Bolthole Index

Cape May County, New Jersey

Zoning, building permits and septic rules in Woodbine, New Jersey

The Borough of Woodbine, Cape May County, New Jersey sets its own zoning under Chapter 26 of its code1. Building construction is regulated under New Jersey's Uniform Construction Code, which the borough has transferred to the state Department of Community Affairs to administer2. Septic systems in Cape May County go through the county's Environmental Services Department3.

At a glance

Zoning
Borough zoning under Chapter 26, with named districts14
Building permit
Required under the state Uniform Construction Code; borough has transferred enforcement to the state52
Septic
Cape May County Environmental Services reviews septic design and inspections3
R1 minimum lot
100 feet wide and one acre, if water quality standards are met6
R1 height limit
35 feet for most buildings7
Mobile home while building
Temporary use only, 12 months with a zoning permit8
Public water
Required connection on streets served by the public water system9
Owner-builder
Own-use exception to builder registration; permits and inspections still apply10

Who to call

Septic permits

Cape May County Health Department, Environmental Services Division

Septic system (subsurface sewage disposal) design review and inspections for Cape May County

609-465-1209

6 Moore Road, Cape May Court House, NJ 08210

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Borough of Woodbine means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Woodbine, NJ have zoning, and what does it mean for lot size and setbacks?

Yes. The Borough of Woodbine adopts and enforces its own zoning in Chapter 26 of the borough code1. Cape May County does not zone land, so the borough ordinance is the rulebook for any lot inside Woodbine11.

Chapter 26 sets districts including Forest Agriculture Residential (FAR), Agriculture Rural Residential (ARR), Residential Moderate Density (R1) and Residential High Density (R2), plus airport, institutional, commercial, redevelopment and industrial districts4.

In the R1 district, a single-family dwelling needs a lot at least 100 feet wide at the street line and one acre in area, provided the borough's water quality standards in subsection 26-43.7 are met6. R1 buildings may not exceed 35 feet, with churches and hospitals allowed 60 feet7. Principal buildings in R1 need two side yards totaling 30 feet, with no single side yard under 10 feet12.

Lot sizes in the other districts, front and rear yards, lot coverage and minimum dwelling size are not confirmed here; ask the Woodbine zoning officer for the district your parcel sits in.

Do you need a building permit in Woodbine, and who issues it?

Yes, a construction permit is required before building, enlarging, altering or demolishing a structure anywhere in New Jersey, with exceptions for ordinary maintenance and some temporary structures5. Minor work still needs a permit, though it can start after notice to the enforcing agency5.

In Woodbine, the borough's code relinquishes local administration and enforcement of the Uniform Construction Code and transfers it to the New Jersey Department of Community Affairs2. That transfer takes effect after a waiting period set in the borough code, so confirm with the Woodbine borough clerk which office currently takes your building permit application.

No permit can issue until every required state, county and local approval is in place, including zoning approval and the health certification for water and sewage13. Permit fees are set by municipal ordinance; the state requires plan-review fees to run from five percent to 25 percent of the construction permit fee14.

How do septic permits work in Woodbine?

New Jersey requires the board of health with jurisdiction to certify a home's water supply and sewerage facilities before any building permit issues or construction begins15. A septic tank or tile field also must be inspected by the board of health's representative before it is covered16.

In Cape May County, the Environmental Services Department works with New Jersey licensed professional engineers on the design and inspection of septic systems, including alternative designs required in some areas317. The department also checks plans against the Pinelands Commission, NJDEP and County Planning Board requirements18.

Soils matter here: only about 0.2% of Cape May County soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system19. Woodbine's R1 lot rule also depends on meeting its water quality standards6. We could not confirm a Woodbine-specific septic office; call the county Environmental Services Division to confirm it covers your lot.

Can you live in a mobile home or RV on your land in Woodbine?

Only for a short period while building. Woodbine allows a mobile home as a temporary use for 12 months, extendable by up to 12 more months by the planning or zoning board when construction delays are outside the applicant's control8. The zoning officer issues a zoning permit for each temporary use, the mobile home must be removed within one month of the certificate of occupancy for the new home, and it cannot sit on a permanent foundation8.

Chapter 26 otherwise states that no other mobile home, office or storage trailer is permitted8. We could not confirm Woodbine's rules for long-term RV living, temporary camping, tiny homes or accessory dwellings; ask the Woodbine zoning officer before buying.

