Building permits in the Borough of Saddle River, Bergen County, New Jersey come from the borough's own Construction Code Agency under the state Uniform Construction Code1. Zoning is set by the borough's Chapter 2102, not by Bergen County3. Septic and well questions go to the borough Board of Health and the Northwest Bergen Regional Health Commission4.

At a glance

Building permit
Required; issued by the borough's Construction Code Agency15
Zoning
Borough zoning, Chapter 210 of the borough code; Bergen County does not zone23
Septic permit
Health approval required before a building permit; Board of Health and Northwest Bergen Regional Health Commission64
Owner-builder
Registration exception for your own home, but permits and inspections still apply7
Certificate of occupancy
Required; an as-built certified survey is part of the process8
RV and tiny-home living
Not confirmed; ask the borough zoning official9

Who to call

Building permits

Saddle River Construction Code Agency (Building and Construction Department)

Building, electrical, plumbing and fire-protection permits and inspections; zoning review of permit applications; the email address listed is for inspection requests

201-327-2609

[email protected]

100 East Allendale Road, Saddle River, NJ 07458

Septic permits

Northwest Bergen Regional Health Commission (serving the Saddle River Board of Health)

Environmental health for Saddle River, including well and septic questions; septic plan review is reached at 201-934-0300

201-445-7217

[email protected]

20 West Prospect Street, Waldwick, NJ 07463

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of Saddle River means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Saddle River have zoning, and what does it mean for RVs, tiny homes and lot size?

Yes. The Borough of Saddle River publishes Chapter 210, Zoning, in its adopted code2. Bergen County has no zoning of its own, because New Jersey leaves zoning to municipalities3.

Under state law, minimum lot size, setbacks, lot coverage and building height are set district by district in the borough's ordinance, so the answer for a particular lot depends on its zoning district1011. We could not confirm the borough's district lot sizes, setbacks, or any rule on RVs, tiny homes or accessory dwellings. Ask the borough's zoning official through the Building and Construction Department before you sign a contract9.

Do you need a building permit in Saddle River, and who issues it?

Yes. Construction in Saddle River goes through the borough's own State Uniform Construction Code enforcing agency, the Saddle River Construction Code Agency1. New Jersey requires a construction permit for new construction and for work on existing buildings, with an exception for ordinary maintenance5.

A complete application must be approved or denied within 20 business days of submission12. The borough's office says a construction permit does not replace zoning, planning board, health or septic approval, so those come first or alongside9. Inside the borough, no one at Bergen County issues the building permit; the borough office does.

How do septic and well permits work inside Saddle River?

New Jersey bars a municipality from issuing a building permit until the board of health having jurisdiction certifies the water supply and sewerage facilities6. In Saddle River the Board of Health works through the Northwest Bergen Regional Health Commission4.

The borough tells owners to contact the health office before installing, altering, repairing or abandoning a well or septic system, and lists a septic review line at 201-934-03004. A septic system also has to be inspected before it is covered13. We could not confirm whether a particular Saddle River lot is on public sewer or needs a septic system; the health office and the borough engineer can tell you.

Building a home in Saddle River: the steps, in order

  1. Ask the zoning official which district the lot is in and what that district allows, before you buy9.
  2. Get health approval for any septic system or well through the Northwest Bergen Regional Health Commission4.
  3. File the state construction permit application with the Construction Code Agency, with sealed plans and any prior approvals9.
  4. Before construction starts, submit a certified location stakeout for the Construction Official's acceptance14.
  5. Have each stage inspected before it is covered15.
  6. Before a certificate of occupancy is issued, submit an as-built certified survey8. A home you built yourself also needs the owner's affidavit filed with the construction official16.

What stays with Bergen County and the state, and what to check before you buy

Bergen County's own role is narrow: it reviews subdivisions that abut a County road or drainage facility17. A driveway onto a County road carries a $250 road-access permit fee18, and a driveway onto a State highway needs a state access permit19. For land outside Saddle River's borders, see the Bergen County page.

Building your own home exempts you from new-home builder registration, not from permits or inspections7. Bergen County's typical home value is about $791,11620 and its effective property tax rate is 1.7%21; both are county-level figures, not Saddle River's own.

