Solebury Township, Bucks County, Pennsylvania has its own zoning ordinance1, and its Planning & Zoning department manages building permit and zoning applications2. Pennsylvania's Uniform Construction Code requires a building permit before work starts3. Septic permits for every Solebury address come from the Bucks County Department of Health4.
At a glance
- Building permit
- Required under the state Uniform Construction Code; applied for through the township's Planning & Zoning department32
- Zoning
- Township zoning ordinance with published districts (RA, RB, VR, RD, VC and others)15
- Septic
- Permits from the Bucks County Department of Health; township requires pumping and inspection every three years46
- RA minimum lot
- 1.5 acres for a single-family dwelling, more if horses or ponies are kept7
- RA building height
- 35 feet for dwellings and other structures, with exceptions8
- RV or tiny home living
- Not confirmed; ask the township zoning officer2
- Grading permit
- Needed when earth disturbance exceeds 2,000 square feet, before the building permit9
Who to call
Building permits
Solebury Township Planning & Zoning Department
Building permit and zoning applications, the zoning officer, and the township's online zoning map
3092 Sugan Road, Solebury, PA 18963
Building permits
Solebury Township Code Enforcement Office
Questions about which projects need building, plumbing, mechanical or electrical permits; grading permits
Septic permits
Solebury Township Sewage Management Program
Township septic pumping and inspection program under its Act 537 plan
Septic permits
Bucks County Department of Health
Permits for on-lot septic systems anywhere in Bucks County, inside or outside township limits
1282 Almshouse Road, Doylestown, PA 18901
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Solebury Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Solebury Township, PA have zoning, and what does it cover?
Solebury Township, Bucks County, has its own zoning ordinance, cited as the Solebury Township Zoning Ordinance of 1988, as amended1. Bucks County does not run zoning for the township; county zoning power in Pennsylvania is limited to land in municipalities with no zoning ordinance of their own10. The township publishes its districts, including RA, RB, VR, RD, VC and an MHPO mobile home park overlay5. Look up a parcel's district on the township's online zoning map, which the Planning & Zoning department points residents to2.
In the RA Residential/Agricultural district, a single-family dwelling lot needs at least 1.5 acres, a larger lot if horses or ponies are kept, and 10 acres for livestock uses7. Dwellings and other structures in RA are capped at 35 feet, with exceptions8. Maximum impervious coverage is 25% and maximum building coverage is 15%11. Other districts have different numbers, so check the district first.
Do you need a building permit in Solebury Township, and who issues it?
Pennsylvania's Uniform Construction Code requires a building permit before construction or building work starts3. In Bucks County the permit comes from the township or borough, not from the county12. In Solebury, the Planning & Zoning department manages permit and zoning applications, and applications go through the township's online permit portal2.
The township says small cosmetic changes may not need permits, while larger projects such as finishing a basement need one; call the township's code enforcement office at 215-297-5656 about a specific project9. A UCC certificate of occupancy must be issued before a building can be used13. Whether the township uses its own inspector or a third-party agency for residential inspections is something we could not confirm; ask the Planning & Zoning department.
What does the Solebury Township permit process look like?
The township's Planning & Zoning department lists items the permit portal cannot take, including conditional use, floodplain, road occupancy, signs, wells and subdivision or land development applications; those go through paper forms2. Grading permits are required when earth disturbance exceeds 2,000 square feet, and a grading permit must be finished before a building permit application can be submitted9.
Permits can take up to 45 days to process9. A driveway onto a state highway needs a PennDOT highway occupancy permit; a township road is a separate question for the township14. Subdivisions and land developments are regulated through the municipality, with county planning commission review15.
How do septic permits work in Solebury Township?
The Bucks County Department of Health permits on-site sewage facilities, including for Solebury addresses4. A permit is required before installing, altering or occupying a structure that needs an individual or community sewage system16. Before occupancy, the system needs written Approval to Cover and a final inspection by the Department's Sewage Enforcement Officer17.
