Delaware County, Oklahoma

Zoning, building permits and septic rules in the Town of Bernice, Oklahoma

The Town of Bernice, Oklahoma, in Delaware County, has its own zoning ordinance, and a building permit is required to erect, move or structurally alter a building inside town limits12. A $15 zoning clearance comes first, then a $30 building permit3. Septic permits are not a town matter: Oklahoma DEQ issues them4.

At a glance

Zoning
Yes: the town adopted its own zoning ordinance1
Building permit
Required to erect, move or structurally alter a building inside town limits; $302
Zoning clearance
Issued first by the zoning administrator; $153
Zoning districts
A-1, R-1, R-2, C-1, C-2, C-3, I-1, I-25
Septic
Oklahoma DEQ issues an Authorization to Construct6
Domestic well
No state water permit for domestic use7

Who to call

Septic permits

Oklahoma DEQ Environmental Complaints & Local Services (ECLS) – On-Site Sewage Program

Authorization to Construct, inspections and records for on-site sewage (septic) systems statewide, including Delaware County

(405) 702-6100

707 N Robinson, Oklahoma City, OK 73102

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Town of Bernice means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Bernice, Oklahoma have zoning?

Yes. The Town of Bernice enacted its own zoning ordinance, which applies to land inside Bernice town limits1. The ordinance sets eight districts: A-1 general agricultural, R-1 single-family residential, R-2 general residential, C-1, C-2 and C-3 commercial, and I-1 and I-2 industrial5. The planning commission keeps the zoning map, so the district of a specific lot is the first thing to confirm before buying5.

We could not confirm the minimum lot size, setbacks, minimum dwelling size, or the rules for RVs, tiny homes and manufactured homes in each district. Those depend on the district chapters of the town's zoning code, so ask the Bernice town clerk-treasurer for the district rules that apply to a given parcel.

Do you need a building permit in Bernice, and who issues it?

Yes. Inside the Town of Bernice, a building permit must be obtained before a structure or building is erected, moved or structurally altered2. The building permit costs $302.

The town's process has two steps. A zoning clearance permit comes first from the zoning administrator, and it costs $153. The zoning administrator grants or denies the clearance within three days8. The clearance is not a building permit; it authorizes the building inspector to issue the building permit8. Applications are filed with the town clerk-treasurer, and they need a scaled plat plan and a declaration of use, plus a survey where the boundaries are not clearly defined2.

A certificate of occupancy from the town clerk-treasurer is required for a change in the use of land, a building or a structure; a new building with a building permit does not need a separate one unless the use changes or the intended use is not clearly stated9.

How do septic permits work inside Bernice?

Septic permits for Bernice addresses come from Oklahoma DEQ, not from the town4. Before a new on-site sewage system is installed or an existing one modified, DEQ must issue an Authorization to Construct6. DEQ also has to review the Report for On-Site Sewage before issuing it6.

New installations must then be inspected and approved by DEQ, or installed, self-inspected and approved by a certified installer, before the system is used10. Individuals who are not DEQ-certified may install only one system per calendar year11.

We could not confirm whether Bernice requires a connection to town sewer where it is available; ask the town clerk-treasurer before planning a septic system on a lot in town. Delaware County soils matter too: USDA rates 32.7% of the county's soils as not limited for a conventional drain field, so most lots need a site evaluation and some need an engineered system12.

Building a home in Bernice: the steps, in order

  1. Find the lot's zoning district on the planning commission's zoning map and confirm the use you want is allowed there5.
  2. Apply to the town clerk-treasurer for a zoning clearance permit with a scaled plat plan; it costs $15 and the zoning administrator decides within three days38.
  3. Obtain the building permit from the building inspector; it costs $302.
  4. If the lot will not use town sewer, buy and obtain an Authorization to Construct from Oklahoma DEQ before installing septic6.
  5. Have the septic system inspected and approved by DEQ or a certified installer before it is used10.
  6. Obtain a certificate of occupancy if the use of the building changes from what the building permit stated9.

What stays with Delaware County and the state?

Septic systems are overseen by Oklahoma DEQ for Delaware County, including addresses inside Bernice4. A domestic groundwater well for household use, livestock or irrigation of less than 3 acres does not need an Oklahoma Water Resources Board water permit7. A driveway that connects to a state highway needs an approved ODOT driveway agreement before work starts on the right-of-way13.

The town's zoning and building permit rules above apply only inside town limits. For land outside Bernice, see the Delaware County page; Delaware County has adopted no county zoning ordinance14. Floodplain rules are set by participating local communities, so ask the town clerk-treasurer whether a lot lies in a mapped flood hazard area15.

