Bolthole Index

Allegheny County, Pennsylvania

Zoning, building permits and septic rules in Rosslyn Farms, Pennsylvania

The Borough of Rosslyn Farms, in Allegheny County, Pennsylvania, has its own zoning code1, and the borough office takes zoning and building permit applications and forwards them to Harshman, LLC for review2. A zoning permit application costs $25 for residential property2. Septic permits for on-lot systems are issued by the Allegheny County Health Department, not the borough3.

At a glance

Zoning
Yes, the borough's own zoning code (Chapter 190)1
Zoning permit
Apply to the borough secretary; $25 residential2
Building permit
Applied for at the borough office; review by Harshman, LLC2
Septic permit
Allegheny County Health Department3
Minimum lot, R-2 single family
7,500 sq ft, 50 feet wide4
Owner-builder
No statewide contractor license for most construction work5

Who to call

Building permits

Borough of Rosslyn Farms (Borough Secretary)

Zoning permit and building permit applications, street opening permits, and sale-time dye test and sewer lateral inspection applications; reviews are done by Harshman, LLC

412-279-8108

[email protected]

200 Rosslyn Road, Carnegie, PA 15106

Septic permits

Allegheny County Health Department, Plumbing Program

Plumbing permits and the contact point for private on-lot sewage permitting

412-578-8036

2121 Noblestown Road, Suite 207, Pittsburgh, PA 15205

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of Rosslyn Farms means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Rosslyn Farms have zoning, and what does it mean for lots and setbacks?

Rosslyn Farms is a borough in Allegheny County, and the borough enforces its own zoning code, Chapter 190 of the borough code1. Zoning does not come from the county, which leaves zoning to the individual municipality6.

Only the R-2 medium density residential district has been checked here, and R-2 is described as preserving single family development7. In R-2, a single family lot needs at least 7,500 sq ft and 50 feet of width4. Required yards are 25 feet in front, 25 feet in the rear for a principal structure (5 feet for accessory structures) and 10 feet on the side8. Lot coverage is capped at 40%9, and a single family dwelling may not exceed 35 feet in height while accessory structures are limited to 15 feet10.

Other districts, accessory dwellings and minimum dwelling size were not confirmed; ask the borough secretary.

Do you need a building permit in Rosslyn Farms, and who issues it?

In the Borough of Rosslyn Farms, the process starts with a zoning permit application submitted to the borough secretary with a $25 fee for residential property2. Once received, the application is forwarded to Harshman, LLC, which handles zoning, building and code enforcement for the borough2.

If the zoning permit is approved, the project may then need a building permit, applied for at the borough office2. Building permit fees are paid directly to Harshman2. Pennsylvania's Uniform Construction Code requires a permit before residential construction, enlargement, alteration or a change of occupancy begins11, and a certificate of occupancy before a residential building is used12.

Allegheny County does not issue municipal building permits; property owners file them in the municipality where the work happens13.

How do septic permits work in Rosslyn Farms?

Septic permits in Allegheny County, including for addresses inside Rosslyn Farms, are handled by the county Health Department's Sewage Enforcement Officers under Pennsylvania's Act 5373. A permit from the Department is required before any construction of an on-lot disposal system14. Pennsylvania also requires a permit before a building served by an on-lot system is occupied or used15.

Whether a given Rosslyn Farms address is on public sewer or on-lot disposal was not confirmed; the borough code includes a sewer chapter, so ask the borough secretary before assuming a septic system is possible. The county's rule is that an occupied building within 150 feet of an available public sewer may not keep using an individual system16.

The borough also requires a dye test and televised sewer lateral inspection before a property is sold or transferred, with a $40 application fee filed at least 45 days before closing2.

Can you live in an RV or tiny home in Rosslyn Farms?

We could not confirm whether Rosslyn Farms allows RV occupancy, tiny homes or manufactured homes on a lot. The R-2 district's authorized use list names the single family dwelling as its principal use7, and no accessory dwelling was found there. Pennsylvania's statewide RV rules cover state park campgrounds, not private lots17.

For any of these questions, ask the borough secretary at 412-279-81082, who forwards zoning questions to Harshman, LLC.

Building a home in Rosslyn Farms: the steps, in order

  1. Confirm the zoning district and its lot, setback and height standards with the borough secretary1.
  2. Submit the zoning permit application and fee to the borough office2.
  3. If approved, submit the building permit application; Harshman, LLC reviews it and collects its fees2.
  4. Get a county septic permit if the lot uses on-lot sewage3.
  5. Request a street opening permit if work goes under a borough road2.
  6. Obtain a PennDOT highway occupancy permit if the driveway meets a state highway18.
  7. Pass the required inspections and get a certificate of occupancy before moving in12.

What stays with Allegheny County, and what to check before you buy

Septic permits and plumbing permits stay with the Allegheny County Health Department319. For land outside borough limits, see the Allegheny County page.

Before buying, check whether the parcel lies in a Special Flood Hazard Area, where the municipality must issue a floodplain development permit before work begins20. Allegheny County's effective property tax rate is 1.6%21, so confirm the borough's own millage with the borough office. Pennsylvania has no statewide license for most construction contractors5, but the borough may still require permits for sheds, fences, decks and pools2.

