Centre County, Pennsylvania
Walker Township is a township in Centre County, Pennsylvania. Walker Township adopts its own zoning, so inside its limits Walker Township’s rules apply, not the county’s. Septic permits inside Walker Township come from Walker Township. 10 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Centre County page.
Zoning permit for any construction or change to property inside Walker township. This is the township's zoning permit; a separate state Uniform Construction Code building permit was not verified.
“permits yes we require zoning permits; they must be obtained prior to any construction or change to your property.”
Land inside Walker township's limits (Centre County, PA). Walker township administers its own zoning ordinance, the Walker Township Zoning Ordinance of 2003.
“this ordinance shall be known and be cited as the "walker township zoning ordinance of 2003" and is intended to serve as a comprehensive amendment of the walker township zoning ordinance enacted and ordained by the township board of supervisors in september 1995.”
Zoning districts of Walker township
“walker township is hereby divided into the following zoning districts: rr sr ur v c li me a w/c fp”
Single-family detached dwelling lot in the RR Rural Residential district in Walker township
minimum lot area, on-lot sewage: 1 acre (43,560 sq ft per dwelling unit) · minimum lot area, public or community sewer: 0.5 acre (21,780 sq ft per dwelling unit)
“a) on-lot sewage - 1 acre (43,560 sq.ft.) per dwelling unit. b) public or community sewer - 1/2 acre (21,780 sq.ft.) per dwelling unit.”
“a) on-lot sewage- 30,000 sq.ft. per dwelling unit. b) public or community sewer- 15,000 sq.ft. per dwelling unit.”
Residential uses in the RR Rural Residential district in Walker township
front yard: >= 30 feet from road right-of-way (or 55 feet from road centerline, whichever is greater) (whichever is greater) · side yard, residential uses: 15 feet each side (25 feet for other uses) · rear yard, residential uses: 15 feet (25 feet for other uses)
“1. front yard: 30 feet from edge of road right-of-way or 55 feet from road centerline, whichever is greater. 2. side yards: a. residential uses - 15 feet each side. b. all other uses - 25 feet each side. 3. rear yard: a. residential uses - 15 feet. b. all other_ uses - 25 feet.”
Recreational vehicles placed on a site in Walker township
RV placement period before mobile-home treatment: > 180 consecutive days
“for the purposes of this ordinance, the term mobile home shall also include park trailers, travel trailers, recreational vehicles and other similar types of manufactured homes which are placed on a site for more than 180 consecutive days.”
Mobile homes on individual lots in the RR Rural Residential district in Walker township
“permitted principal uses & structures (zoning officer) permitted accessory uses & structures (zoning officer) special exception uses & structures (zoning hearing board) 1. single-family detached dwellings. 1. uses & structures customarily (see 402) incidental to an approved principal use. 2. mobile homes on individual lots.”
On-lot sewage (septic) review for land inside Walker township
“sewage enforcement officer stan wallace is the current sewage enforcement office.”
Development inside the general floodplain district (overlay) in Walker township
“a. within any identified floodplain area, all mobile homes and any additions thereto shall be prohibited within the area measured 50 feet landward from the top-of-bank of any watercourse.”
We looked and could not find an official answer yet. Silence is not permission; ask Walker Township or Centre County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Walker Township publishes no rule on the point, not that none exists. Centre County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Walker Township means bringing your own water and power. The kit we’d start with: