Bolthole Index

Camden County, New Jersey

Zoning, building permits and septic rules in Borough of Collingswood, New Jersey

Borough of Collingswood is a borough in Camden County, New Jersey. Borough of Collingswood adopts its own zoning, so inside its limits Borough of Collingswood’s rules apply, not the county’s. 4 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Camden County page.

Answers from the rulebook for Borough of Collingswood

Borough of Collingswood’s own rules

  • Building code adoptedAdopted

    Construction inside Collingswood borough limits, enforced through the Borough's local State Uniform Construction Code enforcing agency.

    • Chapter 135 says the enforcing agency consists of a construction official, building, plumbing, fire and electrical subcode officials, and any other subcode officials the state Construction Commission adopts.
    • Each subcode position must be filled by a person qualified under N.J.S.A. 52:27D-119 et seq., or an on-site inspection agency may be retained by contract.
    • Appeals go to the Camden County Board of Appeals (§ 135-2).
    • The adoption date is the date the Chapter 135 ordinance was adopted; later amendments were not checked.
    “there is hereby established in the borough of collingswood a state uniform construction code enforcing agency, to be known as the "collingswood construction code office,"”
  • Local zoningPresent

    Land inside Collingswood borough limits. The Borough adopts and administers its own zoning under Chapter 141, Development Regulations (the 'Collingswood Development Regulations Ordinance').

    • Zoning district boundaries are shown on the 'Borough of Collingswood Zoning Map, November 1999', which the code says is on file in the borough offices.
    • Uses not expressly permitted as a principal, accessory or conditional use are prohibited (§ 141-15.1).
    • Bulk and area limits are in a 'schedule of district regulations' at the end of Chapter 141, which was not opened for this record.
    “a. regulate the use of land within zoning districts.”
  • Zoning districtsPublished

    Zoning districts inside Collingswood borough limits under Chapter 141 Article VI.

    • Article VI lists the districts: single-family detached SF-D1 (§ 141-16), SF-D2 (§ 141-17), SF-D3 (§ 141-18), single-family attached SF-A (§ 141-19), multifamily MF (§ 141-20), CBD, POD, HBD, HID and an affordable housing overlay.
    • No agricultural or rural-residential district was found in the list.
    • District boundaries follow the zoning map on file in the borough offices.
    • Dimensional standards are in the schedule of district regulations at the end of Chapter 141, not opened.
    “§ 141-16 single-family, detached residential district one (sf-d1).”
  • Permit feesPublished

    Construction permit fees for work inside Collingswood borough limits, set by the Borough's construction-code fee schedule.

    • § 135-3 provides for adoption of a fee schedule; the fee table on the Chapter 135 page includes electrical fees such as a $75 minimum for lighting fixtures.
    • The full fee schedule was not opened; building, plumbing, fire and other permit fees are not verified.
    • Fire permit and fire inspection fees are in Chapter 163 and were not part of this claim.

    electrical lighting fixtures minimum fee: 75 USD (from the Chapter 135 fee table; other fees not verified)

    “item fee electrical fees minimum fee lighting fixtures $75 receptacles switches detectors”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Collingswood or Camden County directly.

  • Building permit — Construction permit requirement inside Collingswood borough limits
  • Owner-builder exemption — Owner-builder permit exemption inside Collingswood borough limits
  • Inspections — Construction inspections inside Collingswood borough limits
  • Certificate of occupancy — Certificates of occupancy inside Collingswood borough limits
  • Minimum dwelling size — Minimum dwelling size in SF-D1 and other residential districts inside Collingswood borough limits
20 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Collingswood publishes no rule on the point, not that none exists. Camden County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Collingswood means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Camden County: county rules, score and offices