Watch-outs

  • Only the R-2 district's standards were reviewed; other Rosslyn Farms districts may have different lot sizes and setbacks7.
  • Rules for accessory dwellings, RVs, tiny homes, minimum dwelling size, short-term rentals and permit fees beyond the $25 zoning application were not confirmed; ask the borough secretary at 412-279-81082.
  • Borough permit paths and fees can change; building permit fees are paid directly to Harshman, LLC, not the borough2.

Sources

  1. Borough of Rosslyn Farms Code, Art. VIII R-2 Medium Density Residential District (Borough of Rosslyn Farms), quoted and re-checked
  2. Borough of Rosslyn Farms (Borough Secretary) (rosslynfarmspa.gov)
  3. Water Pollution Control, quoted and re-checked
  4. Borough of Rosslyn Farms Code, Art. VIII R-2 Medium Density Residential District (Borough of Rosslyn Farms), quoted and re-checked
  5. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  6. Land Use Planning, quoted and re-checked
  7. Borough of Rosslyn Farms Code, Art. VIII R-2 Medium Density Residential District (Borough of Rosslyn Farms), quoted and re-checked
  8. Borough of Rosslyn Farms Code, Art. VIII R-2 Medium Density Residential District (Borough of Rosslyn Farms), quoted and re-checked
  9. Borough of Rosslyn Farms Code, Art. VIII R-2 Medium Density Residential District (Borough of Rosslyn Farms), quoted and re-checked
  10. Borough of Rosslyn Farms Code, Art. VIII R-2 Medium Density Residential District (Borough of Rosslyn Farms), quoted and re-checked
  11. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  12. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  13. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  14. Water Pollution Control, quoted and re-checked
  15. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  16. Article XIV Sewage Management, quoted and re-checked
  17. RV and Tent Campsites (Pennsylvania statewide rule), quoted and re-checked
  18. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  19. Project Plans and Permitting, quoted and re-checked
  20. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  21. Effective property tax rate: Bolthole Index county data

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Rosslyn Farms

Borough of Rosslyn Farms’s own rules

  • Local zoningPresent

    Land inside Rosslyn Farms borough; Chapter 190 Zoning of the borough code

    • Evidence is from the R-2 district article; Ordinance 419 (2025-06-09) zoning amendment is listed on the page.
    “the purpose of the r-2, medium density residential, district is to preserve the established pattern of single family development in medium density areas of rosslyn farms”
  • Zoning districtsPartial

    Rosslyn Farms borough zoning districts; only R-2 reviewed

    • Other districts not reviewed.
    “in the r-2, medium density residential, district only the following uses are authorized: a. permitted uses 1. principal uses a. single family dwelling”
  • Minimum lot sizeSpecified

    R-2 Medium Density Residential district, Rosslyn Farms borough (single family dwellings)

    • Other districts not reviewed.
    • Conditional uses and special exceptions may modify standards.

    minimum lot area single family: 7500 sq ft (all other principal uses: 1 acre) · minimum lot width: 50 feet

    “a. minimum lot area: single family dwellings: 7,500 sq. ft. all other principal uses: 1 acre b. minimum lot width: all uses: 50 feet”
  • SetbacksSpecified

    R-2 Medium Density Residential district, Rosslyn Farms borough

    • Special yard requirements in § 190-1403 and projections in § 190-1404 not reviewed.

    front yard: >= 25 feet · rear yard principal: >= 25 feet (accessory 5 feet) · side yard: >= 10 feet (principal and accessory)

    “d. minimum front yard: 25 feet e. minimum rear yard: principal structures: 25 feet accessory structures: 5 feet f. minimum side yard: principal structures: 10 feet accessory structures: 10 feet”
  • Lot coverageSpecified

    R-2 Medium Density Residential district, Rosslyn Farms borough

    maximum lot coverage: <= 40 percent

    “c. maximum lot coverage: 40% d. minimum front yard: 25 feet”
  • Building heightSpecified

    R-2 Medium Density Residential district, Rosslyn Farms borough

    • Height exceptions in § 190-1405 not reviewed.

    single family dwelling max height: <= 35 feet (2-1/2 stories) · accessory structure max height: <= 15 feet (1 story)

    “j. maximum height: single family dwellings: 2-1/2 stories, but not more than 35 feet all other principal structures: 3 stories, but not more than 45 feet all accessory structures: 1 story, but not more than 15 feet”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Rosslyn Farms or Allegheny County directly.

  • Building permit — Building permits in Rosslyn Farms borough
  • Owner-builder exemption — Owner-builder exemption in Rosslyn Farms borough
  • Building code adopted — Building code in Rosslyn Farms borough
  • Inspections — Building inspections in Rosslyn Farms borough
  • Certificate of occupancy — Certificates of occupancy in Rosslyn Farms borough
19 more unanswered
  • Minimum dwelling size
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Rosslyn Farms publishes no rule on the point, not that none exists. Allegheny County’s page lists the county offices to call.

← All of Allegheny County: county rules, score and offices