The Town of Olive, in Ulster County, New York, requires a building permit for work that must meet the state Uniform Code, including new homes1. The town adopted its own zoning law in 19752. Septic plans are reviewed and approved by the Ulster County Department of Health, not the town3.
At a glance
- Building permit
- Required from the Town of Olive for work under the state Uniform Code; sheds of 144 square feet or less are exempt from the building permit but still need a zoning permit1
- Zoning
- Town of Olive has its own zoning law (Chapter 155)2
- Septic
- Ulster County Department of Health reviews and approves plans3
- Inspections
- Required; work must stay exposed until inspected4
- Subdivision
- Must conform to the town Official Map and zoning law5
Who to call
Building permits
Town of Olive Building and Zoning Department
Building permits, inspections, zoning permits and the zoning map for land inside the Town of Olive
PO Box 180 West Shokan, NY 12494
Septic permits
Ulster County Department of Health, Environmental Health Division
Septic (OWTS) plan review, permits and construction inspection
239 Golden Hill Lane, Kingston, NY 12401
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Town of Olive means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Town of Olive, NY?
Yes. The Town of Olive requires a building permit for any work that must conform to the New York State Uniform Code or Energy Code, including new residential construction1. The permit must be in hand before work begins6.
The main exemption is a small detached shed or playhouse of 144 square feet or less, and even that still needs a zoning permit1. The application is a written form signed by the property owner or an authorized agent6. Fees are due when you submit the application, and the Town Board sets the amounts, so ask the Building and Zoning Department for the current schedule7.
Who issues building permits in the Town of Olive, and how do you reach them?
The Town of Olive Building and Zoning Department issues building permits inside the town1. Call (845) 657-8118 and ask for the Building and Zoning Department, or write to PO Box 180, West Shokan, NY 124948. The office keeps hours Monday through Friday, 8 AM to 3 PM, and appointments are strongly suggested8.
The town's code enforcement officer inspects permitted work, which must stay exposed until inspected and accepted4. A certificate of occupancy or compliance is required before a permitted building is used9.
Does the Town of Olive have zoning, and what does it mean for RVs and tiny homes?
Yes. The Town of Olive has its own zoning law, Chapter 155 of the town code, adopted by the Town Board in 19752. Ulster County does not zone for the town, because New York gives zoning power to cities, towns and villages, not counties10.
We could not confirm the town's rules on long-term RV occupancy, temporary camping or accessory dwellings, so ask the Building and Zoning Department before you buy or park anything on the land8. A tiny house built to the Residential Code of New York State and its Appendix BB is a recognized category under state code, but town zoning and septic rules still apply11. Any subdivision must conform to the town Official Map and the zoning law5.
How do septic permits work in the Town of Olive?
Septic permits for every address in the Town of Olive come from the Ulster County Department of Health, not the town3. A design for the onsite wastewater system and at least two copies of the drawings go to the county, and a permit is issued once the drawings are approved12. Most townships want approved septic plans before they will issue a building permit, so start with the county13.
The county reports that review can take up to 6 months on smaller residential properties13. Ulster County's soil survey rates 0% of its soils as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system14. County field representatives verify the design during construction15. Contact the Environmental Health Division at (845) 340-301013.
Building a home in the Town of Olive: the steps, in order
- Ask the Building and Zoning Department about zoning district, setbacks and any use limits for your parcel8.
- Hire a licensed design professional and submit septic plans to the Ulster County Department of Health12.
- Apply for the building permit on the town's form, with fees paid at submission67.
- If a new driveway meets a state highway, get a NYSDOT permit16.
- Keep work exposed for inspection4.
- Obtain the certificate of occupancy or compliance before moving in9.
What stays with Ulster County, and what to check before you buy in the Town of Olive
Septic and well questions sit with the county health department and the state, not the town3. We could not confirm a town rule on private wells, so ask the county health department. For land outside the town, see the Ulster County page.
County-level figures: Ulster County's effective property tax rate is 1.9%17, and its median property tax bill is $6,124 a year18. About 88.7% of the county's land is wooded19. Also ask whether any part of the parcel lies in a mapped flood hazard area; development there needs a local floodplain permit20.
Watch-outs
- Town of Olive building-permit fee amounts are set by the Town Board and were not published in the code text we reviewed, so ask the Building and Zoning Department for the current schedule7.
- We could not confirm town rules on RV occupancy, camping, accessory dwellings or driveway permits; call the Building and Zoning Department at (845) 657-8118 before relying on any of them8.
- A septic design can take up to 6 months to be approved on smaller residential properties, so start it before you commit to a build date13.
Sources
- Town of Olive Code, Chapter 93: Fire Prevention and Building Code Administration and Enforcement (Town of Olive), quoted and re-checked
- Town of Olive Code, Chapter 155: Zoning (Town of Olive), quoted and re-checked
- Ulster County Department of Health: Water & Wastewater Regulation (Town of Olive), quoted and re-checked
- Town of Olive Code, Chapter 93: Fire Prevention and Building Code Administration and Enforcement (Town of Olive), quoted and re-checked
- Town of Olive Code, Chapter 133: Subdivision of Land (Town of Olive), quoted and re-checked
- Town of Olive Code, Chapter 93: Fire Prevention and Building Code Administration and Enforcement (Town of Olive), quoted and re-checked
- Town of Olive Code, Chapter 93: Fire Prevention and Building Code Administration and Enforcement (Town of Olive), quoted and re-checked
- Town of Olive Building and Zoning Department (townofolive.org)
- Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
- documents.dps.ny.gov (New York statewide rule), quoted and re-checked
- Notice of Adoption, quoted and re-checked
- Sewage Disposal System Application — Ulster County, quoted and re-checked
- Ulster County Department of Health, Environmental Health Division (ulstercountyny.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Sewage Disposal System Application — Ulster County, quoted and re-checked
- Residential Driveway Permits (New York statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
- Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.