Garibaldi, Oregon regulates land use and zoning inside city limits, and every building project needs an approved city land use permit before a structural permit is issued12. Structural building permits themselves come from Tillamook County Community Development3. We could not confirm who issues septic permits inside the city, so ask the county's onsite wastewater office4.
At a glance
- Zoning
- Yes, city zoning inside Garibaldi (Title 18 of the municipal code)1
- Land use permit
- Required from the city before any structural permit2
- Building permit
- Required; structural permits come from Tillamook County Community Development25
- Septic
- Not confirmed inside city limits; county onsite wastewater office is the place to ask6
- Accessory dwelling
- One per lot, owner-occupied, up to 600 sq ft7
- Short-term rentals
- Conditional use in R-1, only south of US 101 or privately accessed from Garibaldi Avenue8
- Owner-builder
- State exemption covers some structural requirements, not the permit itself9
Who to call
Planning & zoning
City of Garibaldi (land use, planning and zoning)
City land use permit applications, planning and zoning questions inside Garibaldi city limits
107 Sixth St.
Building permits
Tillamook County Department of Community Development - Building Division
Structural building permits, plan review and inspections, including for addresses inside Garibaldi
1510-B Third Street, Tillamook, OR 97141
Septic permits
Tillamook County Community Development - Onsite Wastewater/Environmental Programs Division
Site evaluations and permits for new and repaired onsite wastewater systems in Tillamook County
1510-B Third Street, Tillamook, OR 97141
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Garibaldi means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Garibaldi, Oregon have zoning, and what does it mean for lots, RVs and rentals?
The City of Garibaldi regulates land use inside its municipal borders1. Zoning sits in Title 18 of the city's municipal code, so a lot inside Garibaldi follows city zones rather than Tillamook County's Land Use Ordinance1. The county's own zoning rules are for unincorporated land; see the Tillamook County page for land outside the city.
Two city rules matter most to buyers. Garibaldi allows one accessory dwelling unit per lot, the primary home must be owner-occupied (or a family caretaker must manage it), and the unit may be at most 600 square feet or a third of the house's living area, whichever is less7. In the R-1 zone, short-term rentals are a conditional use only south of US 101 or where access is private from Garibaldi Avenue8.
We could not confirm the city's RV, tiny home, minimum lot size or setback rules for each district. Email the city or call3 before you assume any of those.
Do you need a building permit in Garibaldi, and who issues it?
Yes, building in Garibaldi takes two steps from two offices. First, the city must approve a Garibaldi Land Use Permit Application before any structural permit is issued23. Second, Tillamook County Community Development regulates structural code inside Garibaldi and issues the structural permit310.
The county states that permits are required for new construction and for alterations and additions, covering structural, plumbing, mechanical and electrical work5. Oregon's owner-builder exemption relaxes only certain structural requirements such as ceiling heights and room sizes; the owner-built dwelling still needs a building permit9.
How do septic permits work inside Garibaldi?
We could not confirm who handles septic permits for lots inside Garibaldi city limits; many city lots are served by municipal sewer and water, and the city's utility rules were not available to us. Ask the city before you plan a septic system on a city lot3.
Outside municipal sewer, Tillamook County administers Oregon's septic rules as DEQ's contractor and requires a septic permit, with a favorable site evaluation on file, before a new system is installed611. Call the county's onsite wastewater office to confirm which applies to your address4.
Building a home in Garibaldi: the steps, in order
- Confirm the zone and what it allows with the city (email [email protected] or call3).
- Submit the Garibaldi Land Use Permit Application and wait for approval2.
- Confirm sewer or septic with the city and the county onsite wastewater office4.
- Apply for the structural permit with Tillamook County Community Development, Building Division10.
- Schedule inspections through the county; the county states a permit expires if the first inspection does not happen within 180 days12.
- Get the certificate of occupancy before moving in13.
What stays with Tillamook County, and what to check before you buy in Garibaldi
Structural building permits and inspections stay with Tillamook County even inside Garibaldi3. The county's rules for unincorporated land, including its ADU, RV and setback ordinances, do not apply inside city limits; use the Tillamook County page for land outside the city.
Before buying, ask the city about floodplain and hillside overlay mapping, since we could not confirm the floodplain rule inside the city. Oregon requires a landowner permit and bond for anyone drilling their own water-supply well, which matters on any lot not on city water14. Tillamook County averages about 101 inches of rain a year, and conventional septic soils are rare there, so expect a site evaluation1516.
Watch-outs
- The R-1 height and lot coverage figures we saw come from a 2001 ordinance and may have been replaced; confirm current limits with the city before designing1718.
- A city land use permit approval does not replace the county's structural permit; both are needed2.
- We could not confirm septic authority, RV rules, setbacks or minimum lot size inside Garibaldi; ask the city at3 and the county at4.
Sources
- Building & Development – City of Garibaldi, Oregon (Garibaldi), quoted and re-checked
- Building & Development – City of Garibaldi, Oregon (Garibaldi), quoted and re-checked
- City of Garibaldi (land use, planning and zoning) (garibaldi.gov)
- Tillamook County Community Development - Onsite Wastewater/Environmental Programs Division (tillamookcounty.gov)
- tillamookcounty.gov, quoted and re-checked
- Tillamook County FAQs, quoted and re-checked
- Building & Development – City of Garibaldi, Oregon (Garibaldi), quoted and re-checked
- Building & Development – City of Garibaldi, Oregon (Garibaldi), quoted and re-checked
- 2023 Oregon Residential Specialty Code - Chapter 1, quoted and re-checked
- Tillamook County Department of Community Development - Building Division (tillamookcounty.gov)
- Instructions for Septic System Construction/Installation Permits, quoted and re-checked
- Building, quoted and re-checked
- 2023 Oregon Residential Specialty Code - Chapter 1, quoted and re-checked
- Landowner Constructed Wells, quoted and re-checked
- Annual precipitation: Bolthole Index county data
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Garibaldi Ordinance No. 251 (2001) (Garibaldi), quoted and re-checked
- Garibaldi Ordinance No. 251 (2001) (Garibaldi), quoted and re-checked
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.