Solebury adds its own layer: the township's sewage management program requires every owner with a septic system to have it pumped and visually inspected every three years6. Only a small portion of the township is on public sewer, and most homes use septic tanks and private wells6. Statewide soil ratings are a county-level guide: 22% of Bucks County soils rate as not limited for a conventional drain field, so most lots need a site evaluation or an engineered system18. Statewide rules allow a permit exemption on a tract of at least 10 acres under narrow owner and local-ordinance conditions, so ask the Health Department before assuming one applies19.
Can you live in an RV or tiny home in Solebury Township?
We could not confirm Solebury Township's rules on living in an RV, camping on private land or tiny homes; the zoning ordinance does not appear to address them in the sections we reviewed. Pennsylvania's campground stay limits apply only to state park campgrounds and do not answer the question for a private lot20. A manufactured home placed on a lot is subject to the UCC for additions, relocation and change of occupancy, and the state rule leaves local zoning and siting to the township21. The township ordinance also has an MHPO mobile home park overlay district5. Ask the township zoning officer at 215-297-5656 before buying a lot for a trailer, RV or tiny home2.
Building a home in Solebury Township: the steps, in order
- Find the parcel's zoning district on the township's online zoning map and read the district's lot size, height and coverage rules2.
- Contact the Bucks County Department of Health for a site evaluation and septic permit22.
- If earth disturbance will exceed 2,000 square feet, get the grading permit first9.
- Apply for the building permit through the township's online portal2.
- Get a state highway occupancy permit if the driveway meets a state road14.
- Pass inspections and obtain the certificate of occupancy before moving in13.
- Once on septic, have the system pumped and inspected every three years6.
What stays with Bucks County, and what to check before you buy in Solebury Township
Septic permits, on-lot sewage rules and non-DEP well permitting stay with Bucks County423. The county's own answers for land outside Solebury are on the Bucks County page.
Before buying, confirm the zoning district, whether a flood plain affects the lot (floodplain applications go through the township, and construction in a flood plain needs sealed documentation from a design professional)224, and the septic or sewer situation. Bucks County's effective property tax rate is 1.4%25, and its median property tax bill is $5,833 a year26.
Watch-outs
- The township's code enforcement office is the place to ask whether a specific project needs a permit, because small cosmetic work may not9.
- Permits can take up to 45 days to process, so plan the schedule around that9.
- Solebury's septic pumping and inspection program is separate from, and in addition to, county septic permits6.
- RV, tiny-home and short-term rental rules in the township were not confirmed; ask the township zoning officer before relying on them2.
Sources
- Solebury Township Ch. 27 Zoning, Part 1 Preamble (Solebury Township), quoted and re-checked
- Solebury Township Planning & Zoning Department (soleburytwp.org)
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Sewage Program, quoted and re-checked
- Solebury Township Ch. 27 Zoning table of contents (Solebury Township), quoted and re-checked
- Solebury Township Sewage Management Program (soleburytwp.org)
- Solebury Township Ch. 27 Zoning, Part 4 RA Residential/Agricultural District (Solebury Township), quoted and re-checked
- Solebury Township Ch. 27 Zoning, Part 4 RA Residential/Agricultural District (Solebury Township), quoted and re-checked
- Solebury Township Code Enforcement Office (soleburytwp.org)
- Pennsylvania Municipalities Planning Code, Section 602 (Pennsylvania statewide rule), quoted and re-checked
- Solebury Township Ch. 27 Zoning, Part 4 RA Residential/Agricultural District (Solebury Township), quoted and re-checked
- PA Department of Labor & Industry - Uniform Construction Code (2026 county census)
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Pennsylvania Construction Code Act, quoted and re-checked
- Bucks County Planning Commission Overview, quoted and re-checked
- Bucks County Department of Health On-Lot Sewage Rules and Regulations, quoted and re-checked
- Rules and Regulations Governing Individual and Community On-Lot Sewage Disposal Systems, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
- RV and Tent Campsites (Pennsylvania statewide rule), quoted and re-checked
- Pennsylvania Uniform Construction Code, Chapter 403 (Pennsylvania statewide rule), quoted and re-checked
- Bucks County Department of Health On-Lot Sewage Rules and Regulations, quoted and re-checked
- Residential Well Inspection Program, quoted and re-checked
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.