A new home in Bedford County, Pennsylvania requires a Uniform Construction Code building permit even on rural land, but the county Planning Commission does not issue it1,2. Start with the township or borough where the parcel sits, then use its designated code agency; the county directs permit seekers to the Pennsylvania Municipal Code Alliance2,3. On-lot septic permits are issued locally rather than by one countywide permit office4.

Do you need a building permit in Bedford County, Pennsylvania?

Yes.

Yes. Construction and building work covered by Pennsylvania's Uniform Construction Code requires a permit before work begins, including a new home in Bedford County1. Rural location does not remove the statewide UCC requirement3. Pennsylvania does exclude qualifying agricultural buildings from the Construction Code Act, but the structure cannot contain habitable space, so that exception does not turn a barn into an unpermitted dwelling9. A property owner may perform qualifying work without contractor licensing, but doing the work yourself does not waive the UCC building permit1,7. Permitted construction must remain accessible for required inspections, and a certificate of occupancy is required before the building is used1.

Who issues Bedford County building permits, and how do you reach them?

The Bedford County Planning Commission does not issue building permits; its official FAQ sends applicants to the Pennsylvania Municipal Code Alliance's Bedford office.

The Bedford County Planning Commission does not issue building permits; its official FAQ sends applicants to the Pennsylvania Municipal Code Alliance's Bedford office2. Permit administration still depends on the township or borough: municipalities generally enforce the UCC themselves or through certified third-party agencies, while residential work in an opt-out municipality is enforced by a certified third-party agency hired by the owner or contractor3. Call the township or borough first to confirm its current UCC agency and zoning procedure5. For a subdivision or land-development application, the municipality must sign the application before Bedford County Planning reviews it2. Building-permit fees vary with the issuing authority, and Bedford County Planning has a separate published schedule for subdivision and land-development review1,10. The state's UCC fee schedule applies only when the Department of Labor and Industry is the permitting authority, not countywide11.

Does Bedford County have zoning?

Zoning and land-use rules in Bedford County vary by municipality, so the township or borough where the parcel lies determines which local ordinance applies.

Zoning and land-use rules in Bedford County vary by municipality, so the township or borough where the parcel lies determines which local ordinance applies5. A Bedford County mailing address alone does not answer what can be built. Ask that municipality about permitted uses, setbacks, lot size, building height, accessory dwellings and whether an RV or tiny home may be occupied; we could not confirm countywide standards for those questions. If a land division is planned, subdivision review is a separate layer: the municipality must sign the application before Bedford County Planning reviews it2.

How do septic permits work in Bedford County?

On-lot septic permitting and enforcement in Bedford County are handled by local agencies rather than one countywide septic counter.

On-lot septic permitting and enforcement in Bedford County are handled by local agencies rather than one countywide septic counter4. Local agencies issue permits for retaining tanks and individual or community on-lot systems, with exceptions including large-volume systems4. The Bedford County Township & Borough Sanitary Corporation explains the process for its member municipalities, but its coverage is not countywide, so first ask the parcel's township or borough which local agency serves it4,12. Only 7.1% of county soils rate without severe limitations for a conventional drain field, so make septic feasibility an early contingency rather than assuming a standard system will fit13. A narrow exemption can apply on a contiguous tract of at least 10 acres under specific ownership, family-use and siting conditions; have the local agency verify eligibility rather than assuming acreage alone qualifies14.

Can you live in an RV or tiny home in Bedford County?

We could not confirm a countywide Bedford County rule for long-term RV occupancy, temporary camping or tiny-home occupancy.

We could not confirm a countywide Bedford County rule for long-term RV occupancy, temporary camping or tiny-home occupancy. Ask the parcel's township or borough whether its local ordinance permits the proposed use, what setbacks or lot standards apply, and whether living in the unit during construction is allowed5. A tiny home used as a dwelling remains subject to Pennsylvania's statewide construction-code system rather than escaping a building permit merely because it is small1,3. A manufactured home has its own UCC treatment: utility connections, grading, later additions, relocation and certain repairs or occupancy changes can trigger code review beyond the manufacturer's approved design15. Composting or incinerating toilets also do not eliminate wastewater planning for a new residence; washwater or excess liquid needs an approved disposal method under the same permit, subject to the stated exception16.

Building a home in Bedford County: the steps, in order

Identify the exact township or borough and ask which zoning and land-use rules apply to the parcel.

