Merrimack County, New Hampshire
Town of New London is a town in Merrimack County, New Hampshire. Town of New London adopts its own zoning, so inside its limits Town of New London’s rules apply, not the county’s. Septic permits inside Town of New London come from Town of New London. 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Merrimack County page.
Erecting, relocating, or altering a building, sign, or structure within New London town limits.
“it shall be unlawful to erect, relocate any Building, Sign or Structure, or Alter any Building without first obtaining a Building permit”
Land within New London town limits.
“The Town of New London Zoning Map shows a division of the town into the following districts:”
Zoning districts within New London town limits.
“the official zoning map located in the Selectmen s Office shall be the final authority as to the current zoning status”
R-1 Urban District lots within New London town limits.
minimum lot area with water and sewer: 10000 square feet (R-1 with water and sewer) · minimum lot area without water and sewer: 2 acres (R-1 without water and sewer)
“R-1 w/o water & sewer 150 ft. - - 2 ac. 1 Family/acre”
Agricultural and Rural Residential (ARR) District lots within New London town limits.
road setback: 50 feet (ARR District) · rear setback: 25 feet (ARR District) · side setback: 25 feet (ARR District)
“ARR 200 ft. - - 4 ac. 1 Family/4 acres 50 ft. 25 ft. 25 ft.”
“R-1 w/o water & sewer 150 ft. - - 2 ac. 1 Family/acre 25 ft. 15 ft. 20 ft.”
The portion of a lot within the Shore Land Overlay District in New London town limits.
maximum impervious surface: <= 20 percent (Shore Land Overlay District) · conditional maximum impervious surface: <= 30 percent (Qualifying Planning Board-approved stormwater management system)
“may exceed 20%, up to a maximum of 30%, provided a storm water management system is designed”
Structures in all New London zoning districts.
maximum structure height: <= 35 feet above grade (Unless a variance is approved or a stated exception applies)
“In all districts, Structures shall not exceed 35 feet in Height above Grade unless a Variance is approved”
A recreational vehicle or travel trailer used as a non-paying guest accommodation within New London town limits.
guest trailer duration: <= 30 days per year (One trailer of a non-paying guest)
“Any property owner or lessee may accommodate one Trailer of a non-paying guest for a period not exceeding 30 days in any one year.”
Manufactured homes within New London town limits.
“Manufactured Homes are allowed in all except the R-1 Residential, Institutional and Commercial Zones.”
Subdivision of real property within New London town limits.
“the New London Planning Board adopts the following regulations governing the subdivision of real property in the Town of New London.”
Building-permit fees within New London town limits.
“Building Permit Application/Instructions Building Permit Fee Schedule Zoning Permit Application/Instructions”
Town permit applications within New London town limits.
“All permit applications must be delivered hard copy by mail, drop box or in person with applicable fees included.”
Town of New London does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Proposed construction and other development, including placement of manufactured homes, within New London's mapped floodplain overlay areas.
RV site duration in Zones A and AE: < 180 consecutive days (Unless fully licensed or compliant with the referenced elevation and anchoring standards)
“All proposed Development in any Flood hazard area shall require a permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of New London or Merrimack County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of New London publishes no rule on the point, not that none exists. Merrimack County’s page lists the county offices to call.