Building permits in the Borough of Saddle River, Bergen County, New Jersey come from the borough's own Construction Code Agency under the state Uniform Construction Code1. Zoning is set by the borough's Chapter 2102, not by Bergen County3. Septic and well questions go to the borough Board of Health and the Northwest Bergen Regional Health Commission4.
At a glance
- Building permit
- Required; issued by the borough's Construction Code Agency15
- Zoning
- Borough zoning, Chapter 210 of the borough code; Bergen County does not zone23
- Septic permit
- Health approval required before a building permit; Board of Health and Northwest Bergen Regional Health Commission64
- Owner-builder
- Registration exception for your own home, but permits and inspections still apply7
- Certificate of occupancy
- Required; an as-built certified survey is part of the process8
- RV and tiny-home living
- Not confirmed; ask the borough zoning official9
Who to call
Building permits
Saddle River Construction Code Agency (Building and Construction Department)
Building, electrical, plumbing and fire-protection permits and inspections; zoning review of permit applications; the email address listed is for inspection requests
100 East Allendale Road, Saddle River, NJ 07458
Septic permits
Northwest Bergen Regional Health Commission (serving the Saddle River Board of Health)
Environmental health for Saddle River, including well and septic questions; septic plan review is reached at 201-934-0300
20 West Prospect Street, Waldwick, NJ 07463
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Borough of Saddle River means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Saddle River have zoning, and what does it mean for RVs, tiny homes and lot size?
Yes. The Borough of Saddle River publishes Chapter 210, Zoning, in its adopted code2. Bergen County has no zoning of its own, because New Jersey leaves zoning to municipalities3.
Under state law, minimum lot size, setbacks, lot coverage and building height are set district by district in the borough's ordinance, so the answer for a particular lot depends on its zoning district1011. We could not confirm the borough's district lot sizes, setbacks, or any rule on RVs, tiny homes or accessory dwellings. Ask the borough's zoning official through the Building and Construction Department before you sign a contract9.
Do you need a building permit in Saddle River, and who issues it?
Yes. Construction in Saddle River goes through the borough's own State Uniform Construction Code enforcing agency, the Saddle River Construction Code Agency1. New Jersey requires a construction permit for new construction and for work on existing buildings, with an exception for ordinary maintenance5.
A complete application must be approved or denied within 20 business days of submission12. The borough's office says a construction permit does not replace zoning, planning board, health or septic approval, so those come first or alongside9. Inside the borough, no one at Bergen County issues the building permit; the borough office does.
How do septic and well permits work inside Saddle River?
New Jersey bars a municipality from issuing a building permit until the board of health having jurisdiction certifies the water supply and sewerage facilities6. In Saddle River the Board of Health works through the Northwest Bergen Regional Health Commission4.
The borough tells owners to contact the health office before installing, altering, repairing or abandoning a well or septic system, and lists a septic review line at 201-934-03004. A septic system also has to be inspected before it is covered13. We could not confirm whether a particular Saddle River lot is on public sewer or needs a septic system; the health office and the borough engineer can tell you.
Building a home in Saddle River: the steps, in order
- Ask the zoning official which district the lot is in and what that district allows, before you buy9.
- Get health approval for any septic system or well through the Northwest Bergen Regional Health Commission4.
- File the state construction permit application with the Construction Code Agency, with sealed plans and any prior approvals9.
- Before construction starts, submit a certified location stakeout for the Construction Official's acceptance14.
- Have each stage inspected before it is covered15.
- Before a certificate of occupancy is issued, submit an as-built certified survey8. A home you built yourself also needs the owner's affidavit filed with the construction official16.
What stays with Bergen County and the state, and what to check before you buy
Bergen County's own role is narrow: it reviews subdivisions that abut a County road or drainage facility17. A driveway onto a County road carries a $250 road-access permit fee18, and a driveway onto a State highway needs a state access permit19. For land outside Saddle River's borders, see the Bergen County page.
Building your own home exempts you from new-home builder registration, not from permits or inspections7. Bergen County's typical home value is about $791,11620 and its effective property tax rate is 1.7%21; both are county-level figures, not Saddle River's own.
Watch-outs
- We could not confirm the borough's rules on RVs, tiny homes, accessory dwellings, minimum dwelling size or flood-hazard development; ask the Building and Construction Department before relying on any of them9.
- The Bergen County Department of Health Services is not the septic office for Saddle River addresses; the borough sends septic and well questions to the Northwest Bergen Regional Health Commission4.
- A construction permit does not replace zoning, planning board or health approval, and the borough does not treat a portal entry as an issued permit9.
Sources
- Chapter 96: Construction Codes, Uniform - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
- Table of Contents - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
- Bergen County Standards for Sustainable Land Development—Site Plans, quoted and re-checked
- Northwest Bergen Regional Health Commission (serving the Saddle River Board of Health) (saddleriver.gov)
- The New Jersey State Uniform Construction Code, quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Builder Registration and New Home Warranty for Builders, quoted and re-checked
- Chapter 96: Construction Codes, Uniform - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
- Saddle River Construction Code Agency (Building and Construction Department) (saddleriver.gov)
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- Uniform Construction Code General Information, quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Chapter 96: Construction Codes, Uniform - Borough of Saddle River, NJ (Borough of Saddle River), quoted and re-checked
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Bergen County Standards for Sustainable Land Development—Subdivisions, quoted and re-checked
- Fee Schedule for Site Plan Application, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
- Typical home value (Zillow): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.