  1. Identify the exact township or borough and ask which zoning and land-use rules apply to the parcel5.
  2. Confirm the municipality's designated UCC enforcement agency; Bedford County Planning directs permit seekers to the Pennsylvania Municipal Code Alliance but does not issue the building permit itself2.
  3. Contact the municipality's local sewage agency or Sewage Enforcement Officer for the on-lot septic permit before finalizing the house site4.
  4. If creating a lot, obtain municipal sign-off before submitting the subdivision or land-development application for county review2.
  5. Submit the UCC application and applicable fee to the correct code agency before work begins1.
  6. Schedule the required construction inspections and obtain a certificate of occupancy before using the residence1.
  7. Apply to PennDOT if the driveway affects state highway land or connects to a PennDOT drainage facility17.

What should you check before buying Bedford County land?

Start with septic suitability: only 7.1% of Bedford County soils rate without severe limitations for a conventional drain field, so a favorable-looking clearing may still need a different system or house site.

Start with septic suitability: only 7.1% of Bedford County soils rate without severe limitations for a conventional drain field, so a favorable-looking clearing may still need a different system or house site13. Terrain also deserves a field check because 48.1% of county land is at a slope of 15% or less, while 73.4% is wooded13. Confirm the municipality and its zoning before relying on a listing's claim that land is unrestricted5. Check mapped flood hazards too: UCC-regulated construction in a floodplain requires design documentation prepared and sealed by a registered design professional1. A driveway affecting state highway land needs PennDOT approval17. Bedford County farmland averages about $5,010 per acre, the typical home value is about $219,854, and the median property-tax bill is about $1,403 per year, useful benchmarks rather than parcel-specific quotes13.

Watch-outs

  • The Bedford County Planning Commission does not issue building permits, and the correct UCC enforcement arrangement can depend on the township or borough, so confirm the agency before filing2.
  • A Bedford County parcel advertised as having no zoning may still face municipal land-use rules, statewide building-code requirements and local septic approval1,4,5.
  • The Bedford County Township & Borough Sanitary Corporation serves member municipalities rather than the entire county; ask the parcel's municipality to identify its Sewage Enforcement Officer4,12.

Sources

17 official pages, each quoted and re-checked · written October 10, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Bedford County has no countywide zoning.

RuleBedford CountyFulton CountySomerset CountyCambria CountyBlair CountyFranklin CountyHuntingdon County
Building permitRequiredRequiredRequiredLimitedRequiredRequiredRequired
County zoningNoNoNoNoNoNoNo
Septic permitsMunicipal Sewage Enforcement OfficerSEOMunicipal Sewage Enforcement OfficerLocal/joint Sewage Enforcement OfficerCounty Sanitary Administration CommitteeMunicipal Sewage Enforcement OfficerMunicipal Sewage Enforcement Officer

County locator

Bedford County in Pennsylvania

73
County map
Bedford County highlighted among the Pennsylvania counties · colored by Index score

How Bedford County scores

73 / 100 · #23 of 67 in Pennsylvania · six factors, land price, tax, rain and climate

Seclusion47100% ev.
Self-Sufficiency63100% ev.
Admin Boringness5890% ev.
Durability72100% ev.
Property Autonomy68100% ev.
Carry Cost75100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$220kTypical home
0.8%Property tax
$5,010Land / acre
40.8"Annual rain
0.6% of yrsSevere drought
1.8 / yr (+1.8)Mid-century 100°F days
11.7 daysMid-century dry spell
1.76" (+9.3%)Mid-century 1-day rain
1.57×Wildfire change factor
100%Forward climate coverage
$929Home insurance / yr
0.2% / yrInsurance growth
0.4%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
33,457People within 30 min
3,569,024People within 2 hr
37,495Radius comparison (15 mi)
46.8People / sq mi
0.3%Federal land
48.1%Land at 15% slope or less
7.1%Soils rated "not limited" for septic (strict USDA rating)
45,442 acWorkable land screen
73.4%Wooded land
63.7 tonsBiomass / forest ac
50.8°FAvg temp

Scout Bedford County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Bedford County. Listing sites control their own results and filters.

Sell land in Bedford County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Bedford County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet covered: Bloomfield Township · Broad Top Township · Borough of Coaldale · Colerain Township · Cumberland Valley Township · East Providence Township · East St. Clair Township · Harrison Township · Borough of Hopewell · Hopewell Township · Borough of Hyndman · Juniata Township · Kimmel Township · King Township · Liberty Township · Lincoln Township · Londonderry Township · Mann Township · Borough of Manns Choice · Monroe Township · Napier Township · Borough of New Paris · Pavia Township · Borough of Pleasantville · Borough of Rainsburg · Borough of Saxton · Snake Spring Township · South Woodbury Township · Southampton Township · Borough of St. Clairsville · West Providence Township · West St. Clair Township · Borough of Woodbury · Woodbury Township

Answers from the rulebook for Bedford County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Bedford County rules

  • County-wide zoningAbsent

    County zoning ordinance in Bedford County, Pennsylvania.

