Davis, Oklahoma requires building permits for new structures and for enlarging, altering, or moving existing buildings.1 Davis has its own zoning districts inside city limits; use the city’s land-use rules when buying in this Murray County community.2 Oklahoma DEQ handles septic authorization, while Davis requires tiny homes in its tiny-home district to connect to city water and sewer.34
At a glance
- Building permits
- Required for new structures and enlarging, altering, or moving existing buildings1
- Zoning
- City zoning applies inside Davis city limits2
- Septic permits
- DEQ Authorization to Construct required for new or modified systems5
- Tiny homes
- Allowed only in the tiny-home residential district; city water and sewer required64
- RV living
- Flood-zone conditions apply; general private-land occupancy is unconfirmed7
- Minimum home size
- Single-family residential district requires 700 square feet of living space8
- Floodplain development
- Separate city approval required for buildings, fill, or grading in a floodplain1
Who to call
Building permits
Davis Community Development Services
Residential building-permit questions and city planning and zoning; commercial project questions go to [email protected].
Floodplain permits
Davis Floodplain Administrator
Floodplain development permits inside Davis city limits
Septic permits
Oklahoma Department of Environmental Quality
Authorization to Construct, review and inspection for on-site sewage systems in Murray County
707 N Robinson Oklahoma City, OK, 73102
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Davis means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Davis, OK?
Davis requires a building permit for a new structure and for enlarging, altering, or moving an existing building.1 Davis’s Community Development Services directs residential and commercial applicants through the next steps; contact the office before starting work.1 Davis’s tiny-home installation provisions also expressly require a building permit.9
Building without the required city approval can result in fines, a stop-work order, or removal of the structure.1 Oklahoma minimum building standards apply to residential and commercial construction, and municipalities may enforce higher standards.10 Ask Community Development Services which code edition and inspections apply to the proposed home.
Who handles Davis building permits and zoning questions?
Davis Community Development Services guides construction and land-use projects through city planning, building permits, and zoning.1 Residential project questions go to [email protected]; commercial project questions go to [email protected], and Davis City Hall can direct either type of inquiry at 580-369-3333.1
Davis requires registration for electrical, plumbing, and mechanical contractors and journeymen, and building projects will not be approved without actively registered trade contractors.1 Davis also requires a contractor compliance letter after each contractor’s work, before the final inspection and certificate of occupancy.1 Ask the office for the application requirements, current building-permit fees, and inspection schedule for your project.
Does Davis have zoning, minimum lot sizes and home-size rules?
Davis has municipal zoning, including single-family residential, general agricultural, manufactured-home and tiny-home districts.11 In Davis’s R-1 single-family district, each dwelling and its accessory buildings require at least 7,000 square feet of lot area.12 A residential building in that district requires at least 700 square feet of living space, excluding porches, garages and spaces without heating or cooling.8
Davis’s A-1 general agricultural district instead requires at least 1 acre for each dwelling and its accessory buildings.13 In Davis’s R-1 district, main and accessory buildings may cover at most 30% of an interior lot or 35% of a corner lot.14 Ask the city planner to confirm the parcel’s district and applicable setbacks before commissioning a site plan.
Can you live in an RV or tiny home on land in Davis?
Davis allows tiny homes only in its R-5 tiny-home residential district, with a maximum of 1 tiny home per lot; other residential, commercial and industrial districts do not allow their placement.6 Davis tiny homes must connect to city water and sewer, and composting toilets are prohibited under the tiny-home requirements.415 Individually sold tiny-home lots in a designated zone must meet subdivision regulations, front on a public street, and contain at least 7,000 square feet.16
In Davis flood zones A and AE, an RV must stay fewer than 180 consecutive days, remain fully licensed and ready for highway use, or meet the specified permit, elevation and anchoring requirements.7 Those flood-zone options do not establish general permission to live in an RV on private land; ask Community Development Services about occupancy and temporary camping at the proposed address.
How do septic permits work inside Davis?
Oklahoma DEQ issues the Authorization to Construct for a new or modified on-site sewage system serving property inside Davis.3 The Report for On-Site Sewage must be reviewed before DEQ issues that authorization, and alternative systems require DEQ approval before installation.5 A new or modified system must be inspected and approved by DEQ, or installed, self-inspected and approved by a certified installer, before operation.17
Murray County’s soil data rate only 7.7% of soils as not limited for a conventional septic drain field; that countywide figure does not decide whether an individual Davis lot can support septic.18 Plan for a site evaluation rather than assuming a conventional system will work.18 For a Davis tiny home, the city’s water-and-sewer connection requirement still applies.4
Building a home in Davis: what steps should you take in order?
- Ask Davis Community Development Services to confirm the parcel’s zoning district and the building-permit application steps for the proposed home.12
- Check floodplain status with the Davis Floodplain Administrator: buildings, fill and grading in a floodplain require a separate floodplain development permit.19
- Resolve sanitation before installation: obtain DEQ authorization for a new or modified septic system, or plan the required city water and sewer connections for a tiny home.54
- Arrange registered electrical, plumbing and mechanical contractors and obtain city approval before construction.1
- Coordinate contractor compliance letters, final building inspection and certificate-of-occupancy steps with Davis; complete septic inspection and approval before using an on-site system.117
For property outside Davis city limits, use the Murray County guide for the unincorporated-area zoning answer.20
Watch-outs
- Davis’s tiny-home district requires city water and sewer and prohibits composting toilets, so a septic proposal does not replace those connections.415
- Davis floodplain development approval covers fill and grading as well as buildings; contact the city Floodplain Administrator before changing the site.19
- We could not confirm general private-land RV occupancy, temporary camping, owner-builder exemptions or municipal building-permit fees in Davis; ask Community Development Services about the specific project.1
Sources
- Davis Community Development Services (davisok.city)
- Sec. 11-8A-4. R-1 Single-Family Residential District: Site and structure requirements (Davis), quoted and re-checked
- Oklahoma DEQ On-Site Sewage Information (Davis), quoted and re-checked
- Sec. 11-8E-3. R-5 Tiny Home Residential District: Site and structure requirements (Davis), quoted and re-checked
- Oklahoma DEQ On-Site Sewage Information (Davis), quoted and re-checked
- Sec. 11-8E-1. R-5 Tiny Home Residential District: Scope of provisions (Davis), quoted and re-checked
- Sec. 13-4-2. Flood control: Specific standards (Davis), quoted and re-checked
- Sec. 11-8A-4. R-1 Single-Family Residential District: Site and structure requirements (Davis), quoted and re-checked
- Sec. 11-8D-5. R-4 variance requirements (Davis), quoted and re-checked
- Adopted Building Codes (Oklahoma statewide rule), quoted and re-checked
- Sec. 11-8A-4. R-1 Single-Family Residential District: Site and structure requirements (Davis), quoted and re-checked
- Sec. 11-8A-4. R-1 Single-Family Residential District: Site and structure requirements (Davis), quoted and re-checked
- Sec. 11-6-4. A-1 General Agricultural District: Site and structure requirements (Davis), quoted and re-checked
- Sec. 11-8A-4. R-1 Single-Family Residential District: Site and structure requirements (Davis), quoted and re-checked
- Sec. 11-8E-3. R-5 Tiny Home Residential District: Site and structure requirements (Davis), quoted and re-checked
- Sec. 11-8E-3. R-5 Tiny Home Residential District: Site and structure requirements (Davis), quoted and re-checked
- Oklahoma DEQ On-Site Sewage Information (Davis), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Davis Floodplain Administrator (davisok.city)
- Oklahoma law on county zoning and building authority
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.