Building a home in Woodbine: the steps, in order

  1. Ask the Woodbine zoning officer which district your parcel is in and what lot size, yard and height limits apply4.
  2. Contact Cape May County Environmental Services about a septic site evaluation and design by a licensed engineer317.
  3. If the street has a public water main, plan to connect; private supply is limited to irrigation and similar non-drinking uses9.
  4. For a subdivision, the Cape May County Planning Board reviews it before local approval20.
  5. Apply for construction permits and gather zoning and health approvals, since no permit issues until all approvals are in place13.
  6. Build with the required stop-work inspections at footings, rough plumbing and electrical, and framing21.
  7. If you built the home yourself, file the owner-built affidavit with the construction official before a certificate of occupancy can issue22.

What to check before you buy land in Woodbine

Check the zoning district and whether the lot meets that district's minimum size; Woodbine is the one Cape May County municipality that does not permit small lots under one acre in its zoning23. Ask whether a public water main serves the street, because a certificate of occupancy for new construction is withheld until the building is connected24.

Flood rules also apply: Woodbine has a flood damage prevention chapter, but its terms are not confirmed here, so ask the borough about the flood zone.

Cape May County's effective property tax rate is 1.3%25, and typical home values run about $804,63726. For land outside the borough, see the Cape May County page, where township and borough rules differ.

Watch-outs

  • Woodbine's borough code transfers Uniform Construction Code enforcement to the state, but only after a waiting period, so confirm who takes building permit applications before you apply2.
  • The R1 one-acre lot rule applies only if the borough's water quality standards are met6.
  • An owner-builder exception covers new-home builder registration only; it does not waive permits or inspections10.
  • Septic, RV, tiny home and accessory dwelling rules for Woodbine are unconfirmed; ask the Woodbine zoning officer and Cape May County Environmental Services17.

Sources

  1. Chapter 26: Zoning - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  2. Chapter 10: Building and Housing - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  3. Septic Systems, quoted and re-checked
  4. Chapter 26: Zoning - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  5. N.J.A.C. 5:23-2.14, Construction permits—when required (New Jersey statewide rule), quoted and re-checked
  6. Chapter 26: Zoning - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  7. Chapter 26: Zoning - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  8. Chapter 26: Zoning - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  9. Chapter 15: Water - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  10. Construction Code FAQs for New Home Buyers, quoted and re-checked
  11. P.L. 2013, c.106 — Municipal Land Use Law amendments (New Jersey statewide rule), quoted and re-checked
  12. Chapter 26: Zoning - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  13. New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
  14. New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
  15. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  16. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  17. Cape May County Health Department, Environmental Services Division (capemaycountynj.gov)
  18. Septic Systems, quoted and re-checked
  19. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  20. Cape May County Subdivision and Site Plan Resolution, quoted and re-checked
  21. New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
  22. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  23. Cape May County Farmland Preservation Plan, quoted and re-checked
  24. Chapter 15: Water - Borough of Woodbine, NJ - eCode360 (Borough of Woodbine), quoted and re-checked
  25. Effective property tax rate: Bolthole Index county data
  26. Typical home value (Zillow): Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Woodbine

Borough of Woodbine’s own rules

  • Certificate of occupancyLimited

    New construction with a human water supply system on a street served by the public water supply main inside Woodbine borough

    • The water-connection condition applies only to new construction on streets served by a public water main; the general certificate-of-occupancy process was not located.
    “no occupancy permit shall be issued on any street served by such a public water main for any new construction within the borough limits, having a human water supply system, until such time as the new construction has been connected to the public water supply main.”
  • Local zoningPresent

    Land inside Woodbine borough limits, under the borough's own Chapter 26 (Zoning) ordinance

    • Chapter 26 was added by Ord. No. 606-2022 per the section headings; the zoning districts and bulk rules are set per district in Chapter 26.
    “§ 26-4.5 residential moderate density (r1). [added 6-16-2022 by ord. no. 606-2022] the purpose of the residential moderate density (r1) zoning district is to allow residents the amenities of open space”
  • Zoning districtsPublished

    Zoning districts for land inside Woodbine borough limits

    • Districts listed in the Chapter 26 table of contents: FAR, ARR, R1, R2, Airport Airside (AA), Airport Business (AB), Institutional (INST), Town Commercial (TC), Redevelopment (RD), Light Industrial Manufacturing (LIM), DeHirsch Light Industrial Manufacturing (DLIM), and an Affordable Housing Overlay.
    “§ 26-4.3 forest agriculture residential (far). § 26-4.4 agriculture rural residential (arr). § 26-4.5 residential moderate density (r1). § 26-4.6 residential high density (r2). § 26-4.7 airport airside (aa).”
  • Minimum lot sizeSpecified

    Single-family dwellings in the Residential Moderate Density (R1) district inside Woodbine borough

