Richland County, North Dakota
Hankinson is a city in Richland County, North Dakota. 12 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Richland County page.
Construction, alteration, or removal projects inside Hankinson city.
structure area threshold: > 100 square feet · project cost threshold: > 2000 USD (including labor and materials during the calendar year)
“The City of Hankinson requires building permits be obtained prior to beginning any construction, alteration or removal projects within the City when a structure is greater thant 100 square feet and/or the project cost including labor and materials exceeds $2,000.”
New residences, new commercial buildings, and qualifying additions inside Hankinson city.
“Inspections by the city's building inspector shall only be conducted on and required of new residences, new commercial buildings, and additions to residences and commercial buildings, which include new foundations to either a residence or a commercial building.”
Land occupancy and use, and buildings erected, altered, extended, or changed in use inside Hankinson city.
issuance period after approved erection or alteration: <= 30 days
“No land shall be occupied or used and no building hereafter erected, altered or extended shall be used or changed in use until a certificate of occupancy shall have been issued by the zoning administrator, stating that the building or proposed use thereof complies with the provisions of this chapter.”
Recreational equipment and RV-type equipment inside Hankinson city.
public-right-of-way parking duration: <= 48 hours
“Recreational equipment may not be occupied or used for human habitation in any location not approved for such use by the city. Recreational equipment may be parked upon private premises, if vacant and not used for human habitation.”
Mobile homes in the A Agricultural District inside Hankinson city.
“In an agricultural district, the following uses are permitted: agriculture and agricultural buildings, cemeteries, churches, one- and two-family dwellings and mobile homes, existing railroad rights-of-way, home occupations, parks or other open land recreational uses.”
Construction of a private wastewater disposal system inside Hankinson city where public sewer is unavailable under § 40-121(d).
“Before commencement of construction of a private wastewater disposal system, the owner shall obtain a written permit signed by the supervisor.”
Permitted private wastewater disposal systems inside Hankinson city.
inspection timing after notice: <= 72 hours
“A permit for a private wastewater disposal system shall not become effective until the installation is completed to the satisfaction of the supervisor.”
Private sewage disposal inside Hankinson city.
“Except as hereinafter provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage.”
Construction, reconstruction, alteration, grading, or repair of a public driveway inside Hankinson city.
“It shall be unlawful to construct, reconstruct, alter, grade or repair any public street, sidewalk, driveway, curbs or gutters without having first secured a permit therefor, unless said work is performed by the city contractor.”
Construction or development inside any special flood hazard area established by Hankinson Code § 16-23(b).
“A development permit shall be obtained before construction or development begins within any special flood hazard area established in section 16-23(b).”
Building-code and zoning permits inside Hankinson city.
“Fees under the building code shall be as established by resolution and adopted by the city council.”
Building-permit applications inside Hankinson city.
“See documents below for information and application for building permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Hankinson or Richland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Hankinson publishes no rule on the point, not that none exists. Richland County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Hankinson means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.