    • Bedford Borough is identified as the only municipality in the County with zoning; its zoning permit or approval may be needed before a use or change in use, building addition or alteration, or change or extension of a nonconforming use.
    • Municipal sewage, floodplain, subdivision, land-development, and state construction-code requirements may still apply independently of county zoning.
    “Bedford County does not have a zoning ordinance.”
  • Local zoningVaries (with conditions)

    Countywide aggregate of municipal zoning adoption; this is not a claim that Bedford County administers municipal zoning.

    • The county guide identifies Bedford Borough as the only municipality in the County with zoning and states that the County has no zoning ordinance.
    • The County Planning FAQ directs applicants to confirm the applicable municipality's current ordinance status because recent ordinances may have been passed.
    “List of municipalities where a municipal or county land use ordinance is in effect:”
  • Minimum dwelling sizeNone

    County zoning minimum dwelling-size standards outside Bedford Borough.

    • This finding concerns county zoning only; state construction-code and non-zoning development requirements may still apply.
    • Bedford Borough is identified as the only municipality in the County with zoning.
    “Bedford County does not have a zoning ordinance.”
  • Minimum lot sizeNone

    County zoning minimum-lot-size standards outside Bedford Borough.

    • This finding concerns county zoning only; municipal sewage, subdivision, floodplain, and state requirements may still apply.
    • Bedford Borough is identified as the only municipality in the County with zoning.
    “Bedford County does not have a zoning ordinance.”
  • SetbacksNone

    County zoning setback standards outside Bedford Borough.

    • This finding concerns county zoning only; municipal, subdivision, floodplain, and state requirements may still apply.
    • Bedford Borough is identified as the only municipality in the County with zoning.
    “Bedford County does not have a zoning ordinance.”
  • Living in an RVUnrestricted

    County land-use restrictions on RV occupancy on private land outside Bedford Borough.

    • This is limited to absence of a Bedford County zoning rule; it does not establish an affirmative entitlement under municipal, sewage, floodplain, subdivision, land-development, or state rules.
    • Bedford Borough may require zoning approval for a use or change in use.
    “Bedford County does not have a zoning ordinance.”
  • Tiny homesUnrestricted

    County land-use restrictions on tiny-home occupancy outside Bedford Borough.

    • This is limited to absence of a Bedford County zoning rule; it does not establish an affirmative entitlement under municipal, sewage, floodplain, subdivision, land-development, or state rules.
    • Bedford Borough may require zoning approval for a use or change in use.
    “Bedford County does not have a zoning ordinance.”
  • Who permits septicLocal (with conditions)

    On-lot sewage permitting and enforcement in Bedford County.

    • The actual local agency may be an individual municipality, a joint or multi-municipal agency, a county department of health, or a joint county department of health.
    • DEP provides technical oversight and financial assistance.
    • Large-volume on-lot systems are an exception to the described local-agency responsibility.
    “Local Agencies are responsible for carrying out on-lot or onsite ("septic system") sewage treatment system permitting and enforcement activities.”
  • Septic permitRequired

    Retaining tanks and individual or community on-lot sewage systems in Bedford County.

    • Local agencies issue permits for retaining tanks and individual and community on-lot systems that renovate sewage effluent in a soil absorption area or spray field.
    • Large-volume on-lot systems are an exception.
    • The issuing agency may be an individual municipality, joint agency, or county health department.
    “With certain exceptions (i.e. large volume on-lot systems), local agencies are responsible for issuing permits for retaining tanks or for individual and community on-lot sewage systems which renovate sewage effluent in a soil absorption area or spray field.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land-development review in Bedford County, including municipal sign-off and county planning review.

    • The application must be signed by the municipality before county planning review.
    • The county page references separate flow charts for building and non-building purposes.
    • The county recommends creating a new deed for any subdivision.
    • Municipal subdivision, land-development, and sewage requirements may also apply.
    “The process is relatively straight forward, and is covered by the flow charts below (separated by building and non-building purposes). Please note that your application must be signed by the municipality before we can review it. We also strongly recommend creating a new deed for any subdivision.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision and land-development review in Bedford County.
      “The process is relatively straight forward, and is covered by the flow charts below (separated by building and non-building purposes). Please note that your application must be signed by the municipality before we can review it. We also strongly recommend creating a new deed for any subdivision.”
  • Permit feesPublished (with conditions)

    Bedford County Planning Department subdivision and land-development review fees.

    • The county page states that amended review fees took effect July 29, 2024.
    • Any plan received or postmarked before July 29, 2024 honors the previous review fees.
    • The linked fee schedule was not retrievable during this research, so the amount of each county review fee is not established here.
    “Effective July 29, 2024, amended Subdivision and Land Development review fees for the Bedford County Planning Department will take effect. Please review the new fee schedule and application to see those changes. Any plan received or postmarked prior to the effective date will honor the previous review fees.”
  • Permit processPartial

    Building-permit process for Bedford County construction.

