Building permits, zoning and septic rules in Upper Makefield Township, Pennsylvania

Upper Makefield Township in Bucks County, Pennsylvania requires a township building permit and a zoning use and occupancy permit for construction1. Zoning comes from the regional Newtown Area Joint Municipal Zoning Ordinance (JMZO)2. Septic permits and well approvals involve the Bucks County Department of Health, not the township alone34.

At a glance

Building permit
Required; applied for through the township, with a zoning use and occupancy permit1
Zoning
Regional Newtown Area Joint Municipal Zoning Ordinance (JMZO)2
Building code
2018 International Building Code and 2018 International Plumbing Code; 2017 NEC5
Septic
Bucks County Department of Health36
Wells
Permits from both the township and the Bucks County health department4
Owner-builder
Notarized homeowner exemption on the zoning application7

Who to call

Building permits

Upper Makefield Township offices (building, planning and zoning)

Building permit and zoning applications for land inside Upper Makefield Township

215-968-3340

[email protected]

1076 Eagle Road, Newtown, PA 18940

Septic permits

Bucks County Department of Health

On-lot sewage (septic) permits and well permits for Bucks County

215-345-3318

1282 Almshouse Road, Doylestown, PA 18901

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Upper Makefield Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Upper Makefield Township, PA?

Yes. Upper Makefield Township requires a building permit application together with a zoning use and occupancy permit application (with impervious calculations) for accessory buildings and similar construction1. The township's instructions say their permit list is not inclusive, so ask before assuming a small project is exempt1.

Permit applications are reviewed against the 2018 International Building Code, the 2018 International Plumbing Code and the 2017 National Electrical Code58. Pennsylvania's statewide Uniform Construction Code is the backbone of these rules9. Disturbing more than 1,000 sq ft of ground also brings a grading permit1.

Who issues building permits in Upper Makefield Township, and how do you reach them?

The township itself handles building permit and zoning applications; Bucks County does not run a building department for township land10. Contact the Upper Makefield Township offices at 1076 Eagle Road, Newtown, PA 18940, phone 215-968-3340, email [email protected]8.

The township's own instructions put about 3 weeks of processing time on a complete application11. Electrical work needs plan review and inspections by a third-party electrical agency12. A building-code certificate of occupancy was not separately confirmed; the township's application is a zoning use and occupancy permit13.

Does Upper Makefield Township have zoning?

Yes. Upper Makefield Township applies zoning through the Newtown Area Joint Municipal Zoning Ordinance (JMZO), a regional ordinance shared with other townships rather than a township-only document28. Bucks County itself does not run zoning for the township; each municipality sets its own14.

We could not confirm the JMZO's district rules for minimum lot size, setbacks, RVs, tiny homes, accessory dwellings or manufactured homes. Pennsylvania's rules about state park campgrounds do not answer whether you can live in an RV on your own lot. Ask Upper Makefield Township planning and zoning, and read the JMZO district for your parcel before you buy8.

How do septic permits work in Upper Makefield Township?

Septic systems inside Upper Makefield Township go through the Bucks County Department of Health; the township sends applicants to the county's requirements3. The county requires a permit before installing, altering, repairing or occupying a structure that needs an on-lot sewage system15. A site evaluation is requested in writing, and additional soil testing may be required16.

Before anyone occupies the structure, the system must receive written Approval to Cover and a final inspection by the Department's Sewage Enforcement Officer17. Adding a bedroom requires approval of the existing septic system from the health department18. On-lot systems are not allowed where an approved public sewer is accessible19. Contact:20.

What other approvals does Upper Makefield Township require?

Water well permits are required from both the township and the Bucks County health department4. Wells must sit at least 100 feet from any septic system, and township ordinance 216 governs well construction, depth and water testing4. Additions must be at least 10 feet from the well and septic system18.

Grading disturbance over 1,000 sq ft needs approval from the Bucks County Conservation District11. Subdivision and land development are regulated by the township's code, and plans also go to the Bucks County Planning Commission2122. A driveway onto a PennDOT-jurisdiction road needs a highway occupancy permit23.

Can you build your own home in Upper Makefield Township?

Homeowners doing their own work sign page three of the zoning application as a notarized homeowner exemption and supply a copy of homeowner liability insurance in place of contractor registration7. That exemption covers contractor registration; it does not skip the building permit or inspections1.

Steps, in order:

  1. Ask Upper Makefield Township planning and zoning which JMZO district your parcel is in8.
  2. Start septic and well approvals with the Bucks County Department of Health3.
  3. File the building permit and zoning use and occupancy applications with a plot plan1.
  4. Complete required inspections, including electrical12.

What stays with Bucks County, and what should you check before you buy?

Septic and well permits sit with the Bucks County Department of Health, and subdivision plans get county planning review322. For land outside the township, see the Bucks County page.

Before you buy, confirm the JMZO district and any floodplain limits with the township, and have the health department evaluate the site. Bucks County's typical home value is $533,660 and the median property tax bill is $5,833 a year2425.

Watch-outs

  • We could not confirm Upper Makefield Township's rules for RVs, tiny homes, minimum lot size or setbacks; ask the township planning and zoning office, which administers the JMZO2.
  • The township's published permit instructions are dated May 2019 and list older code editions than its code page, so confirm current code editions and fees with the township before budgeting5.
  • Septic and well approvals come from the Bucks County Department of Health, not the township, so start there early3.

