Merrimack County, New Hampshire
Town of Boscawen is a town in Merrimack County, New Hampshire. Town of Boscawen adopts its own zoning, so inside its limits Town of Boscawen’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Merrimack County page.
Construction, repair, relocation, removal, or demolition of a building or structure inside Boscawen town limits.
“You need a building permit for all construction that involves the construction, repair, movement to another site, removal, or demolition of any building or structure. All electrical, plumbing and mechanical work needs a separate permit for each trade.”
A building or site subject to approved subdivision or site-plan review inside Boscawen town limits.
“The Building Official shall not approve any certificate of occupancy, nor shall any use of a building or site commence, unless the proposed improvements, and the proposed use of land or buildings, is found to be in compliance with the approved subdivision and/or site plan and the conditions of Planning Board approval.”
Land inside Boscawen town limits.
“This Ordinance shall be known and may be cited as the "Zoning Ordinance of the Town of Boscawen, New Hampshire" referred to herein as "this Ordinance."”
Land inside Boscawen town limits.
number of zoning districts: 7 districts
“The Town of Boscawen, New Hampshire, is hereby divided into seven (7) Zoning Districts to be designated as follows:”
Recreational vehicles on private land inside Boscawen town limits.
guest RV occupancy maximum: <= 24 weeks per calendar year (Guest of the resident of a single-family home.)
“One travel trailer or self-contained recreational vehicle may be parked on the property of, and occupied by the guests of, the resident of a single-family home for not more than 24 weeks in one calendar year.”
Private campsites on otherwise vacant parcels inside Boscawen town limits.
seasonal camping period: April 15 to October 15 (One calendar year.) · weekly permit duration: <= 7 days (May be renewed during the camping season if requirements remain met.)
“A private campsite is permitted on an otherwise vacant parcel in accordance with the following criteria: 1. One private campsite per lot is allowed. A private campsite shall consist of one recreational vehicle or temporary structure, or tents or similar equipment in a reasonable number for private use.”
Manufactured housing inside Boscawen town limits.
“Only new, unused manufactured housing units shall be allowed to be installed in any new manufactured home park or subdivision or any expanded portion of an existing manufactured home park or subdivision.”
Accessory dwelling units inside Boscawen town limits where permitted by the Table of Uses.
maximum ADU gross living area: <= 950 square feet · maximum ADUs per lot: <= 1 ADU (Includes lots containing a two-family dwelling.)
“An ADU shall be permitted only per the Table of Uses via a building permit issued in accordance with the following provisions:”
Private campsites inside Boscawen town limits.
“The applicant shall demonstrate adequate capacity for the storage of sewerage and/or shall demonstrate that arrangements have been made for the lawful removal of sewerage from the site. No onsite discharge of sewerage will be permitted except into a Sewerage Disposal System approved by the NH Department of Environmental Services.”
Subdivisions inside Boscawen town limits.
“No subdivision, site construction, or change of use of land, shall occur in violation of these regulations and the Town of Boscawen Zoning Ordinance.”
Proposed development in a special flood hazard area inside Boscawen town limits.
“15.02 All proposed development in any special flood hazard area shall require a permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Boscawen or Merrimack County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Boscawen publishes no rule on the point, not that none exists. Merrimack County’s page lists the county offices to call.