    • The county Planning Commission does not issue permits.
    • The county FAQ directs applicants to the PA Municipal Code Alliance.
    • The UCC application requires the political subdivision and county, an application package, construction drawings, site plans, and applicable fees.
    • Local enforcement arrangements vary by municipality.
    “The Planning Commission does not issue permits. One can be obtained from the PA Municipal Code Alliance.”
    One more reviewed finding on this topic
    • Published (with conditions) — Building-permit application process for Bedford County projects.
      “The Planning Commission does not issue permits. One can be obtained from the PA Municipal Code Alliance.”

Pennsylvania rules that apply here

  • Building permitRequired

    Residential buildings and regulated electrical, gas, mechanical, and plumbing systems in Pennsylvania municipalities enforcing the Uniform Construction Code or under third-party agency enforcement.

    • The permit must be obtained before covered construction begins.
    • Emergency repairs or equipment replacement may proceed before application only if the permit application is submitted within 3 business days.
    • The regulation incorporates the exceptions in § 403.1(b), including specified UCC scope exclusions and exemptions.
    • No permit is required for listed limited work, including fences no more than 6 feet high; retaining walls no more than 4 feet high unless supporting a surcharge; certain water tanks up to 5,000 gallons with a height-to-diameter or width ratio no greater than 2 to 1; certain sidewalks and driveways no more than 30 inches above adjacent grade; prefabricated pools less than 24 inches deep; specified playground equipment; certain window awnings; uncovered decks no more than 30 inches above grade; communications wiring; ordinary repairs; and public-service-agency equipment.
    • The listed exemptions apply only if the work does not violate a law or ordinance.
    • Ordinary repair does not include cutting load-bearing walls or structural beams, changing required means of egress, or adding or relocating listed piping, wiring, or mechanical systems.

    emergency permit application deadline: 3 business days (after emergency repair or equipment replacement) · fence height exemption: <= 6 feet · retaining wall exemption height: <= 4 feet (unless supporting a surcharge) · water tank capacity exemption: <= 5000 gallons (height-to-diameter or width ratio no greater than 2 to 1) · sidewalk or driveway height exemption: <= 30 inches (not over a basement or story below) · prefabricated pool depth exemption: < 24 inches · uncovered deck height exemption: <= 30 inches

    “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a residential building [...] shall first apply to the building code official and obtain the required permit under § 403.62a (relating to permit application).”
    3 more reviewed findings on this topic
    • Required — Construction and building work covered by the Pennsylvania Uniform Construction Code.
      “The UCC states that before beginning any construction or building work, the property owner or an authorized representative must obtain a UCC building permit”
    • Required — Construction and building work in Bedford County subject to the Pennsylvania UCC.
      “The Pennsylvania Uniform Construction Code (UCC) regulates the codes and standards of building projects in the Commonwealth. The UCC states that before beginning any construction or building work, the property owner or an authorized representative must obtain a UCC building permit”
    • Required — Commercial buildings, structures, facilities, and regulated electrical, gas, mechanical, and plumbing systems in Pennsylvania jurisdictions enforcing the Uniform Construction Code.
      “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a commercial building, structure and facility [...] shall first apply to the building code official and obtain the required permit under § 403.42a (relating to permit application).”
  • Owner-builder exemptionAvailable

    A property owner performing construction work on the owner's own primary residence in Pennsylvania without compensation, and most construction work for which Pennsylvania does not impose a statewide contractor licensure or certification requirement.

    • Pennsylvania has no statewide licensure or certification requirement for most construction contractors or their employees.
    • For home-improvement regulation, the statutory exclusion applies to work performed without compensation by the owner of the owner's private residence or residential rental property.
    • The Home Improvement Consumer Protection Act excludes construction of a new home from the definition of home improvement.
    • Municipalities may impose their own contractor licensure or certification requirements.
    “The Commonwealth of Pennsylvania currently has no licensure or certification requirements for most construction contractors (or their employees).”
  • Building code adoptedAdopted

    Building construction throughout Pennsylvania under the Pennsylvania Uniform Construction Code.

    • The UCC is administered and enforced locally by municipalities that opt in, using municipal employees or certified third-party agencies.
    • In municipalities that opt out, the Department of Labor and Industry is responsible for commercial code enforcement, while certified third-party agencies hired by property owners or contractors enforce residential UCC requirements.
    • The Department has sole jurisdiction for elevators and state-owned buildings wherever located.
    • The 2021 accessibility updates are permanently enjoined; structures must still comply with the 2018 accessibility requirements, and the injunction does not affect enforcement of non-accessibility UCC requirements.
    • The revised regulations adopting the 2018 I-Code series became effective February 14, 2022. Contract-based transition rules allow certain projects with contracts signed before that date to use the UCC in effect at the time of contract if application was made by August 14, 2022 or earlier.
    • The 2021 I-Code accessibility provisions became effective December 25, 2021, with a contract-based transition period allowing applications by June 25, 2022 or earlier.
    • Pennsylvania's Uniform Construction Code triennial update was published November 8, 2025 and became effective January 1, 2026.