    • The lot area and width figures apply only if the water quality standards of subsection 26-43.7 are met; § 26-43.7 was not opened in this record.
    • The R1 lot figure is the district rule quoted from § 26-4.5(d); a search snippet also described an 11,250 sq ft lot with public sewer under another provision, which was not verified and is not recorded here.

    minimum lot width at street line: >= 100 feet (provided water quality standards of § 26-43.7 are met) · minimum lot area: >= 1 acre (provided water quality standards of § 26-43.7 are met)

    “1. single-family dwellings, rectories and parish houses in an r1 district shall have a minimum lot width of 100 feet at the street line and a minimum lot area of one acre provided that the standards of subsection 26-43.7 (water quality) are met.”
  • SetbacksSpecified

    Principal buildings in the Residential Moderate Density (R1) district inside Woodbine borough (side yards)

    • Two-family dwellings: the yard requirements above are increased by 50%, per the same subsection.
    • Front and rear yard depths were not quoted from the official text in this record and are not stated here.

    combined side yards: >= 30 feet · minimum any one side yard: >= 10 feet (includes side yards of corner lots)

    “every principal building shall be provided with two side yards totaling 30 feet in width, the minimum width of any side yard being not less than 10 feet including the side yards of corner lots.”
  • Building heightSpecified

    Buildings and structures in the Residential Moderate Density (R1) district inside Woodbine borough

    • Churches and hospitals may go to 60 feet.
    • Subject to exceptions and modifications in § 26-75, which was not opened in this record.

    maximum building height: <= 35 feet (churches and hospitals may not exceed 60 feet)

    “1. no building or structure shall exceed 35 feet in height except that churches and hospitals shall not exceed 60 feet except further as provided in section 26-75 (exceptions and modifications).”
  • Manufactured homesLimited

    Mobile homes on private land inside Woodbine borough: only the temporary-use cases in Chapter 26; permanent mobile-home occupancy is not established here

    • Temporary use is for 12 months, extendable by not more than an additional 12 months (two years total) by the planning/zoning board where actual construction has been delayed by factors outside the applicant's control.
    • A zoning permit for each temporary use is issued by the zoning officer.
    • The mobile home must cease occupancy and be removed within one month of the certificate of occupancy for the new residential structure.
    • The mobile home may not be placed on a permanent foundation or attached so that its removal becomes impossible or unnecessarily difficult.

    temporary use period: 12 months (extendable by not more than an additional 12 months)

    “e. no other mobile home, office or storage trailer shall be permitted.”
  • Mandatory utility hookupWater (with conditions)

    New buildings inside Woodbine borough located on streets served by the public water supply system

    • Connection is required only where the street is served by the public water supply system.
    • Private water supply systems are allowed for irrigation, lawns, flowers, gardens and other uses not connected with human consumption or human hygiene (§ 15-2.2).
    • No occupancy permit is issued for new construction with a human water supply system until connected (§ 15-2.3).
    • Sewer connection requirements are in Chapter 16 (Sewers, § 16-1 to § 16-1.3), which was listed but not opened in this record; no sewer connection rule is recorded here.
    “all buildings located on streets served by the public water supply system, shall be connected with the public water supply main in the borough.”

Rules another office applies inside Borough of Woodbine

Borough of Woodbine does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted

    Building construction inside Woodbine borough: the borough has transferred administration and enforcement of the Uniform Construction Code to the State of New Jersey Department of Community Affairs

    • Per § 10-1, the transfer does not take effect until 120 calendar days after a certified copy is forwarded to the Department of Community Affairs, or until DCA exercises its jurisdiction, whichever is sooner.
    • The quoted text is the borough's own section § 10-1 (State Uniform Construction Code), citing N.J.S.A. 52:27D-119 et seq. and N.J.A.C. 5:23-4.3.
    “the borough of woodbine pursuant to n.j.s.a. 52-27d 110, et seq., and n.j.a.c. 5:23-4.3 hereby relinquishes its jurisdiction for the administration and enforcement of the uniform construction code and hereby transfers jurisdiction for the administration and enforcement of the uniform construction code to the department of community affairs of the state of new jersey.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Woodbine or Cape May County directly.

  • Building permit — Building permits for new construction inside Woodbine borough
  • Owner-builder exemption — Owner-builder exemption for residential construction inside Woodbine borough
  • Inspections — Building inspections inside Woodbine borough
  • Minimum dwelling size — Minimum dwelling size inside Woodbine borough
  • Lot coverage — Lot coverage in the Residential Moderate Density (R1) district inside Woodbine borough
16 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Woodbine publishes no rule on the point, not that none exists. Cape May County’s page lists the county offices to call.

← All of Cape May County: county rules, score and offices