Pennsylvania, quoted and re-checked
  9. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  10. Permits for On-Lot Sewage Disposal Systems, quoted and re-checked
  11. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  12. Application and Permit Procedure for On Lot Sewage Systems, quoted and re-checked
  13. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  14. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  15. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  16. Township of Westtown, PA code of ordinances (eCode360) table of contents (Westtown Township), quoted and re-checked
  17. Subdivision Planning, quoted and re-checked
  18. Typical home value (Zillow): Bolthole Index county data
  19. Median property tax bill: Bolthole Index county data
  20. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Westtown Township

Westtown Township’s own rules

  • Building code adoptedAdopted

    Buildings and structures inside Westtown township

    • Township code adopts the 2006 International Building Code (Ord. 2007-5, adopted 4-2-2007) with local changes in § 57-4.
    • Current Pennsylvania Uniform Construction Code edition not verified on the page.

    adopted code: International Building Code, 2006 edition (changes in § 57-4)

    “being marked and designated as the international building code, 2006 edition, including all appendix chapters”
  • Local zoningPresent

    Land inside Westtown township

    • Zoning is Chapter 170 of the township code; a zoning map is on file with the township secretary.
    “the township of westtown is hereby divided into nine base zoning districts, which are designated as follows:”
  • Zoning districtsPublished

    Westtown township base zoning districts

    • Steep Slope Conservation overlay district also applies (§ 170-402).
    • Annexed territory is zoned R-1 until reclassified.

    base districts: A/C, POC, R-1, R-2, R-3, M-U, C-1, C-2, T

    “a/c agricultural/cluster residential district poc planned office campus district r-1 residential district r-2 residential district r-3 residence-office district m-u multi-use district c-1 neighborhood and highway commercial district c-2 highway commercial district t township district”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Westtown township

    • Only the existence of Chapter 149 was confirmed from the code table of contents; its requirements were not opened.
    “chapter 149 subdivision of land (§ 149-100 – § 149-1002)”
  • Permit feesVariable (with conditions)

    Building code administration fees inside Westtown township

    • Fees are set by Board of Supervisors resolution, not in the code; the fee schedule itself was not opened.
    “fees assessable by the township for the administration and enforcement undertaken pursuant to this article and the code shall be established by the board of supervisors by resolution from time to time.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Westtown Township or Chester County directly.

  • Building permit — Construction inside Westtown township
  • Owner-builder exemption — Owner-builders inside Westtown township
  • Inspections — Construction inside Westtown township
  • Certificate of occupancy — New buildings inside Westtown township
  • Minimum dwelling size — R-1 and A/C districts inside Westtown township
19 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Westtown Township publishes no rule on the point, not that none exists. Chester County’s page lists the county offices to call.