    2018 I-Code regulations effective date: 2022-02-14 (For contracts signed before this date, application and permit issuance under the UCC in effect at the time of contract were allowed if application was made by 2022-08-14.) · 2021 I-Code accessibility provisions effective date: 2021-12-25 (For contracts signed before this date, application and permit issuance under the UCC in effect at the time of contract were allowed if application was made by 2022-06-25.) · 2025 triennial UCC update effective date: 2026-01-01

    “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    2 more reviewed findings on this topic
    • Adopted (with conditions) — Building construction in Bedford County under Pennsylvania's statewide Uniform Construction Code.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    • Adopted — Buildings and construction in Bedford County under Pennsylvania's Uniform Construction Code.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
  • InspectionsRequired

    Residential construction for which a Pennsylvania Uniform Construction Code permit was issued.

    • The permit holder must keep construction accessible and notify the construction code official when work is ready.
    • Required inspection areas are foundations; plumbing, mechanical, and electrical systems; frame and masonry; and wallboard.
    • The official may conduct additional inspections for UCC or municipal-ordinance compliance.
    • A final inspection and final inspection report are required.
    • Third-party agencies under contract must submit the final inspection report to the property owner, builder, and designated lender.
    “A construction code official shall inspect all construction for which a permit was issued. The permit holder shall insure that the construction is accessible for inspection.”
    3 more reviewed findings on this topic
    • Required — Construction for which a Pennsylvania UCC permit has been issued.
      “A construction code official shall inspect all construction for which a permit was issued. The permit holder shall insure that the construction is accessible for inspection.”
    • Required — Construction or changes to commercial or residential buildings and listed building systems in Bedford County.
      “Inspections are also necessary in several cases, including construction or changes to commercial or residential buildings, electrical, gas, mechanical or plumbing systems, and the installation of swimming pools or hot tubs. Additionally, manufactured and industrialized housing projects require inspections for site preparation, foundation construction, repairs, and changes in occupancy.”
    • Required — Commercial construction governed by §§ 403.41-403.48 of the Pennsylvania Uniform Construction Code.
      “A construction code official shall perform inspections to insure that the construction complies with the approved permit and the Uniform Construction Code.”
  • Certificate of occupancyRequired

    Use or occupancy of a commercial building, structure, or facility governed by the Pennsylvania Uniform Construction Code.

    • A building, structure, or facility may not be used or occupied without a certificate of occupancy issued by a building code official.
    • The certificate is issued within 5 business days after receipt of a final inspection report indicating UCC compliance.
    • A certificate may cover a portion that independently meets the UCC.
    • The certificate may be suspended or revoked for issuance in error, incorrect applicant information, or UCC violation; the owner may request a board-of-appeals hearing before revocation.
    • A temporary certificate may cover a portion before completion of all permitted work only if the portion may be occupied safely, and the official must set its validity period.
    • The certificate must include the permit number and address, permit holder information, covered portion, issuing official, applicable code edition, designated occupancy and construction classifications, special stipulations and conditions, accessibility variances, and final-inspection date.

    certificate issuance deadline: 5 business days

    “A building, structure or facility may not be used or occupied without a certificate of occupancy issued by a building code official.”
    3 more reviewed findings on this topic
    • Required — Residential buildings subject to the Pennsylvania UCC.
      “A residential building may not be used or occupied without a certificate of occupancy issued by a building code official. A building code official shall issue a certificate of occupancy after receipt of a final inspection report that indicates compliance with the Uniform Construction Code and ordinance within 5 business days or within 10 business days in a city of the first class.”
    • Required — Use or occupancy of a building or facility constructed or altered under the Pennsylvania UCC.
      “A UCC certificate of occupancy must be issued before a building or facility can be used. However, emergency repairs or equipment replacements can be made without a permit as long as an application is submitted to the building code official within three business days.”
    • Required — Use or occupancy of a residential building governed by the Pennsylvania Uniform Construction Code.
      “A residential building may not be used or occupied without a certificate of occupancy issued by a building code official.”
  • Zoning districtsPartial

    Pennsylvania zoning requirements and district information; the official state source directs applicants to the local township, borough, or city.