Watch-outs

  • Bernice requires a building permit, but we could not confirm the building code, inspection schedule or owner-builder rules that apply inside town limits; ask the town clerk-treasurer before you hire a contractor or do your own work2.
  • Zoning clearance comes before the building permit, and the $15 clearance fee is separate from the $30 building permit fee3.
  • A zoning district decides what can go on a lot in town, and we could not confirm district-by-district lot sizes and setbacks, so check the code for the specific district before buying5.

Sources

  1. Bernice, OK Code of Ordinances, Chapter 153: Zoning (Town of Bernice), quoted and re-checked
  2. Bernice, OK Code of Ordinances, Chapter 153: Zoning (Town of Bernice), quoted and re-checked
  3. Bernice, OK Code of Ordinances, Chapter 153: Zoning (Town of Bernice), quoted and re-checked
  4. On-Site Sewage Information, quoted and re-checked
  5. Bernice, OK Code of Ordinances, Chapter 153: Zoning (Town of Bernice), quoted and re-checked
  6. On-Site Sewage Treatment (Oklahoma statewide rule), quoted and re-checked
  7. Apply for a Water Permit (Oklahoma statewide rule), quoted and re-checked
  8. Bernice, OK Code of Ordinances, Chapter 153: Zoning (Town of Bernice), quoted and re-checked
  9. Bernice, OK Code of Ordinances, Chapter 153: Zoning (Town of Bernice), quoted and re-checked
  10. On-Site Sewage Information, quoted and re-checked
  11. On-Site Sewage Information, quoted and re-checked
  12. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  13. Instructions for Driveway Permit Application (Oklahoma statewide rule), quoted and re-checked
  14. Oklahoma law on county zoning and building authority
  15. Floodplain Management (Oklahoma statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Bernice

Town of Bernice’s own rules

  • Building permitRequired

    Erecting, moving or structurally altering a building or structure inside Bernice town

    • Application needs a scaled plat, declaration of use, and survey where boundaries are not clearly defined
    • A separate zoning clearance permit is issued first by the zoning administrator
    • Applications are filed with the town clerk-treasurer

    building permit fee: 30 USD

    “whenever any structure or building is to be erected, moved or structurally altered, a building permit shall first be obtained from the building inspector. the cost of such permit shall be $30.”
  • Certificate of occupancyRequired

    Change in use of land, building or structure inside Bernice town

    • Occupancy permit not required when a building permit is issued for a new building, except where the use changes or the intended use is not clearly stated on the building permit
    “no change shall be made in the use of any land, building or structure after the adoption of this chapter until a certificate of occupancy is obtained from the town’s clerk-treasurer”
  • Local zoningPresent

    Land inside Bernice town limits

    • Ordinance 2009-3, passed 5-15-2009; code current through ord. 03142024-9, passed 4-7-2025
    “this chapter is enacted in pursuance of the authority granted by the legislature of the state in 11 o.s. §§ 43-101 et seq., and shall be known as the “zoning ordinance of the town of bernice”, and shall be cited as such.”
  • Zoning districtsPublished

    Zoning districts inside Bernice town

    • Districts: A-1, R-1, R-2, C-1, C-2, C-3, I-1, I-2
    • Zoning map is kept by the planning commission
    “153.053 a-1, general agricultural district 153.054 r-1, single-family residential district 153.055 r-2, general residential district”
  • Permit feesPublished

    Zoning clearance and building permit fees inside Bernice town

    • Rezoning petition filing fee is $300 plus notice and publication costs (§ 153.017(d))

    zoning clearance permit fee: 15 USD · building permit fee: 30 USD

    “zoning clearance permits shall not be issued until a fee of $15 shall have been paid.”
  • Permit processPublished

    Zoning clearance permit process inside Bernice town

    • Zoning clearance permit is not a building permit; it authorizes the building inspector to issue the building permit
    • Application must include a plat plan drawn to scale

    zoning administrator decision time: <= 3 days

    “within three days, the zoning administrator shall grant or deny said zoning clearance permit in accordance with the terms of this chapter.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Bernice or Delaware County directly.

  • Owner-builder exemption — Owner-builder exemption inside Bernice town
  • Building code adopted — Building code adoption inside Bernice town
  • Inspections — Construction inspections inside Bernice town
  • Minimum dwelling size — Minimum dwelling size in R-1 and A-1 districts inside Bernice town
  • Minimum lot size — Minimum lot size in R-1 and A-1 districts inside Bernice town
19 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Bernice publishes no rule on the point, not that none exists. Delaware County’s page lists the county offices to call.

← All of Delaware County: county rules, score and offices