The Borough of West Cape May, New Jersey adopts its own zoning, and a zoning permit is required before any building is erected or altered1. A building permit under the state Uniform Construction Code is also required2. Septic permits for unsewered lots come from the Cape May County Health Department, not the borough3.

At a glance

Zoning
Borough zoning: districts R-1 to R-5, C-1 to C-3 and P1
Zoning permit
Required before erecting or altering any building1
Building permit
Required under the state Uniform Construction Code2
Minimum lot, R-1
5,000 sq. ft. for a single-family home4
Minimum lot, unsewered
35,000 sq. ft. in every district5
Septic
Cape May County Health Department; private disposal not allowed where sewers are provided36
Owner-builder
Allowed to build for own use, but permits and inspections still apply7
Wells
New Jersey DEP well-drilling permit required8

Who to call

Zoning

Borough of West Cape May, Borough Offices

Borough hall: the starting point for zoning permits, building permits and certificates of occupancy inside West Cape May

(609) 884-1005

732 Broadway, West Cape May, NJ 08204

Septic permits

Cape May County Health Department, Environmental Services Division

Septic system (subsurface sewage disposal) design review, permits and inspections for Cape May County

609-465-1209

6 Moore Road, Cape May Court House, NJ 08210

Contact details are copied from each office’s official page and were checked against it on October 23, 2026.

Off-grid gear

Going off-grid in Borough of West Cape May means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does West Cape May have zoning, and what does it mean for lot size and setbacks?

Yes. The Borough of West Cape May, in Cape May County, adopts its own zoning under Chapter 27 of the borough code, with districts R-1 through R-5, C-1 through C-3 and P9. Cape May County does not zone parcels; New Jersey gives that power to municipalities10.

In the R-1 urban residential district, a single-family lot needs at least 5,000 sq. ft., with 20 ft front and rear yards, 6 ft side yards, 40% maximum lot coverage and a 35 ft height limit411. In the R-2 rural residential/agricultural district, the single-family minimum is 7,500 sq. ft. with a 150 ft lot depth12. R-3 through R-5 and the commercial districts were not reviewed, so check the zoning map at the borough offices for any specific lot9.

Any lot not served by an off-site sewerage system needs at least 35,000 sq. ft. in every district, unless the lot will be served by sewer under an approved application5. Table values were amended in July 20264, so confirm the current figures with the borough before you buy.

Do you need a building permit in West Cape May, and who issues it?

Yes. Construction, alteration, demolition and changes of use in West Cape May fall under New Jersey's Uniform Construction Code, and a permit is required13. The permit is issued by the municipal construction official, not the county2. Inspections happen at set stages, such as footings, rough plumbing and electrical, and framing, and a certificate of occupancy follows final inspection1415.

West Cape May adds its own steps. A borough zoning permit is required before a building is erected or altered, and it lapses if no building permit issues within six months16. The borough also requires a certificate of occupancy for new or altered buildings, with proof of proper disposal of construction and demolition debris17.

We could not confirm which office reviews and inspects construction permits for the borough. Call the Borough Offices at18 and ask who the construction official is and where to file.

How do septic permits work inside West Cape May?

Septic permits for West Cape May are handled by the Cape May County Health Department, Environmental Services Division, which reviews design and inspections of septic systems with licensed professional engineers319. New Jersey law bars issuing a building permit until the board of health certifies that the sewerage facilities comply20.

Where borough sewers are provided, private septic tanks and cesspools are not permitted at all6. A new home on a sewered street instead needs a borough connection permit; the residential permit and inspection fee is $300 and the new service connection fee is $1,200, with connection costs borne by the owner21.

On an unsewered lot, plan for the 35,000 sq. ft. minimum5. Cape May County's soils make this harder: about 0.2% of the county's soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system22. We could not confirm which borough streets are unsewered; ask the borough's water and sewer office.

Can you live in an RV or tiny home in West Cape May?

We could not confirm a borough rule on living in a recreational vehicle, camping on private land or a tiny home. The borough code has chapters on trailers and campgrounds that we could not review, so call the Borough Offices before parking an RV or placing a tiny home on any lot18.

One rule is clear: in the R-1 district only single-family and duplex dwellings are allowed by right, and all other uses are prohibited, so a manufactured or mobile home cannot be used as a dwelling there23. Statewide, HUD manufactured homes are limited to single-family use24. Other districts were not assessed.

