Zoning, building permits and septic rules in Village of Felicity, Ohio

Village of Felicity is a village in Clermont County, Ohio. Septic permits inside Village of Felicity come from Clermont County (Clermont County Public Health (New Construction Septic Permits)). 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Clermont County page.

Answers from the rulebook for Village of Felicity

Rules another office applies inside Village of Felicity

Village of Felicity does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitLimited

    Residential construction or work inside Felicity village limits for which approval is required under the Residential Code of Ohio.

    • The source limits this requirement to construction or work for which approval is required.
    • The owner or authorized representative must notify the residential building department when work is ready for inspection.
    “Construction or work for which an approval is required shall be subject to inspection. It shall be the duty of the owner or the owner’s duly authorized representative to notify the residential building department when work is ready for inspection.”
  • Building code adoptedAdopted (with conditions)

    One-, two-, and three-family residential buildings inside Felicity village limits that are within the Residential Code of Ohio's scope.

    • The cited rule concerns residential construction documents and work for which approval is required.
    • The locally certified residential building department determines approval and enforcement for a project.
    “Residential Code of Ohio for One-, Two-, and Three-Family Dwellings”
  • InspectionsRequired

    Residential construction or work inside Felicity village limits for which approval is required under the Residential Code of Ohio.

    • The work must remain accessible and exposed until inspected to verify compliance.
    • If inspectors do not inspect within four days, excluding Saturdays, Sundays, and legal holidays, work may proceed.
    • Subsequent work may proceed only to the next required inspection.

    inspection response period: <= 4 days (Excludes Saturdays, Sundays, and legal holidays after work is ready for inspection.)

    “Construction or work for which an approval is required shall be subject to inspection. It shall be the duty of the owner or the owner’s duly authorized representative to notify the residential building department when work is ready for inspection.”
  • Certificate of occupancyRequired

    New residential buildings and residential alterations or additions inside Felicity village limits within the Residential Code of Ohio's scope.

    • A residential building may not be used or occupied until the residential building official issues a certificate of occupancy or certificate of completion.
    • For a certificate of occupancy, approved construction documents, final tests and inspections, and no outstanding building-official orders are required.
    • Partial occupancy is available only if the official determines the space can be safely occupied before full completion.
    “No residential building or structure, in whole or in part, shall be used or occupied until the residential building official has issued an approval in the form of a certificate of occupancy or certificate of completion in compliance with this section.”
  • Who permits septicCounty (with conditions)

    On-site septic systems serving property inside Felicity village limits, which is in Clermont County.

    • This finding concerns on-site septic systems and operation-permit inspections, not the village's municipal wastewater treatment system.
    • The health district schedules routine operation inspections township by township.
    “Clermont County Board of Health has authority under the Ohio Administrative Code to conduct inspection of septic systems.”
  • Septic inspectionRequired

    On-site septic systems inside Felicity village limits that are subject to Clermont County Public Health operation-permit inspections.

    • Routine inspections are scheduled township by township.
    • An inspection evaluates system components and visible signs of sewage or gray-water failure.
    • Operation-permit fee invoices are mailed after inspection; the owner has 30 days to pay, late fees apply after 60 days, and unpaid fees may become a tax lien after 90 days.

    operation permit payment deadline: <= 30 days (Measured after invoice is mailed to the property owner.) · late fees begin: >= 60 days (After invoice.) · tax lien threshold: >= 90 days (Outstanding fees may be placed as a tax lien; additional late fees apply.)

    “For routine operation inspections (otherwise known as Operation Permits)”
  • Permit processPartial

    Residential construction inside Felicity village limits for which approval is required under the Residential Code of Ohio.

    • Construction documents must be submitted in two or more sets with each application for approval.
    • The residential building official issues a certificate of plan approval when documents comply.
    • This is a statewide building-code process and does not establish the identity of Felicity's locally responsible building department.

    construction document sets: >= 2 sets (Submitted with each application for approval.)

    “Residential construction documents and other data shall be submitted in two or more sets with each application for an approval. Before beginning the construction of any building for which construction documents are required under section 105, the owner or the owner’s representative shall submit construction documents to the residential building official of a certified residential building department for approval.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Felicity or Clermont County directly.

  • Owner-builder exemption — Owner-built residential work inside Felicity village limits.
  • Local zoning — Land inside Felicity village limits.
  • Zoning districts — Land inside Felicity village limits.
  • Minimum dwelling size — Residential dwellings inside Felicity village limits.
  • Minimum lot size — Residential lots inside Felicity village limits.
18 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Felicity publishes no rule on the point, not that none exists. Clermont County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of Felicity means bringing your own water and power. The kit we’d start with: