Randolph, Nebraska (Cedar County) runs its own zoning under Chapter 153 of the city code, with AG, R-1, R-2, R-3, C-1, C-2 and I-1 districts1. We could not confirm a general city building-permit process; the one city permit we confirmed is the written permit under the energy standard2. Septic systems fall under the state Title 124 program, not the city3.
At a glance
- Zoning
- Yes, the City of Randolph has its own zoning code with seven districts1
- Building permit
- A written permit is confirmed for buildings under the city energy standard; the general process is unconfirmed2
- Septic
- State program run by Nebraska DWEE; most systems need no state construction permit4
- Sewer hook-up
- Required within 300 feet of a city sewer main after written notice5
- Minimum lot, AG district
- 100,000 sq ft with septic, 50,000 sq ft on city sewer6
- Minimum lot, R-1 district
- 10,500 sq ft for a single-family home7
- Height limit
- 35 feet for homes in AG and R-189
Who to call
Zoning
City of Randolph (City Administrator/Clerk)
City hall contact for Randolph zoning, the official zoning map and city permits
212 E Broadway, Randolph, NE 68771
Septic permits
Nebraska Department of Water, Energy, and Environment Onsite Section
State onsite wastewater (septic) program for every address in Cedar County, city or not
245 Fallbrook Blvd., Ste. 100, Lincoln, NE 68521
Zoning
Cedar County Zoning Administrator
Zoning and building permits for unincorporated Cedar County, outside Randolph city limits
101 S. Broadway, Hartington, NE 68739
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Randolph means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Randolph, Nebraska have zoning, and what does it mean for lot size and setbacks?
Yes. The City of Randolph administers its own zoning code, Chapter 153, with AG, R-1, R-2, R-3, C-1, C-2 and I-1 districts1. The official zoning map is held in the office of the city administrator, so ask there which district a specific lot sits in1.
The rules change by district. In the AG Agricultural Residential District, a single-family lot needs 100,000 sq ft with a septic system, 120,000 sq ft with a lagoon, or 50,000 sq ft when connected to city sewer, and 150 feet of width in all three cases6. AG setbacks are 35 feet front, 20 feet side and 35 feet rear10, and homes may not exceed 35 feet in height8.
In the R-1 Residential District, a single-family lot needs 10,500 sq ft and 75 feet of width7, with 25 feet front, 5 feet side and 30 feet rear setbacks11. Total structures on an R-1 lot may cover no more than 33% of the lot12.
Mobile homes inside Randolph are allowed in the AG district only as a farm residence for relatives or farm workers13. We could not confirm Randolph's rules for living in an RV or a tiny home, so ask the City Administrator before you plan around either.
Do you need a building permit in Randolph, and who issues it?
Inside Randolph city limits, the city, not Cedar County, handles zoning and permits. We confirmed one city permit: buildings covered by the city energy standard need a written permit from the chief building inspector after plans are filed with the city clerk2. Residential buildings are exempt from the lighting efficiency standards, and mobile homes and modular units are exempt from the energy standard altogether2.
The city reviews those plans within 30 days of filing14, and the filing fee is $30 for a residential building15. We did not find a general building-permit application process or fee schedule for other construction, so call the Randolph City Administrator before you start work.
Nebraska's state building code applies in a city that adopts it, or that has not adopted an authorized local code within two years after a state update16. We could not confirm which construction code Randolph has adopted17.
How do septic permits work inside Randolph?
Septic permits in Randolph come from the state, not the city. The Nebraska Onsite Wastewater Program administers Title 1243, and most systems need no state construction permit, though a permit is required where wastewater quantity, quality or site conditions fall outside authorization by rule4. The Nebraska Department of Water, Energy, and Environment (DWEE) Onsite Section is the office to ask18.
If your lot is near a city sewer line, septic may not be an option. Every building erected in Randolph must be connected to the sewer system at the time of construction5, and the owner of any premises within 300 feet of a sewer main must connect after written notice from the sewer commissioner5. Sewer connection starts with a written application to the city clerk19.
Statewide, a system on a lot smaller than 3 acres in a new development area needs DWEE subdivision review first20.
Building a home in Randolph: the steps, in order
- Ask the Randolph City Administrator which zoning district the lot is in; the official zoning map is kept in that office121.
- Check the district's lot size, setbacks and height limits against your plans67.
- Ask the city which building permits apply to your project; the energy-standard permit goes through the city clerk and chief building inspector2.
- Apply in writing to the city clerk for a sewer connection if a city main serves the lot19.
- If no sewer reaches the lot, contact the state DWEE Onsite Section about a septic system18.
What stays with Cedar County, and what to check before you buy in Randolph
Land outside Randolph city limits is a different question. The Cedar County zoning regulations require a building permit for buildings erected, moved or structurally altered in the county zoning area, with exceptions for agricultural nonresidential buildings in AG districts and small improvements22. Those county rules cover unincorporated Cedar County; see the Cedar County page for that land, and the23 office for county permits.
Before you buy inside the city, confirm the district, the sewer status of the lot, and whether the lot sits in a mapped flood hazard area; we could not confirm Randolph's floodplain rules. For wells, the state requires a permit in a groundwater management area unless an exemption applies24, and we could not confirm well rules inside city limits. Cedar County's median property tax bill is $1,827 a year25.
Watch-outs
- Randolph's online code may not reflect the most recent ordinances, so confirm current rules with the City Administrator before relying on any figure here1.
- Minimum lot sizes in the AG district are far larger than in R-1, so a lot's district decides what you can build6.
- We could not confirm Randolph's rules on RVs, tiny homes, accessory dwellings, certificates of occupancy, driveways, floodplain development or owner-builder permits; the City Administrator is the office to ask2.
Sources
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 150 National Construction Codes (§150.35-150.39) (Randolph), quoted and re-checked
- Onsite Wastewater Program, quoted and re-checked
- Nebraska Department of Water, Energy, and Environment - Onsite Wastewater Treatment Facilities: Permits (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 52 Sewers (§52.02-52.10) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 153 Zoning Code (sections 153.019-153.050, 153.051) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 150 National Construction Codes (§150.35-150.39) (Randolph), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 150 National Construction Codes (§150.35-150.39) (Randolph), quoted and re-checked
- Nebraska Revised Statute 71-6403: State building code; adopted; amendments (Nebraska statewide rule), quoted and re-checked
- Randolph, NE Code of Ordinances - Chapter 150 National Construction Codes (§150.35-150.39) (Randolph), quoted and re-checked
- Nebraska Department of Water, Energy, and Environment Onsite Section (dwee.nebraska.gov)
- Randolph, NE Code of Ordinances - Chapter 52 Sewers (§52.02-52.10) (Randolph), quoted and re-checked
- Title 124 – Onsite Wastewater Treatment Systems, quoted and re-checked
- City of Randolph (City Administrator/Clerk) (randolphne.com)
- Cedar County Zoning Regulations, quoted and re-checked
- Cedar County Zoning Administrator (cedarcountyne.gov)
- Nebraska Revised Statute 46-735, quoted and re-checked
- Median property tax bill: Bolthole Index county data
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.