Can you build your own home in West Cape May?

Owner-builders can build a home for their own use, but permits and inspections still apply. New Jersey's exception for owner-builders covers new-home builder registration only; it does not waive construction permits or Uniform Construction Code compliance7. Before a certificate of occupancy issues, the owner files an affidavit with the construction official certifying that the work conforms to law and acknowledging that owner-performed work is not covered by the New Home Warranty and Builders' Registration Act25.

Building a home in West Cape May: the steps, in order

  1. Confirm the lot's zoning district and sewer status with the Borough Offices918.
  2. If the lot is unsewered, start with the Cape May County Health Department, because the board of health must certify sewerage facilities before a building permit can issue2019.
  3. Get a borough zoning permit; it lapses if no building permit issues within six months16.
  4. Apply for the building permit under the Uniform Construction Code13.
  5. If you need a well, get a New Jersey DEP well-drilling permit before drilling8.
  6. Pass the staged inspections and final inspection, then obtain the certificate of occupancy1417.

What stays with Cape May County, and what to check before you buy in West Cape May

Septic design and inspection stay with Cape May County, and the county planning board reviews subdivisions326. Inside the borough, division of land is also governed by the borough's subdivision chapter27. Land outside West Cape May is covered on the Cape May County page.

A driveway or other access onto a State highway needs a state permit28. We could not confirm the borough's flood-damage rules or any short-term rental rule; ask the Borough Offices, especially for a lot near the water.

Costs are county-level: Cape May County's effective property tax rate is 1.3%, with a median bill of $5,233 a year2930. The typical home value is $804,63731.

Watch-outs

  • Borough zoning table values were amended in July 2026, so confirm current lot sizes and setbacks with the Borough Offices before you buy4.
  • Septic is a county matter, not a borough one; the Cape May County Health Department must sign off before a building permit can issue20.
  • Where borough sewers are provided, a septic system is not allowed, and connection fees of $300 and $1,200 apply21.
  • We could not confirm borough rules on RVs, tiny homes, accessory apartments or flood zones; call the Borough Offices before you commit18.

Sources

  1. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  2. NJ DCA - Uniform Construction Code (N.J.A.C. 5:23) (2026 county census)
  3. Septic Systems, quoted and re-checked
  4. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  5. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  6. Chapter 20: Sewers - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  7. Construction Code FAQs for New Home Buyers, quoted and re-checked
  8. Bulletin 88-10: Private On-Site Water Supply Systems (New Jersey statewide rule), quoted and re-checked
  9. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  10. P.L. 2013, c.106 — Municipal Land Use Law amendments (New Jersey statewide rule), quoted and re-checked
  11. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  12. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  13. N.J.A.C. 5:23-2.14, Construction permits—when required (New Jersey statewide rule), quoted and re-checked
  14. New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
  15. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  16. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  17. Borough of West Cape May, NJ Building and Housing (Chapter 10) (Borough of West Cape May), quoted and re-checked
  18. Borough of West Cape May, Borough Offices (westcapemay.us)
  19. Cape May County Health Department, Environmental Services Division (capemaycountynj.gov)
  20. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  21. Chapter 20: Sewers - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  22. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  23. Chapter 27: Zoning - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  24. Manufactured/Modular Buildings Program (New Jersey statewide rule), quoted and re-checked
  25. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  26. Cape May County Subdivision and Site Plan Resolution, quoted and re-checked
  27. Table of Contents - Borough of West Cape May, NJ (Borough of West Cape May), quoted and re-checked
  28. Major Access Permits (New Jersey statewide rule), quoted and re-checked
  29. Effective property tax rate: Bolthole Index county data
  30. Median property tax bill: Bolthole Index county data
  31. Typical home value (Zillow): Bolthole Index county data

Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of West Cape May

Borough of West Cape May’s own rules

  • Certificate of occupancyRequired

    Occupancy of new or altered buildings inside West Cape May borough

    • Certificate of occupancy requires proof of proper disposal of construction and demolition debris (§ 10-4.3).
    • Newly constructed structures subject to the key lock box section must have the box installed before a certificate of occupancy issues (§ 10-11).
    “no certificate of occupancy or other required such approval shall be issued by the construction code official until receipts are furnished to the construction code official”
  • Local zoningPresent (with conditions)

    Land inside West Cape May borough limits; the borough's own Chapter 27 Zoning ordinance ("West Cape May zoning regulations") governs use and bulk.