Watch-outs

  • We could not confirm the borough's rules on RVs, tiny homes, accessory dwellings, minimum dwelling size or flood-hazard development; ask the Building and Construction Department before relying on any of them9.
  • The Bergen County Department of Health Services is not the septic office for Saddle River addresses; the borough sends septic and well questions to the Northwest Bergen Regional Health Commission4.
  • A construction permit does not replace zoning, planning board or health approval, and the borough does not treat a portal entry as an issued permit9.

Sources

  1. Chapter 96: Construction Codes, Uniform - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
  2. Table of Contents - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
  3. Bergen County Standards for Sustainable Land Development—Site Plans, quoted and re-checked
  4. Northwest Bergen Regional Health Commission (serving the Saddle River Board of Health) (saddleriver.gov)
  5. The New Jersey State Uniform Construction Code, quoted and re-checked
  6. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  7. Builder Registration and New Home Warranty for Builders, quoted and re-checked
  8. Chapter 96: Construction Codes, Uniform - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
  9. Saddle River Construction Code Agency (Building and Construction Department) (saddleriver.gov)
  10. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  11. P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
  12. Uniform Construction Code General Information, quoted and re-checked
  13. New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
  14. Chapter 96: Construction Codes, Uniform - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
  15. New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
  16. N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
  17. Bergen County Standards for Sustainable Land Development—Subdivisions, quoted and re-checked
  18. Fee Schedule for Site Plan Application, quoted and re-checked
  19. Major Access Permits (New Jersey statewide rule), quoted and re-checked
  20. Typical home value (Zillow): Bolthole Index county data
  21. Effective property tax rate: Bolthole Index county data

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Saddle River

Borough of Saddle River’s own rules

  • Building code adoptedAdopted

    Construction inside Saddle River borough is administered through the borough's State Uniform Construction Code enforcing agency.

    • The agency includes the state-required construction and subcode officials; an on-site inspection agency may be retained by contract under N.J.A.C. 5:23.
    “There is hereby established in the Borough of Saddle River a State Uniform Construction Code enforcing agency to be known as the "Saddle River Construction Code Agency," consisting of a Construction Official, Building Subcode Official, Plumbing Subcode Official, Electrical Subcode Official, Fire Protection Subcode Official and such other subcode officials for such additional subcodes as the Commissioner of the Department of Community Affairs, State of New Jersey, shall hereafter adopt as part of the State Uniform Construction Code.”
  • InspectionsRequired

    Permitted structures constructed inside Saddle River borough.

    • Before construction begins, the certified location stakeout must be reviewed and accepted.
    • If construction is within 70 feet of a contiguous property line, property lines must also be staked.
    “Prior to the actual construction of the structure which has been the subject of the permit issued pursuant to § 96-4, a certified location stakeout must be submitted to the Construction Official/Building Inspector for his review and acceptance. Actual construction of the structure may not commence until acceptance of the certified stakeout by the Construction Official/Building Inspector.”
  • Certificate of occupancyRequired

    Completed structures inside Saddle River borough.

    • An as-built certified survey must be submitted to the Construction Official/Building Inspector for review and acceptance before issuance.
    “Prior to the issuance of a certificate of occupancy for the completed structure, it will be necessary that an as-built certified survey be submitted to the Construction Official/Building Inspector for his review and acceptance.”
  • Local zoningPresent

    Land inside Saddle River borough; the borough publishes Chapter 210, Zoning, in its adopted code.

    “Chapter 210 Zoning (§ 210-1 – § 210-125)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Saddle River or Bergen County directly.

  • Owner-builder exemption — Owner-builder construction inside Saddle River borough.
  • Zoning districts — Zoning districts inside Saddle River borough.
  • Minimum dwelling size — Residential districts inside Saddle River borough.
  • Minimum lot size — Residential districts inside Saddle River borough.
  • Setbacks — Residential districts inside Saddle River borough.
17 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Saddle River publishes no rule on the point, not that none exists. Bergen County’s page lists the county offices to call.

← All of Bergen County: county rules, score and offices