Sources

  1. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  2. Upper Makefield Township: Township Code (Upper Makefield Township), quoted and re-checked
  3. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  4. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  5. Upper Makefield Township: Township Code (Upper Makefield Township), quoted and re-checked
  6. Bucks County Department of Health On-Lot Sewage Rules and Regulations, quoted and re-checked
  7. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  8. Upper Makefield Township offices (building, planning and zoning) (uppermakefield.org)
  9. Uniform Construction Code (UCC) (Pennsylvania statewide rule), quoted and re-checked
  10. PA Department of Labor & Industry - Uniform Construction Code (2026 county census)
  11. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  12. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  13. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  14. Overview | Bucks County Planning Commission, quoted and re-checked
  15. Bucks County Department of Health On-Lot Sewage Rules and Regulations, quoted and re-checked
  16. Bucks County Department of Health On-Lot Sewage Rules and Regulations, quoted and re-checked
  17. Rules and Regulations Governing Individual and Community On-Lot Sewage Disposal Systems, quoted and re-checked
  18. Upper Makefield Township General Instructions for Permit Applications (rev. May 2019) (Upper Makefield Township), quoted and re-checked
  19. Bucks County Department of Health Rules and Regulations Governing Individual and Community On-Lot Sewage Disposal Systems, quoted and re-checked
  20. Bucks County Department of Health (buckscounty.gov)
  21. Township of Upper Makefield, PA code of ordinances (eCode360) table of contents (Upper Makefield Township), quoted and re-checked
  22. Bucks County Planning Commission Overview, quoted and re-checked
  23. Pennsylvania Construction Code Act, quoted and re-checked
  24. Typical home value (Zillow): Bolthole Index county data
  25. Median property tax bill: Bolthole Index county data

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Upper Makefield Township

Upper Makefield Township’s own rules

  • Building permitRequired

    Accessory buildings and similar construction inside Upper Makefield township (township permit instructions)

    • Also needs zoning use and occupancy permit, grading permit if disturbance over 1,000 sq ft, and electrical/plumbing permits as applicable
    • Instructions say the permit list is not inclusive
    “required forms and submissions building permit application zoning use and occupancy permit application (with impervious calculations)”
  • Owner-builder exemptionConditional

    Homeowners doing their own work inside Upper Makefield township

    • Notarized homeowner exemption on page three of the zoning application
    • Homeowner liability insurance copy required instead of contractor registration
    “please sign page three of the zoning application for homeowner exemption and have it notarized.”
  • Building code adoptedAdopted (with conditions)

    Construction permit applications inside Upper Makefield township

    • The 2019 permit instructions list the 2015 IBC, 2015 IPC and 2014 NEC; the township code page lists newer 2018 editions

    building code: 2018 International Building Code · plumbing code: 2018 International Plumbing Code · electrical code: 2017 NEC

    “permit applications also are reviewed against the following codes: 2018 international building code, 2018 international plumbing code, 2017 national electric code (nec)”
  • InspectionsLimited

    Electrical work inside Upper Makefield township; general building inspection rules not located

    • Performed by third-party electrical inspection agency that approved the plans
    “rough and final inspections of electrical work must be completed, with the inspector’s inspection approval sticker placed on the electrical panel.”
  • Certificate of occupancyLimited

    Zoning use and occupancy permit for construction inside Upper Makefield township

    • Source names a zoning use and occupancy permit application; a building-code certificate of occupancy was not separately confirmed
    “required forms and submissions building permit application zoning use and occupancy permit application (with impervious calculations)”
  • Local zoningPresent (with conditions)

    Land inside Upper Makefield township; zoning is applied through the regional Newtown Area Joint Municipal Zoning Ordinance (JMZO)

    • Zoning is a joint ordinance shared with other townships, not a township-only ordinance
    • The JMZO text itself was not opened on an official page
    “the township also follows a regional zoning ordinance, the newtown area joint municipal zoning ordinance (jmzo).”
  • Well permitRequired

    Water wells inside Upper Makefield township

    • Wells at least 100 feet from any septic system
    • Township ordinance 216 governs well construction, depth and water testing
    • Plot plan required with township application

    well to septic distance: >= 100 feet

    “water well permits are required from both the township and the bucks county health department.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development inside Upper Makefield township

    • Only the chapter title was seen; section text not opened
    “chapter 22 subdivision and land development”
  • Permit processPartial

    Permit applications inside Upper Makefield township

    • Instructions are dated May 2019
    • About 3 weeks processing time stated
    • Third-party electrical plan review, grading approval from Bucks County Conservation District for disturbance over 1,000 sq ft, and county health approval for septic/wells
    “please carefully review the requirements for your project and complete all the documents described for your project.”

Rules another office applies inside Upper Makefield Township

Upper Makefield Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Septic systems inside Upper Makefield township, handled by the Bucks County Department of Health (county rule-maker applying inside the township)

    • Township sends applicants to county requirements
    “please see bucks county’s specific permit requirements for details relating to septic systems and wells.”
  • Septic permitRequired

    Additions and new bedrooms using septic systems inside Upper Makefield township (Bucks County Department of Health)

    • New bedrooms require approval of the existing septic system from Bucks County Department of Health
    • Renovation/addition must be at least 10 feet from well and septic system; pools 25 feet from septic
    “new bedrooms require septic system approvals. if you are adding a bedroom, you must obtain approval for the existing septic system from the bucks county department of health.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Upper Makefield Township or Bucks County directly.

  • Zoning districts — Zoning districts inside Upper Makefield township
  • Minimum dwelling size — Minimum dwelling size inside Upper Makefield township
  • Minimum lot size — Minimum lot size inside Upper Makefield township
  • Setbacks — Setbacks inside Upper Makefield township
  • Lot coverage — Lot coverage inside Upper Makefield township
14 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.