    • Zoning districts are R-1 through R-5, C-1 through C-3 and P per § 27-7; the zoning map is on file at the borough offices.
    • Zoning permits are required under § 27-32 before erecting, constructing or altering any building.
    “this chapter shall be known and may be cited as the "west cape may zoning regulations."”
  • Zoning districtsPublished (with conditions)

    Zoning districts and map for land inside West Cape May borough

    • Districts are R-1, R-2, R-3, R-4, R-5, C-1, C-2, C-3 and P per § 27-7; R-3 through R-5 and the commercial bulk tables were not opened.
    • The zoning map dated June 6, 2009 is on file at the borough offices (§ 27-8).
    “the borough of west cape may is hereby divided into the following designated zoning districts: a. r-1 urban residential district.”
  • Minimum lot sizeSpecified

    Single-family dwelling lot in the R-1 urban residential district of West Cape May borough

    • Two-family dwelling lot area is 10,000 sq. ft. in the same table.
    • Table amended 7-22-2026 by Ord. No. 665-26 per the code's own bracket note; effective_at not stated, so left null.
    • Unsewered lots are subject to 35,000 sq. ft. under § 27-27.13.

    lot area: >= 5000 sq. ft. (two-family dwelling 10,000 sq. ft.) · lot frontage: >= 50 ft · lot depth: >= 100 ft

    “the minimum area and bulk requirements in the r-1 zoning district shall be as follows: single-family dwelling two-family dwelling lot area 5,000 sq. ft. 10,000 sq. ft. lot frontage 50' 100' lot width 50' 100' front yard setback 20' 20' each side yard setback 6' 6' total side yard setback 16' 16' rear yard setback 20' 20' lot depth 100' 100' maximum lot coverage for principal building and accessories 40% 40% maximum gross floor area 2,250 sq. ft. 1,688 sq. ft. per unit maximum floor area ratio 45% 34% building height 35' 35'”
    2 more reviewed findings on this topic
    • Specified — Single-family dwelling lot in the R-2 rural residential/agricultural district of West Cape May borough
      “the minimum area and bulk requirements in the r-2 zoning district are as follows: single-family dwelling two-family dwelling lot area 7,500 sq. ft. 15,000 sq. ft. lot frontage 50' 100' lot width 50' 100' front yard setback 20' 20' each side yard setback 6' 6' total side yard setback 16' 16' rear yard setback 20' 20' lot depth 150' 150' maximum lot coverage for principal building and accessories 40% 40% maximum gross floor area 3,375 sq. ft. 2,250 sq. ft. per unit 4,500 sq. ft. per structure maximum floor area ratio 45% 30% building height 35' 35'”
    • Specified — Any lot in any zoning district of West Cape May borough not served by an off-site sewerage system
      “in all zoning districts, the minimum lot area for any lot not serviced by an off-site sewerage system shall be 35,000 square feet.”
  • SetbacksSpecified

    Principal single-family building in the R-1 urban residential district of West Cape May borough

    • Accessory-use setbacks are in § 27-10.4 and are not summarized here.
    • Two-family setbacks are the same as single-family in the table.

    front yard setback: >= 20 ft · each side yard setback: >= 6 ft · total side yard setback: >= 16 ft · rear yard setback: >= 20 ft

    “the minimum area and bulk requirements in the r-1 zoning district shall be as follows: single-family dwelling two-family dwelling lot area 5,000 sq. ft. 10,000 sq. ft. lot frontage 50' 100' lot width 50' 100' front yard setback 20' 20' each side yard setback 6' 6' total side yard setback 16' 16' rear yard setback 20' 20' lot depth 100' 100' maximum lot coverage for principal building and accessories 40% 40% maximum gross floor area 2,250 sq. ft. 1,688 sq. ft. per unit maximum floor area ratio 45% 34% building height 35' 35'”
    One more reviewed finding on this topic
    • Specified — Principal single-family building in the R-2 rural residential/agricultural district of West Cape May borough
      “the minimum area and bulk requirements in the r-2 zoning district are as follows: single-family dwelling two-family dwelling lot area 7,500 sq. ft. 15,000 sq. ft. lot frontage 50' 100' lot width 50' 100' front yard setback 20' 20' each side yard setback 6' 6' total side yard setback 16' 16' rear yard setback 20' 20' lot depth 150' 150' maximum lot coverage for principal building and accessories 40% 40% maximum gross floor area 3,375 sq. ft. 2,250 sq. ft. per unit 4,500 sq. ft. per structure maximum floor area ratio 45% 30% building height 35' 35'”
  • Lot coverageSpecified