    • Local registrations, permits, and zoning requirements must be addressed with the township, borough, or city where the activity will occur.
    • The source does not publish a statewide zoning-district map or a single statewide zoning-district schedule.
    • This claim does not identify or aggregate individual municipal zoning districts.
    “Local registrations, permits, zoning requirements and related questions should be directed to the township, borough, or city where you will be operating.”
  • Manufactured homesLimited

    Manufactured housing assembled and shipped by the manufacturer and bearing the required federal-construction-and-safety label, including changes in occupancy, resale, relocation, additions, repairs, utility connections, and grading addressed by Pennsylvania's Uniform Construction Code.

    • For new labeled manufactured housing installed in conformity with the manufacturer's approved design, the UCC does not apply except as provided in the regulation.
    • Construction activities or processes, including utility connections and grading, that are not addressed by the manufacturer's approved design must comply with the UCC.
    • The UCC applies to alterations or repairs outside the federal manufactured-home standards and manufacturer installation instructions after assembly and shipment.
    • The UCC applies to additions after delivery to the site.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the manufactured housing is resold to a subsequent purchaser.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the original purchaser relocates the manufactured housing.
    • Pennsylvania building-permit guidance states that manufactured housing projects require inspections for site preparation, foundation construction, repairs, and changes in occupancy.
    • This state construction-code rule does not resolve local zoning, land-use siting, or utility/septic approval requirements.
    “Construction, alteration, repair or change of occupancy if the original purchaser relocates the manufactured housing.”
  • Accessory dwellingsLimited

    Accessory dwellings statewide; state UCC applies to building/occupancy, zoning permission left to municipalities

    • UCC accessory-structure exemption (carports, garages, greenhouses, sheds under 1,000 sq ft accessory to a detached one-family dwelling) does not list dwellings
    • Onlot sewage permit required before occupying a building served by an onlot system, except 72.22(e) ten-acre owner/immediate-family exemption (owner of record as of January 10, 1987, unless local ordinance requires a permit) and 72.22(h) replacement-dwelling exception
    • Local zoning of accessory dwellings was not verified in this job
    “no person may install, award a contract for construction or construct an individual or community onlot sewage system, or install, construct, occupy or use a building to be served by that system without first obtaining a permit from the local agency, except as provided in subsections (c)(e).”
  • Septic inspectionLimited

    Individual and community sewage-disposal systems before concealment or covering after construction.

    • The system may not be covered until approval to cover is given by the original permit issuer or authorized representative.
    • If 72 hours have elapsed after notification of construction completion, excluding Sundays and holidays, the applicant may cover the system unless permission has been refused.

    post-completion waiting period: 72 hours (Sundays and holidays excluded.)

    “shall be covered from view until approval to cover the same has been given by the body which issued the original permit”
  • Off-grid sanitationLimited

    Composting, incinerating, recycling, and similar water-conservation toilets used for residential or establishment sanitation statewide.

    • For a new residence or establishment, an onlot sewage system or other approved disposal method must treat washwater or excess liquid, and both facilities must be under one permit, except for the retaining-tank exception.
    • For an existing residence or facility with no alteration of the onlot system, no permit is required for installation.
    • A composting or incinerating toilet on a qualifying retaining-tank lot is treated as and permitted as a privy.
    • The device must meet manufacturer specifications and be operated and maintained to prevent pollution or health hazards.
    • Liquid discharges are prohibited unless sent to a compliant onlot sewage system or another method approved under the chapter or by DEP.
    • Recycling, incinerating, and composting toilets must bear the NSF Standard No. 41 seal.
    “an onlot sewage system or other approved method of sewage disposal shall be provided for treatment of washwater or excess liquid from the unit”
  • Well permitLimited

    Water-well drilling statewide, distinguishing commercial water-well drillers from farmers and homeowners drilling their own wells on owned or leased land.

    • Water-well drilling companies must obtain a license and permits.
    • The licensing requirement does not apply to farmers or homeowners who drill their own water wells on their own or leased land.
    • The state has construction standards for public water-supply wells but not private water wells.
    • Drillers must submit the well's construction details to the state and the well owner.

    driller license year: June 1-May 31 · annual driller license fee: 60 USD · rig permit fee: 20 USD

    “Water well drilling companies must get a license and permits to drill a well in Pennsylvania.”
  • Mandatory utility hookupConditional

    Connecting to an individual or community sewage system, or occupying a building for which such a system is to be installed, anywhere in Pennsylvania

    • A permit is required before connecting to an individual or community sewage system, indicating the site, plans and specifications comply with Act 537 standards.
    • No permit is required where a new dwelling replaces a previously existing dwelling of the same size and anticipated use that was in use within one year of anticipated completion of construction.
    • That replacement exception does not apply when an active investigation of malfunction is under way by the local agency or the department.
    • No permit may be issued by the local agency where a Department permit is required under the Clean Streams Law, or where the Department determines under its rules that a permit is not necessary for public health protection.
    • Other exceptions in Section 7 (permit-exempt systems, local ordinance requirements) not fully reviewed; local agencies also may not issue permits unless the system is consistent with the municipality's official sewage plan.
    • Water-supply (well) connection rules were not located in this source.
    “no person shall install, construct, or award a contract for construction, or alter, repair or connect to an individual sewage system or community sewage system or construct, or request bid proposals for construction, or install or occupy any building or structure for which an individual sewage system or community sewage system is to be installed without first obtaining a permit”
  • Agricultural exemptionAvailable (with conditions)

    Qualifying agricultural buildings under Pennsylvania's Construction Code Act and Uniform Construction Code.

