The Village of East Aurora, in Erie County, New York, requires a village building permit for work that must meet the state Uniform Code, including new homes1. The village adopted its own zoning chapter2. Septic permits are not a village matter: the Erie County Department of Health issues them3.
At a glance
- Building permit
- Required from the Village for work covered by the state Uniform Code, with exemptions in the village code1
- Zoning
- Village-adopted zoning with residential, commercial and manufacturing districts24
- Septic
- Erie County Department of Health construction permit; the application fee is $30053
- RV living
- Needs a village permit before dwelling occupancy beyond 48 hours6
- Owner-builder
- The state lets an owner-occupant act as general contractor with an owner-builder form; the village's own exemption was not confirmed7
- Subdivision
- Reviewed and approved by the Village Board of Trustees8
Who to call
Building permits
Village of East Aurora Building Department (Code Enforcement)
Village building permits and code enforcement; the Village Hall address above is where the village lists its offices
585 Oakwood Avenue, East Aurora, NY 14052
Septic permits
Erie County Department of Health — Division of Environmental Health
Septic (onsite wastewater) construction permits countywide in Erie County, including inside the village
ECDOH Building, 503 Kensington Avenue, Buffalo, NY 14214
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of East Aurora means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Village of East Aurora?
Yes. The Village of East Aurora requires a building permit for any work that must conform to the New York State Uniform Code or Energy Code, including construction, enlargement, alteration, removal or relocation of a building, and the installation of a solid-fuel heating appliance, chimney or flue1. Work may not start until the village permit is issued, and the village code lists exemptions that the Code Enforcement Officer can confirm for a small job1.
The village enforces the state Uniform Fire Prevention and Building Code and the Energy Code inside village limits9. Applications are in writing, on a form acceptable to the Code Enforcement Officer, signed by the owner or an authorized agent10. The permit fee is due when you submit the application11. The county does not issue these permits; in Erie County the towns, villages and cities administer the building code12.
Who issues building permits in East Aurora, and how do you reach them?
The Village of East Aurora's own Code Enforcement Officer administers the building permit process10. The village directory lists a Building Department under Village Hall, which is at 585 Oakwood Avenue13; call the number on this page before you go. The village's site also links to the neighboring Town of Aurora's code enforcement page, so ask the Building Department whether an address on the village edge is handled by the village or the town.
Once work starts, the permit holder must leave work accessible and exposed until the Code Enforcement Officer, or an inspector the officer authorizes, inspects and accepts it, and must notify the officer when listed work is ready14.
Does East Aurora have zoning, and what does it mean for RVs and tiny homes?
Yes. The Village of East Aurora adopted its own zoning chapter through the Board of Trustees2, and the chapter sets residential, commercial and manufacturing districts, along with overlay and special-purpose districts4. Erie County does not set zoning for the village; zoning across the county is administered by its towns, villages and cities15.
For RVs, the village requires a permit before anyone occupies a recreational vehicle for dwelling purposes longer than 48 hours anywhere in the village6. We could not confirm village rules on tiny homes, manufactured homes, accessory dwellings, minimum house size, lot size or setbacks; those vary by district, so ask the Village Code Enforcement Officer which district an address sits in before you plan. Subdividing a lot goes through the Village Board of Trustees8.
How do septic permits work inside East Aurora?
Septic permits for East Aurora addresses come from the Erie County Department of Health, not the village. The county reviews plans for new, repair and replacement onsite wastewater systems and issues the construction permit, with a $300 application fee3. A licensed design professional prepares the engineer's report and plans, and later completes inspections during construction1617. Contact the Environmental Health division at the number listed for the Erie County Department of Health18.
We could not confirm whether the village requires a home to connect to a village sewer main or restricts a private septic system, so ask the Village Code Enforcement Officer and the Department of Health which applies to a specific lot. Erie County also requires a property transfer certification from the Department of Health before title transfers on property with a septic system19. County figures for soils cover the whole county: only a very small share of Erie County soils rate as not limited for a conventional drain field, so expect a site evaluation20.
Building a home in East Aurora: the steps, in order
- Ask the Village Code Enforcement Officer which zoning district the lot is in and what the zoning chapter allows there4.
- Confirm the sewer or septic path with the Village and the Erie County Department of Health before you design the house5.
- For septic, hire a licensed design professional and apply to the Department of Health for a construction permit3.
- Apply in writing for the village building permit and pay the fee at submission1011.
- If you will act as your own general contractor, the state's owner-builder rule applies to an owner-occupied home7.
- Keep work exposed and call the Code Enforcement Officer for each inspection14.
- Ask the village about the certificate of occupancy before you move in; we could not confirm its village requirements.
What stays with Erie County, and what to check before you buy in East Aurora
Septic, onsite wastewater and property-transfer septic inspections stay with the Erie County Department of Health5. For land outside the village, see the Erie County page because village rules do not apply there.
Before you buy, confirm with the village: whether a floodplain development permit applies to the lot, driveway and curb cut rules, well rules, and any short-term rental rule, none of which we could confirm. If the lot fronts a New York State highway, a driveway needs a state Department of Transportation permit21. Property taxes are high: Erie County's effective rate is 2.1%22.
Watch-outs
- We could not confirm village dimensional rules (lot size, setbacks, height, minimum house size), so ask the Village Code Enforcement Officer which district and limits apply before you buy4.
- The village requires a permit for dwelling in an RV beyond 48 hours, so a camper is not a way around the building permit process6.
- We could not confirm village rules on septic systems inside village limits, owner-builder exemptions, or the certificate of occupancy; the Erie County Department of Health is the confirmed septic authority5.
Sources
- Chapter 108: Building Construction and Fire Prevention - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Chapter 285: Zoning - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Chapter 285: Zoning - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Chapter 252: Vehicles, Recreational - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Workers’ Compensation Requirements for Government Issued Permits, Licenses and Contracts (2026 county census)
- Chapter 227: Subdivision of Land - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Chapter 108: Building Construction and Fire Prevention - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Chapter 108: Building Construction and Fire Prevention - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Chapter 108: Building Construction and Fire Prevention - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- NYS Department of State - Building Standards and Codes (2026 county census)
- Village of East Aurora Building Department (Code Enforcement) (east-aurora.ny.us)
- Chapter 108: Building Construction and Fire Prevention - Village of East Aurora, NY (Village of East Aurora), quoted and re-checked
- Municipal Planning Grant Program, quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Erie County Department of Health — Division of Environmental Health (www3.erie.gov)
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Residential Driveway Permits (New York statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.