    Principal building and accessories on a lot in the R-1 urban residential district of West Cape May borough

    • Non-conforming undersized lots may get a coverage increase under § 27-27.14 (not summarized).

    maximum lot coverage (principal building and accessories): <= 40 %

    “maximum lot coverage for principal building and accessories 40% 40%”
    One more reviewed finding on this topic
    • Specified — Principal building and accessories on a lot in the R-2 rural residential/agricultural district of West Cape May borough
      “maximum lot coverage for principal building and accessories 40% 40%”
  • Building heightSpecified

    Principal building in the R-1 urban residential district of West Cape May borough

    • Height is listed as a building height in the R-1 table; the measurement method in § 27-6 definitions was not opened.

    maximum building height: <= 35 ft

    “maximum floor area ratio 45% 34% building height 35' 35'”
    One more reviewed finding on this topic
  • Manufactured homesProhibited

    Manufactured or mobile home used as a dwelling in the R-1 urban residential district of West Cape May borough

    • R-1 permits by right only single-family and duplex dwellings (§ 27-10.1); other uses are prohibited by § 27-4.
    • Mobile home park sites are addressed separately in § 27-27.10 and Chapter 14; those rules were not fully opened, so other districts were not assessed.
    “all uses not specifically permitted under the provisions of this chapter are prohibited.”
  • Off-grid sanitationLimited

    Private privy, septic tank or cesspool disposal inside West Cape May borough

    • Construction or maintenance of privies, septic tanks or cesspools is unlawful except as provided in § 20-7.16; the exceptions were not opened.
    • Where sewers are provided, private disposal is not permitted at all (§ 20-7.18).
    “no private wastewater disposal system shall be permitted in the geographic areas of the borough which have wastewater sewers provided.”
  • Mandatory utility hookupSewer (with conditions)

    New homes on land inside West Cape May borough where borough wastewater sewers are provided

    • Connection is only through borough-owned wastewater sewers (§ 20-7.17); direct discharge to the Cape May County MUA facilities needs written consent.
    • Connection permit required before any connection to a wastewater or storm sewer (§ 20-7.19); Class I residential permit and inspection fee is $300.
    • New service connection fee is $1,200 and reconnection fee is $250 (§ 20-2.1).
    • Connection costs are borne by the owner (§ 20-7.20).
    • No deadline for connection after sewer availability was located in the opened passages.
    • Water connection (Chapter 19) was not opened.

    new service connection fee: 1200 USD (reconnection fee is $250)

    “no private wastewater disposal system shall be permitted in the geographic areas of the borough which have wastewater sewers provided.”
  • Subdividing landRegulated (with conditions)

    Division of land inside West Cape May borough

    • Subdivision is governed by Chapter 25 Subdivision (§ 25-1 to § 25-31); its approval standards were not opened.
    • Site plan rules are in Chapter 24 (§ 24-1 to § 24-8).
    “chapter 25 subdivision (§ 25-1 &ndash; § 25-31)”
  • Permit processPartial

    Zoning permit process inside West Cape May borough

    • Zoning permits lapse if no building permit issues within six months of the zoning permit (§ 27-32).
    • Zoning permit requires taxes and water/sewer charges to be current (§ 27-32).
    • Building permit application procedure in Chapter 10 and the interlocal arrangement with the city of Cape May were not fully opened.
    “zoning permits shall be granted or refused within 10 days of the submission of a complete application to the zoning officer.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of West Cape May or Cape May County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside West Cape May borough
  • Building code adopted — Building code adoption inside West Cape May borough
  • Minimum dwelling size — Minimum dwelling size in R-1 and R-2 districts of West Cape May borough
  • Living in an RV — Occupancy of recreational vehicles inside West Cape May borough
  • Camping on your land — Temporary camping on private land inside West Cape May borough
10 more unanswered
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of West Cape May publishes no rule on the point, not that none exists. Cape May County’s page lists the county offices to call.

← All of Cape May County: county rules, score and offices