    • The exemption applies to an agricultural building as defined by the Act: a structure used to store farm implements, hay, feed, grain, or other agricultural or horticultural products; house poultry, livestock, or other farm animals; serve as a milk house; or grow mushrooms, agricultural, or horticultural products.
    • The definition includes a qualifying carriage house owned and used by members of a recognized religious sect for housing horses and storing buggies.
    • The definition includes a structure less than 1,000 square feet used to process maple sap.
    • The structure must not include habitable space.
    • The structure must not contain spaces where agricultural products are processed, treated, or packaged.
    • The structure is not a place of occupancy by the general public.
    • Other municipal land-use, zoning, fire, electrical, health, or environmental requirements may still apply; the cited exclusion is from the Construction Code Act.

    maple sap processing structure area: < 1000 square feet (Must otherwise meet the statutory agricultural-building definition.)

    “(b) Exclusions.--This act shall not apply to any of the following: [...] (4) Any agricultural building.”
    One more reviewed finding on this topic
    • Available (with conditions) — Agricultural buildings covered by Pennsylvania's Uniform Construction Code Act.
      ““Agricultural building.” A structure utilized to store farm implements, hay, feed, grain or other agricultural or horticultural products or to house poultry, livestock or other farm animals, a milk house and a structure used to grow mushrooms. The term includes a carriage house owned and used by members of a recognized religious sect for the purposes of housing horses and storing buggies. The term shall not include habitable space or spaces in which agricultural products are processed, treated or packaged and shall not be construed to mean a place of occupancy by the general public. [...] (4) any agricultural building;”
  • Driveway accessRequired

    Construction or alteration of a driveway connected to Pennsylvania state highway land, including a driveway connecting to a PennDOT drainage facility.

    • The requirement applies to building or changing a driveway on state highway land.
    • A permit is also required if the driveway connects to a PennDOT drainage facility.
    • Paving may be considered maintenance only in some cases; PennDOT advises applicants to contact it to determine whether that exception applies.
    • Permits are usually given within 30 days when the needed information is provided and the application follows PennDOT regulations.
    • PennDOT has 60 days to review each application and aims to finish reviews within 30 days.
    • A minimum-use driveway is expected to be used by no more than 25 vehicles per day, or 50 average daily traffic.

    minimum-use driveway traffic: <= 25 vehicles per day (Equivalent to 50 average daily traffic.)

    “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land.”
    2 more reviewed findings on this topic
    • Limited — Driveways, roads, drainage, or utility facilities in Pennsylvania highway right-of-way, including Bedford County state routes.
      “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land. If it connects to a PennDOT drainage facility, you also need a permit.”
    • Required — Construction or alteration of a driveway or road on Pennsylvania state highway land, and access connecting to a PennDOT drainage facility.
      “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land.”
  • Building in a floodplainRequired

    Development activities within a Special Flood Hazard Area in Pennsylvania municipalities.

    • Municipalities must evaluate whether a project is within the SFHA and identify the type of work.
    • Municipalities must review permit applications and issue or deny permits for SFHA development.
    • Municipalities must conduct periodic inspections for compliance with proposed plans and the floodplain ordinance.
    • After completion, municipalities review required certificates and issue a certificate of occupancy when the development complies with the local floodplain ordinance.
    • Additional zoning permit requirements may apply when proposed land use changes.
    “A floodplain development permit (or its equivalent) must be issued by the municipality before development activities occur within the SFHA.”
    3 more reviewed findings on this topic
    • Limited — Construction in a floodplain subject to the Pennsylvania UCC.
      “When construction will occur in a flood plain, documentation required in Section 1612.5 of the 2018 International Building Code shall be prepared and sealed by a registered design professional.”
    • Required — UCC-regulated construction in a floodplain in Bedford County.
      “When construction will occur in a flood plain, documentation required in Section 1612.5 of the 2018 International Building Code shall be prepared and sealed by a registered design professional.”
    • Limited — Activities subject to Pennsylvania Chapter 106 Floodplain Management permitting and authorizations.
      “The site restoration permit is only for the removal of a highway obstruction or obstruction owned or maintained by the Commonwealth”
  • Short-term rentalsLimited

    Short-term lodging rentals of rooms, apartments, or houses for fewer than 30 days to the same person in Pennsylvania.

