Bolthole Index

Centre County, Pennsylvania

Zoning, building permits and septic rules in Miles Township, Pennsylvania

Miles Township is a township in Centre County, Pennsylvania. Miles Township has not adopted its own zoning; the county’s or state’s rules apply inside its limits. Septic permits inside Miles Township come from Miles Township. 11 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Centre County page.

Answers from the rulebook for Miles Township

Miles Township’s own rules

  • Building permitRequired

    Accessory structures larger than 25 square feet in Miles Township

    • Accessory structures larger than 25 square feet require a building permit and must meet required setbacks.
    • Smaller structures are not covered by this statement.

    accessory structure size threshold: > 25 square feet

    “accessory structures larger than 25 square feet require a building permit and must meet required setbacks.”
  • Local zoningAbsent

    Land inside Miles Township, Centre County, PA (township-specific; not the county's unincorporated area)

    • The township's own page states it has no zoning ordinance.
    • The same page states the township has building and setback requirements, and that it uses the Centre County SALDO requirements (see subdivision claim).
    • The same page also says a zoning permit must be obtained as part of the building permit process; this conflicts with the no-zoning statement and was not resolved on the page.
    “miles township does not have a zoning ordinance, however we have building and setback requirements.”
  • Zoning districtsNot published

    Zoning districts inside Miles Township (none adopted)

    • Township states it has no zoning ordinance, so no zoning district map exists.
    “miles township does not have a zoning ordinance, however we have building and setback requirements.”
  • SetbacksSpecified

    Setbacks for accessory structures larger than 25 square feet in Miles Township

    • Township states building and setback requirements exist; the numeric setback distances were not located on the page.
    • Applies to accessory structures larger than 25 square feet.
    “accessory structures larger than 25 square feet require a building permit and must meet required setbacks.”
  • Who permits septicLocal (with conditions)

    Sewage (septic) permitting for land inside Miles Township

    • The township names its own sewage enforcement officer (SEO).
    • The SEO handles sewage permits for new dwellings, new commercial business, and renovations that add bedrooms.
    “miles township seo justin dashem office (814) 349-8177, cell (814)-933-2108”
  • Septic permitRequired

    New dwellings, new commercial businesses, and renovations or additions that add bedrooms in Miles Township

    • Permit must be obtained from the sewage enforcement officer before the building permit is issued.
    • Applies to new dwelling or commercial business construction, and to renovation or addition that adds any bedroom.
    • Before a dwelling permit can be issued, a sewage permit and a highway occupancy permit are required (township page).
    “a sewage permit must be obtained from the sewage enforcement officer, prior to issuance of a building permit, if the construction is for new dwelling, or commercial business, or if a renovation/addition adds any bedrooms.”
  • Permit feesPublished (with conditions)

    Sign permit fee only, Miles Township; building, sewage, and zoning fees not located

    • Fee stated for sign permits only.
    • Building and sewage permit fee schedules were not located on the township page.

    sign permit fee: 35 USD (per sign)

    “the fee for a sign permit is $35 per sign.”
  • Permit processPublished (with conditions)

    Building permit application process in Miles Township

    • Requires a zoning permit (the township page says this despite the no-zoning statement).
    • Requires two sets of plans and a site/plot plan with distances from property lines.
    • Requires a sewage permit (new construction or bedroom additions) and a highway occupancy permit where a driveway is added or Centre County requires one.
    “building permit application process to apply for building permit in miles township, you first must obtain a zoning permit and provide two (2) sets of plans”

Rules another office applies inside Miles Township

Miles Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Subdividing landRegulated (with conditions)

    Subdivision and land development inside Miles Township; the rule-maker is the Centre County SALDO applied through the township

    • The township page states that it uses the Centre County SALDO requirements; the SALDO text itself was not opened.
    • The SALDO is a county-wide ordinance that the township uses, not a township ordinance.
    “additionally miles township uses the centre county saldo requirements.”
  • Driveway accessRequired

    Driveway access onto township roads in Miles Township, through the Penns Valley Code Enforcement Agency

    • Required any time a driveway is added, or when required by Centre County.
    • Issued by the Penns Valley Code Enforcement Agency per the township page.
    “a highway occupancy permit -from the penns valley code enforcement agency (any time a driveway is added, or when required by centre county).”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Miles Township or Centre County directly.

  • Owner-builder exemption — Owner-builder exemption in Miles Township
  • Building code adopted — Building code adopted for construction in Miles Township
  • Inspections — Building inspections in Miles Township
  • Certificate of occupancy — Certificate of occupancy in Miles Township
  • Septic inspection — Septic system inspection in Miles Township
6 more unanswered
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Miles Township publishes no rule on the point, not that none exists. Centre County’s page lists the county offices to call.

← All of Centre County: county rules, score and offices