    • The Pennsylvania hotel occupancy tax rate is 6 percent.
    • Allegheny and Philadelphia counties have an additional 1 percent local hotel tax collected by the Department of Revenue.
    • Some counties impose an additional tax collected by the county treasurer.
    • If the taxpayer does not exclusively use a third-party booking site, or the broker does not collect and remit the hotel occupancy tax, the taxpayer must register with the Department of Revenue for a Sales, Use and Hotel Occupancy Tax License.
    • If a taxpayer exclusively uses a third-party booking site and the broker confirms collection and remittance, the homeowner should not register for a Sales, Use and Hotel Occupancy Tax License.

    lodging duration threshold: < 30 days (To the same person.) · Pennsylvania hotel occupancy tax rate: 6 percent

    “anyone who rents out their property to provide lodging for less than 30 days to the same person must collect and remit”
  • Campground & park staysLimited

    RV use and occupancy at Pennsylvania state park campgrounds.

    • Use must occur at a state park campground and comply with campsite rules.
    • Campers may stay up to 14 consecutive nights from Memorial Day to Labor Day.
    • Campers may camp up to 21 consecutive nights during the remainder of the year.
    • Campers must vacate and remove all equipment for 48 hours between reservations.
    • A maximum of two sleeping units is permitted per campsite, of which only one may be wheeled.
    • Campsite occupancy is limited to one family unit or one non-family unit limited to five persons per site.
    • The page does not establish statewide permission for long-term or residential RV occupancy outside state park campgrounds.

    maximum stay, Memorial Day to Labor Day: 14 consecutive nights · maximum stay, remainder of year: 21 consecutive nights · equipment-removal interval between reservations: 48 hours · maximum sleeping units per campsite: 2 units (Only one may be wheeled.) · maximum non-family occupancy: 5 persons per site (One family unit is permitted instead.)

    “maximum of two sleeping units are permitted per campsite, of which only one may be wheeled.”
    One more reviewed finding on this topic
    • Limited — Temporary camping at Pennsylvania state park campgrounds.
      “Campers may camp for up to 21 consecutive nights”
  • county zoning authorityLimited

    County zoning authority over land in Pennsylvania municipalities that lack an effective municipal zoning ordinance.

    • County zoning power is limited to land in municipalities wholly or partly within the county that have no zoning ordinance in effect when the county zoning ordinance is introduced and until the municipal zoning ordinance becomes effective.
    • A zoning ordinance enacted by a municipality other than the county repeals the county zoning ordinance pro tanto within that municipality.
    • The statute defines a county under the Pennsylvania Municipalities Planning Code as a county of the second through eighth class.
    “The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect. The enactment of a zoning ordinance by any municipality, other than the county, whose land is subject to county zoning shall act as a repeal protanto of the county zoning ordinance within the municipality adopting such ordinance.”
    One more reviewed finding on this topic
    • Limited — Pennsylvania counties adopting and enforcing zoning ordinances on unincorporated land.
      “Section 602. County Powers.--The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect.”
  • county building authorityLimited

    Pennsylvania county authority over building-code administration and enforcement for residential construction in unincorporated areas.

    • The general Pennsylvania Construction Code Act assigns administration and enforcement to municipalities, not counties.
    • A county of the second class may retain authority only if it has adopted a plumbing code and accompanying rules and regulations under the Local Health Administration Law.
    • The retained authority is limited to promulgating and enforcing that plumbing code and making changes that meet the minimum requirements of the Uniform Construction Code.
    • The official Department of Labor and Industry page states that residential UCC requirements in opt-out municipalities are enforced by certified third-party agencies hired by property owners or contractors.
    “A county of the second class that has adopted a plumbing code and accompanying rules and regulations pursuant to the act of August 24, 1951 (P.L.1304, No.315), known as the Local Health Administration Law, shall retain the authority to promulgate and enforce such plumbing code and to make such changes as it deems necessary, provided that such changes meet the minimum requirements as defined in the Uniform Construction Code.”

Set by your town or city, not the county

In Pennsylvania, zoning is adopted by each town or city, so Bedford County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Lot coverage
  • Building height
  • Camping on your land

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Bedford County, Pennsylvania

Is Bedford County a good place to live off-grid or homestead?

Bedford County scores 73/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and mixed durability signals.

How much does land cost in Bedford County, Pennsylvania?

Land in Bedford County runs about $5,010 per acre, based on the latest county data.

What is the water situation in Bedford County?

Bedford County gets about 40.8" of rain a year, with severe drought in roughly 0.6% of years.

How remote is Bedford County?

A representative private-land location has about 33,457 people within a 30-minute drive and 3,569,024 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.